... 3.9,including a description of the purpose of each item, the specification of the item and the period that the item is needed for the project.In Table 3.9 the ‘No.’ column represents the number of equipment ... staff. The ‘Start date’ and ‘End date’ columns identifyhow long the role will exist for. In the instance of the project manager, the start date willbe during the project initiation phase, and the ... identified, list the preventive actions required to reduce the likelihood of the risk occurring, as well as the contingent actions needed to reduce the impact to the project should the risk occur....