Tài liệu FIELD PERFORMANCE TESTING OF COPPER PERMANENT LINKS AND CHANNEL Class D, Class E, Class EA pdf

Tài liệu FIELD PERFORMANCE TESTING OF COPPER PERMANENT LINKS AND CHANNEL Class D, Class E, Class EA pdf

Tài liệu FIELD PERFORMANCE TESTING OF COPPER PERMANENT LINKS AND CHANNEL Class D, Class E, Class EA pdf

... Performance Testing V15 060508 Page 1 of 11 FIELD PERFORMANCE TESTING OF COPPER PERMANENT LINKS AND CHANNEL Class D, Class E, Class E A (10GBE) This is a living document and is subject to change. This ... Networks and by ADC KRONE Australia as acceptable adaptors for testing of permanent links to Class D performance. But with the release of...

Ngày tải lên: 12/12/2013, 12:15

11 469 0
PERFORMANCE TESTING OF COPPER PERMANENT LINKS AND CHANNEL

PERFORMANCE TESTING OF COPPER PERMANENT LINKS AND CHANNEL

... 050111 Page 2 of 9 Performance Testing of Permanent Links and Channels Testing of telecommunications Permanent Links and Channels to determine performance compliance to Class D (using ... 4000/4100/4300 & DTX-1200/1800 Field Performance Testing V10 050111 Page 1 of 9 PERFORMANCE TESTING OF COPPER PERMANENT...

Ngày tải lên: 27/10/2013, 17:15

9 389 0
Tài liệu KRONE - Guide - TESTING - Field Performance Testing of Copper & Permanent Link Chanel pdf

Tài liệu KRONE - Guide - TESTING - Field Performance Testing of Copper & Permanent Link Chanel pdf

... Field Performance Testing V10 050111 Page 2 of 9 Performance Testing of Permanent Links and Channels Testing of telecommunications Permanent Links and Channels to determine performance ... acceptable adaptors for testing of permanent links to Class D performance. But with the release of the PM14A, they are now NOT acceptable for testing...

Ngày tải lên: 24/01/2014, 03:20

9 530 0
Tài liệu KRONE - Guide - TESTING - Field Performance Testing of Copper & Permanent Link Chanel (1) ppt

Tài liệu KRONE - Guide - TESTING - Field Performance Testing of Copper & Permanent Link Chanel (1) ppt

... increase in the requirement for cost effective video surveillance and security monitoring. Fuelled by this demand has been the development of a number of technologies to reduce the cost of implementing what ... active devices involved and the passive infrastructure supporting them. As a result of this requirement and other circumstances, coupled with the ongoing march of IP co...

Ngày tải lên: 24/01/2014, 03:20

2 299 0
KRONE - Guide Book - TESTING - Field Performance Testing of Copper & Permanent Link Chanel

KRONE - Guide Book - TESTING - Field Performance Testing of Copper & Permanent Link Chanel

... and heads, these are not acceptable for Class D or E Permanent Links and Channels. Field Performance Testing V10 050111 Page 2 of 9 Performance Testing of Permanent Links and Channels ... acceptable adaptors for testing of permanent links to Class D performance. But with the release of the PM14A, they are now NOT acceptable for testing Cla...

Ngày tải lên: 26/10/2013, 19:15

9 486 0
Tài liệu ADC KRONE - Guide - FO - Field Performance Testing of Fiber Link - ISO 11801 ppt

Tài liệu ADC KRONE - Guide - FO - Field Performance Testing of Fiber Link - ISO 11801 ppt

... for MMF) Clean all the test cord connector ends and connect them together. Measure the 3 connected Test Cords (launch cord, field calibration cord, tail cord) and record ... Method C of TIA/EIA 526-14-A 1-Test Cord Method of Reference Setting = Cl 9.1.2 of ISO/IEC 14763-3 Ed2 Similar to Method 2 of IEC 61280-4-1 Similar to Method B of TIA/EIA 526-14-A...

Ngày tải lên: 10/12/2013, 02:15

12 560 0
Tài liệu KRONE - White paper - Testing Copper Permanent Link and Channel docx

Tài liệu KRONE - White paper - Testing Copper Permanent Link and Channel docx

... Field Performance Testing V5 030131.doc Page 1 of 8 PERFORMANCE TESTING OF COPPER PERMANENT LINKS AND CHANNEL ... or PSACR, but Class D does.) Ware On Test Leads & Test Plugs All of the testers have issues with Permanent Link lead and plug wear. The coiling and uncoiling of test leads during their ....

Ngày tải lên: 20/12/2013, 22:15

8 433 0
Tài liệu PERFORMANCE TESTING OF OPTICAL FIBRE LINKS pptx

Tài liệu PERFORMANCE TESTING OF OPTICAL FIBRE LINKS pptx

... OF Testing ADC KRONE Requirements V7_1&3T Dr2Page 9 of 12 25 OTDR Testing, General Requirements 1. Use a Launch Cord and a Tail Cord for OTDR testing. [These Launch and tail ... for length and attenuation/insertion loss measurement. OTDR Result showing a good trace capable of measuring length and component insertion losses. Reading OTDR Results for Length and...

Ngày tải lên: 22/12/2013, 12:15

12 354 0
w