Building the development strategy for the power engineering consulting joint stock company number 4 in the period from 2010 to 2015

Application of competency gap based training method at power engineering consulting joint stock company 3

Application of competency gap based training method at power engineering consulting joint stock company 3

... 2.2 .3 Comments on training of PECC3 29 CHAPTER 3: APPLICATION OF COMPTENCY GAP BASED TRAINING METHOD AT PECC3 35 3. 1 The establishment of application competency gap based training ... II: The situation of training at Power Engineering Consulting Joint Stock Company Chapter III: Application of competency gap based training meth...

Ngày tải lên: 25/11/2014, 00:36

98 945 0
Development strategy for petro capital and infrastructureinvestment joint stock company (petroland) in the period of 2011 - 2015

Development strategy for petro capital and infrastructureinvestment joint stock company (petroland) in the period of 2011 - 2015

... Per Capita in VietNam in the period of 200 0-2 010 Source:http://www.msb.com.vn/g-tin-tuc-su-kien/b-tai-chinh-ngan-hang/tong-quan-kinh-teviet-nam-nam-2010-va-trien-vong-nam -2 011/ Chart and Figures ... http://dddn.com.vn /20110 322043924849cat173/cho-thue-trung-tam-thuong-maimieng-banh-khong-de-xoi.htm; and http://vietbao.vn/Kinh-te/Cho-thue-trung-tam-thuong-mai-dathang/1093...

Ngày tải lên: 26/03/2015, 10:57

101 445 0
Strategy electrical equipment market penetration Vinasino electrical equipment joint stock company (VSEE) in the period from 2010 to 2015

Strategy electrical equipment market penetration Vinasino electrical equipment joint stock company (VSEE) in the period from 2010 to 2015

... activities of VSEE to implement the project; The content of "STRATEGY ELECTRICAL EQUIPMENT MARKET PENETRATION VINASINO ELECTRICAL EQUIPMENT JOINT STOCK COMPANY in the period from 2010 to 2015" project ... Website:http://www .vinasino. vn TABLE OF CONTENTS: STRATEGY ELECTRICAL EQUIPMENT MARKET PENETRATION VINASINO ELECTRICAL EQUIPMENT JOI...

Ngày tải lên: 26/03/2015, 10:58

95 1,4K 0
Building business strategy for power engineering consulting joint stock company 3 (Pecc3) 2014 - 2018

Building business strategy for power engineering consulting joint stock company 3 (Pecc3) 2014 - 2018

... Long-term debt 38 ,31 8,9 03, 464 7,596,548,6 53 10 ,37 6,506,2 23 EQUITY 62,746 ,33 1 ,33 8 83, 1 43, 697, 633 71,7 73, 728,9 93 59,067,469, 037 Equity 62,746 ,33 1 ,33 8 83, 027,402,691 71,7 73, 728,9 93 53, 875,844,109 ... in: - Office: 32 Ngo Thoi Nhiem street, Ward 7, District 3, HCMC - Tel : + 8 4-0 8 -3 9 30 7157 - Fax : + 8 4-0 8 -3 9 30 7 938 - Email : in...

Ngày tải lên: 26/03/2015, 10:59

110 878 1
w