Process Engineering Equipment Handbook Episode 3 Part 11 ppsx
... C -33 6 open loop, in magnetic bearings, B-10 overload/overspeed protection in, C -33 6, C -34 3 to C -35 0, C -36 8 to C -37 4 power limitation in, C -33 3, C -35 0 to C -35 4 pressure control in, C -33 3, C -36 8 ... to C -37 4, C -38 3 to C -38 8 process control in, C -33 3 to C -33 4 proportional conversion of electrical control signals, A-40 retrofit controls in, C -35 4 to C-408 safet...
Ngày tải lên: 21/07/2014, 16:21
... L kD EI LLLLL LL kD EI LL LL v v 4 43 4 1 2 3 3 2 2 1 2 21 31 1 2 31 2 21 2 1 248 4 12 3 = - Ê Ë ˆ ¯ +-+ () + () {} -+ - () () {} K LL kD EI LL LL kD EI LL LL v v 3 32 1 2 22 2 31 1 2 31 2 21 2 4 12 3 = -+ - () -+ ... 12≤ A Face-to-face 17≤ 20≤ 24≤ 26≤ 30 ≤ 34 ≤ 38 ≤ B Approximate overall height 36 ≤ 38 ≤ 47≤ 49 1 / 2 ≤ 52 1 / 2 ≤ 60≤ 63 C Body length, seam-to-seam 2...
Ngày tải lên: 21/07/2014, 16:21
... 15 .3 1.2 8.6 0. 83 0.08 14 .3 0.90 1.6 0.01 1.5 0.01 0.9 0.00 0.00 1.4 0.01 0.6 0.06 0.5 0.02 0 .3 0.02 0.09 0.5 0. 03 13. 3 1.8 12.7 0.94 10 .3 0.06 0.84 12.9 0.66 36 .1 7.6 36 .6 7.2 20.5 1.7 1 .3 34 .3 ... 99.9 00000 00000 00000 00000 00000 7.2 11. 5 13. 3 7.1 71.9 8.8 9.0 12.5 7.9 74 .3 Existing 6.7 + Expanded 2.1 Existing 6.9 + Expanded 2.1 New New Existing 49.7 + Expanded 4...
Ngày tải lên: 21/07/2014, 16:21
Process Engineering Equipment Handbook Episode 3 Part 10 pot
... published B16 (B16 .3, B16.5, B16.15 and B16 .34 ) and B31 (B31.1, B31 .3, B31.4, B31.5, B31.8 and B31.9) Interpretations A39, A90, A112, B1, B2, B15, B18, B20, B30, B36, B56, B 73, B94, CSD, MH14, N45.2, ... Sizes Order No. K08289 $32 .00 MH1.5M-19 93 Slip Sheets Order No. K1 039 3 $32 .00 MH1.8M-1996 Wood Pallets Order No. K 134 96 $35 .00 MH1.9-19 93 Export Pallets Order No. K 133...
Ngày tải lên: 21/07/2014, 16:21
Process Engineering Equipment Handbook Episode 3 Part 9 doc
... -28.0 -33 .3 Chorine -30 .1 -34 .5 Hydrogen chloride -121.0 -85.0 Hydrogen sulfide -75 .3 -59.6 Sulfur dioxide 14.0 -10.0 Methane -258.7 -161.5 Ethane -127.8 -88.8 Propane - 43. 7 -42.1 N-Butane 31 .1 ... M00108 $29.00 B18 .3. 3M-1986 (R19 93) Hexagon Socket Head Shoulder Screws Order No. M00109 $29.00 B18 .3. 4M-1986 (R19 93) Hexagon Socket Button Head Cap Screws Order No. M0 0110 $29.0...
Ngày tải lên: 21/07/2014, 16:21
Process Engineering Equipment Handbook Episode 3 Part 8 pptx
... turbocharger Turbochargers T-1 13 TABLE T-8 Application Matrix* OEM Steam Flow, Operating Minimum † Model No. lb·h Pressure, psig Vessel Diameter SD-2-1.5 20,000 150 36 SD-2 -3 20,000 30 0 36 SD-2-6 20,000 600 36 SD-2-10 ... 1 / 8 in (3 mm). Order number 630 -0418. 1 each 3 / 4 in (19 mm) solid probe. Order number 630 -0208. DUAL TEST SYSTEM—processes 2 samples simultaneously* 1...
Ngày tải lên: 21/07/2014, 16:21
Process Engineering Equipment Handbook Episode 3 Part 7 pot
... only a few hours per year. Washing equipment and procedure System engineering and equipment. The following two basic principles have been determined for the engineering of both online and offline ... facilities The compact and lightweight construction eliminating the need for hoisting equipment Tanks T -33 FIG. T- 23 Radar level gauge with Planar antenna technology. (Source: Enra...
Ngày tải lên: 21/07/2014, 16:21
Process Engineering Equipment Handbook Episode 3 Part 4 docx
... and for boiler feed applications in power plants. See Figs. P -33 3 and P -33 4. General specifications Capacities to 15,000 gpm (34 00 m 3 /h) Heads to suit Speeds to 7200 rpm Temperatures to 800°F ... gpm (35 ,000 m 3 /h) solutions, slurries and process wastes. H to 30 ft (9 m) Evaporator and crystallizer, reactor T to 35 0°F (180°C) circulation, sewage sludge recirculation. P to 150...
Ngày tải lên: 21/07/2014, 16:21
Process Engineering Equipment Handbook Episode 3 Part 3 potx
... 130 38 .5 520 109 3, 200 425.4 32 13. 5 135 39 .6 540 112 3, 300 435 .3 33 13. 8 140 40.6 560 115 3, 400 445.2 34 14.1 145 41.8 580 118 3, 500 455.0 35 14.4 150 42.8 600 121 3, 600 464.7 36 14.7 155 43. 9 ... 36 4.1 26 11. 5 105 32 .8 460 99 .3 2,700 37 4.5 27 11. 8 110 33 .9 470 101 2,800 38 4.9 28 12.2 115 35 .0 480 1 03 2,900 39 5.1 29 12.5 120 36 .2 490 104...
Ngày tải lên: 21/07/2014, 16:21
Process Engineering Equipment Handbook Episode 3 Part 2 ppt
... Boiler Steam demand Saturated process steam bar 3 5 12 Mass flow t/h 24.6 206.7 76.5 Sootblow steam bar 35 Mass flow t/h 11. 7 Steam production Tomlinson boiler Bark boiler Mass flow t/h 31 9.5 56 Pressure bar ... condensate pumps FIG. P-1 73 Vorecon type RWE 5 F3 driving a compressor in a Swedish refinery. Input speed n e = 2980 rpm; power requirement P a = 1 530 kW; output speed n a =...