TrueNet® Certified Cabling System Product and System PERFORMANCE WARRANTY
Ngày tải lên: 16/10/2013, 13:15
Ngày tải lên: 24/01/2014, 11:20
... trained, certified installers such as the authorized ADC Cabling System Certifiers who are authorized to provide an ADC product and performance warranty. Intermediate Cross-Connects Telecommunications Room Main ... to these standards benefits everyone. ADC’s Position on Standards ADC is a strong proponent of standards-based design for structured cabling systems. A strictly de...
Ngày tải lên: 21/12/2013, 14:15
EMBEDDED LINUX SYSTEM DESIGN AND DEVELOPMENT.pdf
... and Microsoft are registered trademarks and MS-DOS and DirectX .are trademarks of Microsoft Corporation. Ⅲ Solaris and Java are registered trademarks and ChorusOS is a trademark of Sun Microsystems, ... Neelakandan.p. cm.Includes bibliographical references and index.ISBN 0-8493-4058-6 (alk. paper)1. Linux. 2. Operating systems (Computers) 3. Embedded computer systems. I. Lad, Amol...
Ngày tải lên: 04/08/2012, 14:23
A Study of Channel Estimation for OFDM Systems and System Capacity for MIMO-OFDM Systems
... describes the basic OFDM system model and MIMO system model. The wireless channel model, the principles of OFDM and MIMO systems, the combination of MIMO and OFDM, that is, MIMO-OFDM system is also introduced ... Telecommunications System (UMTS), and CDMA2000. LTE also adopts OFDM and MIMO technologies in the physical layer. It uses a 2 by 2 MIMO system as the basic config...
Ngày tải lên: 20/11/2012, 11:28
Xây dựng hệ thống thông tin quản lý công văn tại Trung tâm Hệ thống Thông tin Viễn thông - Chính phủ FPT Information System Telecom and Government FIS TEG
... công văn tại Trung tâm Hệ Thống Thông Tin Viễn thông_Chính phủ FPT Information System Telecom and Goverment FIS TEG” được thực hiện, giúp hoàn thiện thêm cho phần mềm đã có.Ngoài các ... học TP HCM trao giải.2.Trung tâm hệ thống thông tin Viễn Thông Chính phủ FPT Information System Telecom and Government FIS TEGTrung tâm hệ thống thông tin (HTTT) Viễn thông _Chính phủ FIS TEG ... Linh...
Ngày tải lên: 15/12/2012, 11:21
System Startup and Shutdown
... Saigon CTT System Startup and Shutdown The Saigon CTT Objectives Objectives Define and explain bootstrap procedure Explain single and multi-user run levels Identify and configure system ... control to this system The Saigon CTT Standard Boot Process (LILO) Standard Boot Process (LILO) The Linux system initializes physical devices, virtual memory controller, and i...
Ngày tải lên: 24/06/2013, 01:25
Optimal cost and allocation for UPFC using HRGAPSO to improve power system security and loadability
... of a UPFC in a power system, with minimum transmission losses and cost of generation. The system loadability and index security are applied as a measure of power system performance. For solving ... Gi P and Gi Q : generator real and reactive power at i-th bus, respectively; Di P and Di Q : load real and reactive power at i-th bus, respectively; ij G and ij B : transfer con...
Ngày tải lên: 05/09/2013, 15:28
System Processes and Memory Management
... reboot the system. Processes and PIDs Use the ps command to list the processes currently running on the system. The output of this command will display the PID number and the command associated ... processes on your system using the ps command Find a process using the pgrep command Control processes using the jobs command Terminate unwanted processes using the kill and pkill c...
Ngày tải lên: 02/10/2013, 09:20