Case Study - PBE - TrueNET - Omnicom

Case Study - PBE - TrueNET - Omnicom

Case Study - PBE - TrueNET - Omnicom

... TrueNet System, please call 1-8 0 0-7 7 5-5 766 or visit our Web site at: www.kroneamericas.com. APPLICATION REPORT KRONE ® Incorporated 6950 South Tucson Way Englewood, CO 80112 Toll-Free: 1-8 0 0-7 75-KRONE ... was to install a high-performance, end- to-end communications system that would fully-support all foreseeable applications,” Chauza noted. “Ultimately, OMS chose the KRON...

Ngày tải lên: 04/11/2013, 11:15

4 225 0
Case Study - PBE - Glaxo Smith Klein

Case Study - PBE - Glaxo Smith Klein

... year GSK Consumer Healthcare produces -among many others -nine billion tablets to relieve stomach upsets, -six billion tablets for pain relief tablets and -6 00 million tubes of toothpaste. 23 ... PremisNET 23 CASE STUDY GlaxoSmithKline New HQ Brentford, Middlesex 23 23 WHO are GSK? GlaxoSmithKline (GSK) is a world leading research-based pharmaceutical company with ... Flexibility -...

Ngày tải lên: 16/10/2013, 05:15

26 427 0
Case Study - PBE - Data Center - Next Links ISP Data Centres

Case Study - PBE - Data Center - Next Links ISP Data Centres

... and Europe. Together with Concentric Network, a whol- ly owned sub- sidiary of NEXTLINK, the company offers end-to-end com- munication ser- vices, including local and long distance voice, digital ... coordi- nator of KRONE’s TrueNet solution. Fetter can be reached at 30 3-7 9 0-2 619 or at bfetter@kroneamericas.com. More information about TrueNet is available at www .truenet- system.co...

Ngày tải lên: 16/10/2013, 05:15

4 327 0
ADC KRONE - Case study - PBE - Utah University

ADC KRONE - Case study - PBE - Utah University

... Toll Free: 1-8 0 0-3 6 6-3 891 • Outside of North America: + 1-9 5 2-9 3 8-8 080 Fax: + 1-9 5 2-9 1 7-3 237 • For a listing of ADC’s global sales office locations, please refer to our web site. CASE STUDY ... best end-to-end cabling solution for all of our criteria. The new Engineering Building was our very first all -TrueNet application. We’ve since decided to convert...

Ngày tải lên: 16/10/2013, 05:15

4 352 0
Case Study - PBE - Ministry of Natural Resource, Mining & Energy

Case Study - PBE - Ministry of Natural Resource, Mining & Energy

... CASE study KRONE (Australia) Holdings Pty Limited 2 Hereford Street Berkeley Vale NSW 2261 PO Box ... not the decisive factor, certainly helped in influencing the decision we made.” BEFORE AFTER CASE study KRONE (Australia) Holdings Pty Limited 2 Hereford Street Berkeley Vale NSW 2261 PO Box ... installation of the selected HIGHBAND 25 system to certification standards, enabling the f...

Ngày tải lên: 18/10/2013, 14:15

2 394 0
Case Study - PBE - NMIT

Case Study - PBE - NMIT

... needs." About NMIT NMIT is a multi-campus, multi-discipline TAFE, which delivers diverse training programs to young and mature-aged students. Over 300 full-time, part-time and short courses are offered ... it chose to standardise on KRONE's Patch-by-Exception (PBE) solution across its seven campuses. " We pride ourself on delivering cutting-edge information technology resources...

Ngày tải lên: 18/10/2013, 14:15

2 335 0
Case Study - PBE - Pitney Bowes

Case Study - PBE - Pitney Bowes

... Disconnection Module and Patch-by-Exception methodology," said Mr Low. " Stowe Australia, will be installing the system for us," he added. Patch-by-Exception (PBE) is not new. KRONE Australia ... manager needs to use is a short, one-metre-long patch cable. In a simple plug-and-play motion they can override the hardwired side of the HIGHBAND  module and re-connect to the requir...

Ngày tải lên: 22/10/2013, 12:15

2 281 0
Case Study - PBE - Southern Cross

Case Study - PBE - Southern Cross

... that SCC (Vic) investigated various options such as pair-managed and RJ45 solutions from KRONE and other suppliers, and Patch-by-Exception (PBE) solutions exclusive to KRONE. “We conducted extensive ... that an RJ45 cross- connect solution could become messy and unmanageable. A PBE solution, such as the HIGHBAND 25, on the other hand, eliminates the number of patch cords needed - thus r...

Ngày tải lên: 22/10/2013, 12:15

2 336 0
Case study - PBE - Utah University

Case study - PBE - Utah University

... Toll Free: 1-8 0 0-3 6 6-3 891 • Outside of North America: + 1-9 5 2-9 3 8-8 080 Fax: + 1-9 5 2-9 1 7-3 237 • For a listing of ADC’s global sales office locations, please refer to our web site. CASE STUDY ... best end-to-end cabling solution for all of our criteria. The new Engineering Building was our very first all -TrueNet application. We’ve since decided to convert...

Ngày tải lên: 22/10/2013, 12:15

4 247 0
Case Study - PBE - Telco - Reliance Infocomm

Case Study - PBE - Telco - Reliance Infocomm

... CASE study KRONE (Australia) Holdings Pty Limited 2 Hereford Street Berkeley Vale NSW 2261 PO Box ... equipment contract for this NOC, which officials claim is the biggest in the world, is said to have CASE study KRONE (Australia) Holdings Pty Limited 2 Hereford Street Berkeley Vale NSW 2261 PO Box ... standard modem. Broadband is always ‘on’ - you don’t need to dial up every time...

Ngày tải lên: 26/10/2013, 19:15

2 260 0
w