1. Trang chủ
  2. » Tất cả

Luu y can nho lam thau nh91 1 va nh91 2

5 0 0

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 5
Dung lượng 23,73 KB

Nội dung

Technical Proposal 1 Site Organization 1 Method Statement 1 Mobilization Schedule 1 Construction Schedule 1 Equipment 1 Personnel 1 Others Method Statement Bidders must submit (1 ) Detailed method sta[.]

TECHNICAL PROPOSAL - Site Organization - Method Statement - Mobilization Schedule - Construction Schedule - Equipment - Personnel - Others Page of Method Statement Bidders must submit: (1.) Detailed method statement for each major activity (a) Traffic control (b) Clearing and Grubbing (c) Excavation (d) Embankment (e) Routine Maintenance (f) Surface treatment (g) Treated Base/Subbase (h) Asphalt Plant Mix (i) Structures / Bridges (j) Drainage (k) Environmental management (2.) Detailed Bidders requirements for possession of the site (3.) Schedule of Subcontractor1 Item Element of Work Approximate value Name and Address Statement of of Subcontractor similar works executed Mobilization Schedule Construction Schedule Bidders must submit: (1.) Critical path schedule and time-distance programme, with resource allocations based on Bidder's work programme The Bidder shall enter in this schedule the details of the proposed programme of works and site possession in order that the Employer may assess the Bidder's approach to the work and the adequacy of his proposed resources to allow for the implementation of the programme The bidder shall enter in this schedule a list of the major sections and appropriate value of the work for which he proposes to use subcontractors, together with the name and addresses of the proposed subcontractors Page of The Bidder shall include additional pages necessary to complement and accurately describe the proposed work programme and possession of site schedule Personnel The Bidder must demonstrate that it has the personnel for the key positions that meet the following requirements: No General Experience (years) Position In Similar Works Experience (years) Contract Manager 12 Quality Control Manager [QC Manager] 10 Road Engineer 12 Structure/Bridge Engineer 12 Laboratory Manager [Materials Engineer] 12 6 Environmental Management Officer [EMO] At minimum the following key site management and technical personnel proposed by the Bidder for the Contract(s) shall comprise: Contract NH91-1 Position Contract NH91-2 contracts [both NH91-1 and NH91-2] Contract Manager 1 Quality Control Manager [QC Manager] 1 Quantity Engineer [or Quantity Surveyor] or equivalent 1 Safety Person 1 Road Engineer 2 Bridge Engineer 2 Laboratory Manager [Materials Engineer] 1 Environmental Management Officer [EMO] 1 Shop Drawing Engineer 1 Page of The Bidder shall provide details of the proposed personnel and their experience records using Forms PER-1 and PER-2 included in Section IV, Bidding Forms The bidder may be required to substantiate the qualifications and the availability of of the proposed personnel for the Employer’s verification 2.2.6 Equipment The Bidder must demonstrate that it has the key equipment listed hereafter: No Equipment Type and Characteristics Minimum Number required for award of NH91-1 Minimum Number required for award of NH91-2 Minimum Number required for award of both NH91-1 and NH91-2 10 16 Dump truck, 10 -12 tons Concrete mixer tractor >5m3 Crane, 10 ton Crane, ≥ 35 ton Drag shovel 2.3m3 2 Excavator, 1.6m3 4 Excavator, 1.25m3 2 Bull dozer, 140 CV 1 Motor grader, engine output above 150KW 1 10 Steel wheel roller, 6-8 tons 2 11 Roller, tons 4 12 Roller, 16 tons 6 13 Roller, 25 tons 4 14 Tired roller, 14 tons 15 Hot Mix Plant (Batch Type) with electronic controls and vibratory screens, minimum 40 TPH 1 16 Paver Finisher Hydrostatic with sensor control, 100TPH 1 Page of 5 6 17 Aggregate paver 50-60m3/h 18 Concrete mixer, minimum 40 m3/h 19 Bituminous spray truck, ton 2 20 Road marking machine 1 21 Barge , 200 tons 3 22 Crane, 80 tons or Bridge crane 2 23 Pile pressing >150 tons 6 24 Bored pile driller ED 4 2 The Bidder shall provide further details of proposed items of equipment using the relevant Form in Section IV (Bidding Forms) The Employer may request the bidder to provide evidences to demonstrate the access to and availability of the proposed equipment Page of

Ngày đăng: 08/03/2023, 22:09

w