PROJECTMANAGEMENTFRAMEWORKCONTRACT
1
Business OpportunitiesforUKplcfromFusion & ITER
J. SERRANO - PROJECT OFFICE/PROJECT MANAGEMENT
2
PM Activities @ F4E
Project Management Support Activities
Liaison with ITER IO
Internal F4E
Configuration Control Management
PROJECT MANAGEMENT FRAWEWORK CONTRACT SEMINAR – CULHAM SC 11
TH
OCTOBER 2012
System Engineering
Quality Assurance
Planning & Schedule
Procurement Arrangements
Risk Management
Project Management Systems / Tools
Monitoring of Implementation Contracts / Grants
Export Control
Programmatic Documents
Cost Management
3
PM Activities @ F4E
Project Management Support Activities
Liaison with ITER IO
Internal F4E
Configuration Control Management
PROJECT MANAGEMENT FRAWEWORK CONTRACT SEMINAR – CULHAM SC 11
TH
OCTOBER 2012
System Engineering
Quality Assurance
Planning & Schedule
Procurement Arrangements
Risk Management
Project Management Systems / Tools
Monitoring of Implementation Contracts / Grants
Export Control
Programmatic Documents
Cost Management
4
PM Activities for FwC Support
Project Management Support Activities
Liaison with ITER IO
Internal F4E
Configuration Control Management
PROJECT MANAGEMENT FRAWEWORK CONTRACT SEMINAR – CULHAM SC 11
TH
OCTOBER 2012
System Engineering
Risk Management
Project Management Systems
Cost Management
Export Control
WP 1
WP 2
WP 3
WP 4
WP 5
WP 6
CE Marking Directives
WP 7
In Definition
PROJECT MANAGEMENT FRAWEWORK CONTRACT SEMINAR – CULHAM SC 11
TH
OCTOBER 2012
5
Presentation of PM FwC
Multi Framework Service Contract (MFC), in cascade, without reopening of competition
→ No commitment by F4E to sign specific contracts
→ To be concluded with several providers → at least 3 operators
→ N Task Orders will be issued to awarded companies within each of the Work Packages (WP)
after signature
General Scope
• To support F4E in the execution and continuous improvement of ProjectManagement tasks
already deployed at F4E, for both:
• Internal duties: support to ITER technical teams, support to Project Office activities
• External duties: support forITER IO induced tasks
• Support to be provided as “in-source” and/or “outsourced” (= at F4E / outside F4E premises)
Duration
• Maximum duration of 4 years
Budget Ceiling
• Overall Budget Ceiling: 5 M€
6
Presentation of PM FwC
Tendering Schedule Key Milestones
o Publication of Call for Tender: mid-October
o Tenders submission deadline: mid-December
o Evaluation Report issued: mid-March 2013
o Publication of Award Decision: 1
st
April 2013
o FwC signed: 1
st
May 2013
Work Packages
Six Work Packages: Risk / Configuration Control & System Engineering / PM Systems Support / Cost
Management Support / Export Control / CE Marking Support
No specific rules on Lots are foreseen. Each WP will be awarded separately
Exclusion Criteria (eligibility to tender), then Selection Criteria (capacity to comply with the
contract) → then evaluation of offers
Awarding
Best value for money
Combination of Technical Award Criteria / Financial Award Criteria
PROJECT MANAGEMENT FRAWEWORK CONTRACT SEMINAR – CULHAM SC 11
TH
OCTOBER 2012
7
Scope of Work / Work Packages
• Risk Identification (procurements) and Evaluation of the Impact of the analyses performed with
regards to schedule, cost and general strategy
• Development of Risk Mitigation Plans and the evaluation of the residual risk level
• Follow up of risk assessments and mitigation actions, preparation of adequate reporting,
simulation and scenario definition
• Development of uncertainty analysis of the projects, both on cost and schedule uncertainty
• Optimization of the risk log & update of the risk information due to changes in the F4E processes
In-sourcing and outsourced Tasks
Expertise: Risk Management, Advanced User of Primavera P6, ProjectManagement Expertise
Ceiling: 300 k€ / year
Work Package 1 – Risk Management Support
PROJECT MANAGEMENT FRAWEWORK CONTRACT SEMINAR – CULHAM SC 11
TH
OCTOBER 2012
8
Scope of Work / Work Packages
• Coordination of inputs for impact analysis of the PCRs
• Tracking, monitoring and status reporting of the DRs, Non-conformities and PCRs
• Development of tools (tracking and monitoring the DRs and NCs, evaluation of PCRs)
• Identification and management of the baseline documentation
• Coordination of the inputs for Requirements management and Verification Database (RMVDB)
• Configuration, management and control of the Requirements Management and Verification
Database (DOORS) data (loading of requirements, loading of suppliers’ data, baselines control)
• Past (previously signed PAs) (data loading of requirements, suppliers’ data and setting baselines)
In-sourcing and outsourced
Expertise: science/technical projects, configuration management, DOORS Rationale Database and
requirements management, documentation management, databases and reporting tools
Ceiling: 200 k€ / year
Work Package 2 – Configuration Management and
System Engineering Support
PROJECT MANAGEMENT FRAWEWORK CONTRACT SEMINAR – CULHAM SC 11
TH
OCTOBER 2012
9
Scope of Work / Work Packages
• Identification and Specification of requirements for system enhancements and liaison with F4E IT
department during the development / implementation
• Ongoing development of the configuration of the reporting tools
• Development of systems configuration from additional planned systems
• Specification and development of performance reports and the specification of any additional
data/coding requirements to allow report production through the existing data warehouse
environment
• Routine updating of data within the reporting systems and data verification
• Identification, analysis and follow up of data anomalies within the system
N.B. Software delivery, maintenance and development are implemented by the F4E IT Unit and are
outside the scope of this task.
