AGENDA AGENDA • Introduction to TMG Inc. •Objective • Project Management Overview • Project Management Phases – Needs Analysis – Functional Specification – Detailed Specification – Project Tracking – FAT/SAT Procedures – Construction/Commissioning • Summary Overview Overview • General Guidelines – Same structure $50k to $5m projects – Automation usually represents 10% to 30% of the total project capital cost. – Materials usually represents 50% to 70% of the total automation cost. • Project Timeline • Team Members Project Timeline Project Timeline Project Tracking Needs Analysis Functional Spec Detailed Spec Design/ Build FAT Construction SAT Commissioning Needs Analysis Needs Analysis Project Tracking Functional Spec Detailed Spec Design/ Build FAT Construction SAT Commissioning Needs Analysis Needs Analysis Needs Analysis • Objective – Develop common, well understood: • Measurable Goals •Priorities • Schedules Functional Specification Functional Specification Project Tracking Detailed Spec Design/ Build FAT Construction SAT Commissioning Needs Analysis Functional Spec • Objective – Provide all of the necessary design details for: • Project Budgeting • Management approval • Vendor bids Functional Spec . Members Project Timeline Project Timeline Project Tracking Needs Analysis Functional Spec Detailed Spec Design/ Build FAT Construction SAT Commissioning Needs Analysis Needs Analysis Project. structure $50k to $5m projects – Automation usually represents 10% to 30% of the total project capital cost. – Materials usually represents 50% to 70% of the total automation cost. • Project Timeline •. Introduction to TMG Inc. •Objective • Project Management Overview • Project Management Phases – Needs Analysis – Functional Specification – Detailed Specification – Project Tracking – FAT/SAT Procedures –