1. Trang chủ
  2. » Ngoại Ngữ

TrexCommercial_Clemson_Bioscience_Glenlake_Glass_Railing

1 2 0

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 1
Dung lượng 1,79 MB

Nội dung

Case Study: Clemson Bioscience University Scientific Research Building Project Information Project: Clemson University Bioscience Location: Clemson, SC Architect: Perkins + Will GC: DPR Construction Completion: December 2012 Scope: This project, with a six-month duration, called for more than 200 linear feet of our Glenlake stainless steel tube infill railing, as well as 350 feet of our Track Rail glass railing Grade 316 stainless steel was utilized for all exterior locations, which hold up to environmental exposure to heat, moisture, and airborne pollutants Glenlake is a low-maintenance choice for outdoor applications Stainless steel tube infill creates a clean, linear design All lateral tubing was bent to create a radius Free-standing sections were placed in wall on the stair landing openings along walkways Optional post-mounted handrails were utilized on the stair application Track Rail glass railing utlized on interior stairs and balcony overlooks 7008 Northland Drive, Suite 150 Minneapolis, Minnesota 55428 p: 1-877-215-7245 w: trexcommercial.com © 2017 Trex Commercial Products, Inc All rights reserved Trex® is a federally registered trademark of Trex Company, Inc., Winchester, Virginia

Ngày đăng: 24/10/2022, 16:58

TÀI LIỆU CÙNG NGƯỜI DÙNG

  • Đang cập nhật ...

TÀI LIỆU LIÊN QUAN