In-sourcing
Expertise: Advanced Cobra user and Cobra configuration for EVM, Knowledge of Primavera,
knowledge of SAP business objects. Expertise in Project Controls
Ceiling: 300 k€ / year
Work Package 3 – ProjectManagement Systems Support
PROJECT MANAGEMENT FRAWEWORK CONTRACT SEMINAR – CULHAM SC 11
TH
OCTOBER 2012
10
Scope of Work / Work Packages
Support to F4E in the development and management of:
• Cost estimates
• Cost baseline and budget data analyses
• Follow-up of cost baseline and change process
• Prices indexation analyses
• Budget reports
In-sourcing
Expertise: Experience with cost estimating (WinEst), budget analyses and reporting, Project
Management knowledge, Science and Technology Projects
Ceiling: 200 k€ / year
Work Package 4 – Cost Management Support
PROJECT MANAGEMENT FRAWEWORK CONTRACT SEMINAR – CULHAM SC 11
TH
OCTOBER 2012
[...]... (technical areas) and on the updates of the dual use council regulation Typically outsourcing Expertise: Technical competence in nuclear/aerospace/TLC & administrative/legal &projectmanagement& Dual Use Regulation Ceiling: 100 k€ / year PROJECTMANAGEMENT FRAWEWORK CONTRACT SEMINAR – CULHAM SC 11TH OCTOBER 2012 11 Scope of Work / Work Packages Work Package 6 – CE Marking Support • Identification of components/assemblies/equipment... Call for Tender: mid-October 2012 o Tenders submission deadline: mid-December 2012 DISCLAIMER THIS PRESENTATION CONTAINS SAME INFORMATION AS OFFERED DURING PM FwC INFODAY ON 12TH JULY AT F4E IN BARCELONA IN ORDER TO KEEP FAIR TREATMENT OF ALL POSSIBLE TENDERERS INFODAY INFORMATION HAS NOT BEEN UPDATED PLEASE REFER TO TENDER DOCUMENTATION FOR UPDATED AND FINAL INFORMATION ONCE PUBLISHED PROJECT MANAGEMENT. .. N.B.: an contractfor CE policy definition has been established by ITER IO organization in order to draft guidelines to DAs Typically Outsourcing Expertise: CE Marking consultancy, support to manufacturers or their representatives, technical expertise in the domains covered by the applicable CE directives to ITER in-kind (EU DA) Ceiling: 50 k€ / year PROJECT MANAGEMENT FRAWEWORK CONTRACT SEMINAR –... NOT BEEN UPDATED PLEASE REFER TO TENDER DOCUMENTATION FOR UPDATED AND FINAL INFORMATION ONCE PUBLISHED PROJECT MANAGEMENT FRAWEWORK CONTRACT SEMINAR – CULHAM SC 11TH OCTOBER 2012 13 Follow us on: www.f4e.europa.eu www.twitter.com/fusionforenergy www.youtube.com/fusionforenergy ... requirements from the directive that have to be met for the specific items (and need of a Notified Body) • Identify the European Harmonized Standards that should be applied to assure compliance to CE marking essential requirements • Evaluate compliance to CE marking essential requirements • Support with the procedures for CE marking compliance declaration and the issuing of the technical file N.B.: an contract. ..Scope of Work / Work Packages Work Package 5 – Export Control Support • Items classification of components and technologies according to Dual Use Council Regulation • Transfers analysis for need of dual use authorization/export authorization • Licensing submissions requests of dual use authorizations to the competent authorities • Dual Use regulation compliance assessment of existing . PROJECT MANAGEMENT FRAMEWORK CONTRACT
1
Business Opportunities for UK plc from Fusion & ITER
J. SERRANO - PROJECT OFFICE /PROJECT MANAGEMENT.
Project Management Support Activities
Liaison with ITER IO
Internal F4E
Configuration Control Management
PROJECT MANAGEMENT FRAWEWORK CONTRACT