... by ASTM Specifications) A216—WCB . . . 1,030 Carbon steel A217—C5 . . . 501 5% chromium steel A296—CA15 CA15 410 13% chromium steel A296—CB30 CB30 . . . 20% chromium steel A296—CC50 CC50 446 28% chromium ... . . . 0.10 . . . . . . . . . . . . 150 40 . . . . . . (32.1) (81) burner installations or legal equipped with preheating facilities 6 Oil for use in burners 150 . . . 2.00 f . . . . . ....
Ngày tải lên : 12/08/2014, 02:20
  • 80
  • 221
  • 0
Process Engineering Equipment Handbook 2009 Part 3 doc

Process Engineering Equipment Handbook 2009 Part 3 doc

... a CO 2 removal process based on physical absorption, like the Selexol process, is most suitable for this application. The Carbon Dioxide (CO 2 ); CO 2 Disposal C -15 FIG. C-14 Process scheme for ... also been estimated. The process configurations, CO conversion rates, CO 2 removal efficiencies and other process parameters are the same as in IEA studies. Almost all process steps are...
Ngày tải lên : 12/08/2014, 02:20
  • 80
  • 241
  • 0
Process Engineering Equipment Handbook 2009 Part 17 doc

Process Engineering Equipment Handbook 2009 Part 17 doc

... fabrication, parts shall be thoroughly cleaned by a detergent wash/clean water rinse process followed immediately by hot air drying. B. Surface Preparation 1. Following the wash/rinse and drying, the parts ... of storage tanks makes this equipment more vulnerable to lightning damage than any other type of industrial equipment. Today’s communication systems linking all field equipment v...
Ngày tải lên : 12/08/2014, 02:20
  • 80
  • 497
  • 0
Process Engineering Equipment Handbook 2009 Part 20 ppt

Process Engineering Equipment Handbook 2009 Part 20 ppt

... R-2 blending processes in, R-2, R-5 to R-6 catalytic cracking in, P-2 to P-3 chemical treating in, R-5 coking processes in, R-4 combining processes in, R-4 conversion process in, R-2 to R-4 cracking processes ... M-22 to M-24 errors in, M -15 to M-16 flow errors in, M -15 flow stream pressure in, M -15 gauge pressure in, M -15 Hickman butyl phthalate manometer, M-22 impact tubes and, M -1...
Ngày tải lên : 12/08/2014, 01:21
  • 24
  • 491
  • 0
Process Engineering Equipment Handbook 2009 Part 1 ppsx

Process Engineering Equipment Handbook 2009 Part 1 ppsx

... Data Soares, Claire. Process engineering equipment handbook / Claire Soares. p. cm. Includes index. ISBN 0-07-059614-X (acid-free paper) 1. Chemical plants Equipment and supplies. I. Title. TP157.S658 2002 660¢.283—dc21 ... 1985. In May 2001 she was appointed to Fellow grade by ASME. Process Engineering Equipment Handbook is her fourth book. The first, Process Plant Machiner...
Ngày tải lên : 12/08/2014, 02:20
  • 80
  • 423
  • 0
Process Engineering Equipment Handbook 2009 Part 2 pdf

Process Engineering Equipment Handbook 2009 Part 2 pdf

... Filsorption II process) is used for separation of submicron particles, heavy metals, and toxic hydrocarbons by a combination of filtering, “sorption,” and chemical reaction. The Wetpac ® process is ... (sodium chloride) is the main offender. In the cold parts of the engine it is the sodium chloride that does the damage, whereas in the hot parts of the engine it is sodium sulfate (or sulfidiz...
Ngày tải lên : 12/08/2014, 02:20
  • 80
  • 262
  • 0
Process Engineering Equipment Handbook 2009 Part 4 pdf

Process Engineering Equipment Handbook 2009 Part 4 pdf

... loaded parts, to optimize the aerodynamic characteristics, to influence the movement of the dynamic parts, to introduce improved materials and manufacturing techniques. Compressors C- 115 FIG. ... of a very small number of parts ᭿ Is made of solid metal without any plastic material ᭿ Avoids permanent mechanical friction ᭿ Avoids contamination or fouling of the process gas ᭿ Guarantees extre...
Ngày tải lên : 12/08/2014, 02:20
  • 80
  • 233
  • 0
Process Engineering Equipment Handbook 2009 Part 5 potx

Process Engineering Equipment Handbook 2009 Part 5 potx

... on the specific process requirements, such as higher overload capacity, a certain pressure rise to surge, maximum efficiency at design point or rather at a certain part load, the process design ... reduce the starting torque and for part- load operation. In cases where part- load occurs frequently and power is highly evaluated, inlet guide vanes achieve higher part- load efficiencies an...
Ngày tải lên : 12/08/2014, 02:20
  • 80
  • 236
  • 0
Process Engineering Equipment Handbook 2009 Part 6 pps

Process Engineering Equipment Handbook 2009 Part 6 pps

... very expensive retrofit engineering or reengineering, especially if major failures or production-loss events have occurred, without any warning provided by the existing system. Process engineers frequently ... forcing frequency and is not harmonically related to the lower forcing frequency. 15 FIG. C-313 Dual-direction probe use. 15 ᭿ Two systems in resonance at or near the same freque...
Ngày tải lên : 12/08/2014, 02:20
  • 80
  • 228
  • 0
Process Engineering Equipment Handbook 2009 Part 7 pdf

Process Engineering Equipment Handbook 2009 Part 7 pdf

... 89-GT-71. 10. Balancing of Jet Engines, Schenk Treble, A1511. 11. Soares, C. M., “Vibration Analysis: Separating the Elements of Machinery, Process and Personnel,” TMC, 1992. 12. Soares, C. M., ... Buscarello, R., vibration course notes, 1980. 19. Handbook on vibration, McGraw-Hill, New York. 20. Bloch, H., and Soares, C. M., Turboexpanders and Process Application, Gulf Professional Pub...