Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống
1
/ 17 trang
THÔNG TIN TÀI LIỆU
Thông tin cơ bản
Định dạng
Số trang
17
Dung lượng
4,57 MB
Nội dung
“Where residents feel the comforts of home” GRE-35-5.84 US 35 AT VALLEY/TREBEIN RD ELIMINATION OF AT-GRADE INTERSECTION WITH NEW INTERCHANGE U.S 35 at Valley/ Trebein Rd For more info on the project including drone videos: https://www.greenecountyohio.gov/1652/TrebeinValleyUS-35Interchange-Project Part of final component of long-term project to upgrade US 35 from IR75 (Dayton) to IR 64 (Charleston, WV) Township was able to negotiate a land Donation for the project $820,000.00 26 Acres Valley Springs Farms $201,500.00 6.5 Acres Martin Marietta Significant Users of the Intersection and Roadway • • • • • • • • • Wright-Patterson Air Force Base Ohio University Sinclair Community College Cedarville University Central State University Wilberforce College Clark State College Wright State University Lewis A Jackson Regional Airport • Greene County Career Center • Aviation Maintenance Technician Program • Beavercreek Schools • Cities of Beavercreek, Xenia, Fairborn, etc • Greene County Residents • Greene County Businesses • Traffic Driving thru Greene County on US 35 Crash Information • Majority of the 175 mile system is free flowing facility except for a 1.7 mile portion of US 35 • This is first traffic signal after driving 130 miles (or hours) west across the State of Ohio on US 35 from Point Pleasant, WV • 2017 HSIP (Highway Safety Improvement Program) o Ranked 105th in the state for suburban intersections for crashes from 2013-2017 • While zero fatalities have occurred at this intersection in the last five-plus year period, the injury crashes alone at this location exceed the statewide average threshold, which underscores the critical safety issues that need to be addressed • Several suburban non-freeway segments approaching the intersection are also ranked red (high priority) in addition to the intersection • Removing the stop-condition on US-35 via construction of an interchange will reduce the rate of high-injury, rear end crashes Both the volume and severity of crashes during the most recent five-year period support the conclusion Highway safety is a critical need for the construction of an interchange at US-35 and Trebein/Valley Roads 9,337 new jobs proposed with 1.8 miles of the intersection 575 new homes proposed with 1.5 miles of the intersection Economic/Residential Development 2019 48% of Residential Greene County Construction Valuations were in Beavercreek Township 77.28% higher than any jurisdiction 8.9% increase from 2018 36% of Commercial Greene County Construction Valuations were in Beavercreek 62.77% increase from 2018 Township had the second highest Commercial Valuations in the County MIX PUD Valley Springs TOTAL Estimated New Employment: 2,020 – 5,040 jobs MIX PUD Valley Springs NW Area Office/Business Park buildings totaling 790,000 square feet 1,000-2,600 employees Mix of upper and middle office management Research/Engineering Light manufacturing/warehousing Medical research and development Retail/Service establishments catering to above professions Janitorial and other support staff for above professions EP Area High-tech/Research Park facilities 4,500 to 9,000 square feet per building High technology and medical research (400-1200 positions) Restaurant and hotel staff (200-400 positions) MIX PUD Valley Springs SH Area Hotel/Restaurants facilities Hotel management (20-40 positions) Hotel service and maintenance (200-400 positions) Restaurant and other services (200-400 positions) Stonehill Village PUD EMPLOYMENT ESTIMATES ZONE 750,000 – 1,250,000 Total Square Feet New Buildings 556 Health Care jobs 1,200 Retail/Mercantile jobs 2,541 Lodging Jobs Ohio University/Russ Research Center 72 Acre Campus 194,000 square feet of office and light manufacturing space on 60 acres Engineering, IT, development, design, manufacturing firms 13 firms located on campus Current number of jobs 200 Proposed 2021 new jobs 300 Commercial PUD approved in 2020 for 14 Acres New 80,000 to 100,000 square feet building 2021 Local Public Investments Investments by Greene County Airport in Last years New Hanger-$500,000 Water/Sewer Extension on site - $350,000 Runway Extension – $1 million Completed in 2018 Total 5000-feet Ramp Modifications - $ million Taxiway Modification - $600,000 Navigation Improvements - $180,000 Investments by Airport in Next years New Weather Station - $150,000 Infrastructure modifications - $150,000 Investment by Greene County Career Center Hanger/Classroom - $1 million Local Public Investments Water/Sewer Project to Airport and Surrounding Area $2,001,835 Beavercreek Twp.-OPWC Grant $653,010 Beavercreek Twp.-$100,000 Beavercreek Twp.-In-Kind $48,825 Greene County Sanitary Eng.-Loan $300,000 Greene County Commissioners-$900,000 Beavercreek Fire Station 66 at Valley Rd/Dumford Rd/Regional Airport - $6 million Beavercreek Fire Station at Fairground Rd/Trebein Rd $5 million Planned in next Years Intersection Improvements at Dayton Xenia Rd at Trebein Rd - $1.5 million Intersection Improvements at Hilltop Rd at Trebein Road - $1.5 million Roundabout at Dumford Rd/Valley Rd - $2 million Valley Bell Connector - $ million Residential Development The Township has approved 3,943 new homes 3,029 have been completed 84% of the approved developments have been completed As of 04/26/2021, 378 lots are considered shovel ready 2020 Approved Developments River Reserve two new sections White Barn Trails new section Nathanial's Grove three new sections River West & Scarborough two new sections Claiborne Greens final section 2021 Developments in PUD Process or Design Phase 99 bed Nursing Home construction begins in 2021 - $10 million Five new Housing Developments 575 additional homes within 1.5 miles of the U.S 35/Trebein intersection Questions? ... campus Current number of jobs 200 Proposed 2021 new jobs 300 Commercial PUD approved in 2020 for 14 Acres New 80,000 to 100,000 square feet building 2021 Local Public Investments Investments by... two new sections Claiborne Greens final section 2021 Developments in PUD Process or Design Phase 99 bed Nursing Home construction begins in 2021 - $10 million Five new Housing Developments... 3,029 have been completed 84% of the approved developments have been completed As of 04/26 /2021, 378 lots are considered shovel ready 2020 Approved Developments River Reserve