Seamanship Techniques 2 Episode 12 doc
... it would become the first action in the above lists. 150 Seamanship Techniques DRYDOCK PROCEDURE Plates 20 and 21 illustrate a ship in drydock. Chief Officer’s Duties Preparation and precautions ... of liquefied CO 2 is 20 °C. Figure 7.6 CO 2 total flooding system for engine room. CO 2 release locker for engine room Locker door valve (operation alarm) Activation handle CO 2 sta...
Ngày tải lên: 13/08/2014, 16:21
Seamanship Techniques 2 Episode 4 doc
... Butterfly rig. Example tonnagesNumber of gangs 2 2 1 1 2 1 2 3 4 5 120 0 1300 600 600 1300 1 32 Seamanship Techniques S = 10 + 6 10 10 12 × S = 16 12 = 1 1 / 3 tonnes Stresses Involved in the ... + 2 5 10 2 × = 6 2 = 3.0 tonnes BS 6 = SWL 20 D 500 = 3.0 6 2 × 20 D 2 = 18 × 500 D = 18 500 20 2 × D = 450 = 21 .21 3 mm = 22 mm EXAMPLE 6 A...
Ngày tải lên: 13/08/2014, 16:21
Seamanship Techniques 2 Episode 2 doc
... shackle length 12. 5 4.7 6.7 6.7 9.4 9.4 13.5 0.105 50.0 70 100 100 140 140 20 0 1.445 60.0 98.8 141 141 198 198 28 2 2. 075 70 1 32 188 188 26 3 26 3 376 2. 85 90 20 9 29 8 29 8 417 417 596 4.705 122 357 510 ... strands. Fibres Strand Jaw Yarns Right-hand lay of rope 24 Seamanship Techniques TF F T S W W Starboard side 450 mm 300 mm 540 mm 1 48 th LD FWA V N LTF LF Assigne...
Ngày tải lên: 13/08/2014, 16:21
Hazardous Chemicals Handbook 2 Episode 12 doc
... gases 15 /29 Contact with water liberates toxic, extremely flammable gas 20 /21 Harmful by inhalation and in contact with skin 20 /21 /22 Harmful by inhalation, in contact with skin and if swallowed 20 /22 ... swallowed 21 /22 Harmful in contact with skin and if swallowed 23 /24 Toxic by inhalation and in contact with skin 23 /24 /25 Toxic by inhalation, in contact with skin, and if swa...
Ngày tải lên: 13/08/2014, 09:20
Seamanship Techniques 2 Episode 1 pptx
... conference Linen 22 222 222 222 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 4 2 4 4 4 22 222 222 2 2 222 STR Store 17The Ship Gusset Plate Triangular ... 4 Lift No .2 Lift No.3 STR Engine casing STR Bar STR Lift No. 5 Ramp Car deck vent Store Ca...
Ngày tải lên: 13/08/2014, 16:21
Seamanship Techniques 2 Episode 3 pot
... ropes (construction) 6 × 12 4 mm to 48 mm 15D 500 2 6 × 24 8 mm to 56 mm 20 D 500 2 6 × 37 8 mm to 56 mm 21 D 500 2 Stud link chain Grade 1 12. 5 mm to 120 mm 20 D 600 2 Grade 2 12. 5 mm to 120 mm 30D 600 2 Grade ... mm 2D 300 2 Synthetic fibre ropes Polypropylene 7 mm to 80 mm 3D 300 2 Polythene 4 mm to 72 mm Polyester (terylene) 4 mm to 96 mm 4D 300...
Ngày tải lên: 13/08/2014, 16:21
Seamanship Techniques 2 Episode 5 pps
... temperature) °F 74 72 70 68 66 64 62 60 58 123 4567891011 121 314151617 Figure 6 .24 Hold temperature and outside Dewpoint temperature graph. 180 Seamanship Techniques TOTALLY ENCLOSED SURVIVAL CRAFT These craft (Figure 7. 12) are invariably ... stowed position under the boat. 154 Seamanship Techniques 21 . Visiting transit shed ashore periodically to inspect stowage and corr...
Ngày tải lên: 13/08/2014, 16:21
Seamanship Techniques 2 Episode 6 pps
... the first 2 hour period of operation of the required 12 hour operation period. 9. A lamp or source of light shall be fitted inside the lifeboat to provide illumination for not less than 12 hours ... unfavourable conditions of trim of up to 10° and with the ship listed not less than 20 ° either way. 20 6 Seamanship Techniques Every life raft should be capable of withstanding exposu...
Ngày tải lên: 13/08/2014, 16:21
Seamanship Techniques 2 Episode 7 pot
... examples: EXAMPLES 1. Bearing 20 0° = A200 – signal made up as follows: ‘A’ Flag. 2 Numeral. ‘0’ Numeral. 2nd Substitute. 2. Longitude 22 ° 32 W = G 223 2W – Signal made up as follows: ‘G’ Flag. 2 Numeral. 1st ... 21 2°T, 15 miles from Morecambe Bay and require a vessel to stand by immediately. CC8 A2 12 MORECAMBE BAY R15. 2. My ETA at FOLKESTONE is 0700 BST on 14 December 1980. UR F...
Ngày tải lên: 13/08/2014, 16:21
Seamanship Techniques 2 Episode 8 ppsx
... lines 22 7 Fairleads 22 7 Bollard (bitts) 22 7 Rigging slip wires or ropes 22 8 Berthing 23 0 Clearing a berth 23 0 Entering dock 23 2 Securing to buoys 23 2 Mooring 23 3 Letting go from buoys 23 3 Turning ... 20 7 Abbreviations 20 9 9. SHIP-HANDLING Terms and general definitions 21 0 Factors in ship-handling 21 2 Rudders 21 3 Propellers 21 5 Turning circles 21 9 Bow/stern th...
Ngày tải lên: 13/08/2014, 16:21