Process Engineering Equipment Handbook Episode 3 Part 11 ppsx

Process Engineering Equipment Handbook Episode 3 Part 11 ppsx

Process Engineering Equipment Handbook Episode 3 Part 11 ppsx

... C -33 6 open loop, in magnetic bearings, B-10 overload/overspeed protection in, C -33 6, C -34 3 to C -35 0, C -36 8 to C -37 4 power limitation in, C -33 3, C -35 0 to C -35 4 pressure control in, C -33 3, C -36 8 ... to C -37 4, C -38 3 to C -38 8 process control in, C -33 3 to C -33 4 proportional conversion of electrical control signals, A-40 retrofit controls in, C -35 4 to C-408 safet...

Ngày tải lên: 21/07/2014, 16:21

44 597 0
Process Engineering Equipment Handbook Episode 3 Part 6 ppsx

Process Engineering Equipment Handbook Episode 3 Part 6 ppsx

... L kD EI LLLLL LL kD EI LL LL v v 4 43 4 1 2 3 3 2 2 1 2 21 31 1 2 31 2 21 2 1 248 4 12 3 = - Ê Ë ˆ ¯ +-+ () + () {} -+ - () () {} K LL kD EI LL LL kD EI LL LL v v 3 32 1 2 22 2 31 1 2 31 2 21 2 4 12 3 = -+ - () -+ ... 12≤ A Face-to-face 17≤ 20≤ 24≤ 26≤ 30 ≤ 34 ≤ 38 ≤ B Approximate overall height 36 ≤ 38 ≤ 47≤ 49 1 / 2 ≤ 52 1 / 2 ≤ 60≤ 63 C Body length, seam-to-seam 2...

Ngày tải lên: 21/07/2014, 16:21

50 409 0
Process Engineering Equipment Handbook Episode 3 Part 5 ppsx

Process Engineering Equipment Handbook Episode 3 Part 5 ppsx

... 15 .3 1.2 8.6 0. 83 0.08 14 .3 0.90 1.6 0.01 1.5 0.01 0.9 0.00 0.00 1.4 0.01 0.6 0.06 0.5 0.02 0 .3 0.02 0.09 0.5 0. 03 13. 3 1.8 12.7 0.94 10 .3 0.06 0.84 12.9 0.66 36 .1 7.6 36 .6 7.2 20.5 1.7 1 .3 34 .3 ... 99.9 00000 00000 00000 00000 00000 7.2 11. 5 13. 3 7.1 71.9 8.8 9.0 12.5 7.9 74 .3 Existing 6.7 + Expanded 2.1 Existing 6.9 + Expanded 2.1 New New Existing 49.7 + Expanded 4...

Ngày tải lên: 21/07/2014, 16:21

50 417 0
Process Engineering Equipment Handbook Episode 3 Part 10 pot

Process Engineering Equipment Handbook Episode 3 Part 10 pot

... published B16 (B16 .3, B16.5, B16.15 and B16 .34 ) and B31 (B31.1, B31 .3, B31.4, B31.5, B31.8 and B31.9) Interpretations ᭿ A39, A90, A112, B1, B2, B15, B18, B20, B30, B36, B56, B 73, B94, CSD, MH14, N45.2, ... Sizes Order No. K08289 $32 .00 MH1.5M-19 93 Slip Sheets Order No. K1 039 3 $32 .00 MH1.8M-1996 Wood Pallets Order No. K 134 96 $35 .00 MH1.9-19 93 Export Pallets Order No. K 133...

Ngày tải lên: 21/07/2014, 16:21

50 652 0
Process Engineering Equipment Handbook Episode 3 Part 9 doc

Process Engineering Equipment Handbook Episode 3 Part 9 doc

... -28.0 -33 .3 Chorine -30 .1 -34 .5 Hydrogen chloride -121.0 -85.0 Hydrogen sulfide -75 .3 -59.6 Sulfur dioxide 14.0 -10.0 Methane -258.7 -161.5 Ethane -127.8 -88.8 Propane - 43. 7 -42.1 N-Butane 31 .1 ... M00108 $29.00 B18 .3. 3M-1986 (R19 93) Hexagon Socket Head Shoulder Screws Order No. M00109 $29.00 B18 .3. 4M-1986 (R19 93) Hexagon Socket Button Head Cap Screws Order No. M0 0110 $29.0...

Ngày tải lên: 21/07/2014, 16:21

50 459 0
Process Engineering Equipment Handbook Episode 3 Part 8 pptx

Process Engineering Equipment Handbook Episode 3 Part 8 pptx

... turbocharger Turbochargers T-1 13 TABLE T-8 Application Matrix* OEM Steam Flow, Operating Minimum † Model No. lb·h Pressure, psig Vessel Diameter SD-2-1.5 20,000 150 36 SD-2 -3 20,000 30 0 36 SD-2-6 20,000 600 36 SD-2-10 ... 1 / 8 in (3 mm). Order number 630 -0418. 1 each 3 / 4 in (19 mm) solid probe. Order number 630 -0208. DUAL TEST SYSTEM—processes 2 samples simultaneously* 1...

Ngày tải lên: 21/07/2014, 16:21

50 340 0
Process Engineering Equipment Handbook Episode 3 Part 7 pot

Process Engineering Equipment Handbook Episode 3 Part 7 pot

... only a few hours per year. Washing equipment and procedure System engineering and equipment. The following two basic principles have been determined for the engineering of both online and offline ... facilities ᭿ The compact and lightweight construction eliminating the need for hoisting equipment Tanks T -33 FIG. T- 23 Radar level gauge with Planar antenna technology. (Source: Enra...

Ngày tải lên: 21/07/2014, 16:21

50 351 0
Process Engineering Equipment Handbook Episode 3 Part 4 docx

Process Engineering Equipment Handbook Episode 3 Part 4 docx

... and for boiler feed applications in power plants. See Figs. P -33 3 and P -33 4. General specifications Capacities to 15,000 gpm (34 00 m 3 /h) Heads to suit Speeds to 7200 rpm Temperatures to 800°F ... gpm (35 ,000 m 3 /h) solutions, slurries and process wastes. H to 30 ft (9 m) Evaporator and crystallizer, reactor T to 35 0°F (180°C) circulation, sewage sludge recirculation. P to 150...

Ngày tải lên: 21/07/2014, 16:21

50 340 0
Process Engineering Equipment Handbook Episode 3 Part 3 potx

Process Engineering Equipment Handbook Episode 3 Part 3 potx

... 130 38 .5 520 109 3, 200 425.4 32 13. 5 135 39 .6 540 112 3, 300 435 .3 33 13. 8 140 40.6 560 115 3, 400 445.2 34 14.1 145 41.8 580 118 3, 500 455.0 35 14.4 150 42.8 600 121 3, 600 464.7 36 14.7 155 43. 9 ... 36 4.1 26 11. 5 105 32 .8 460 99 .3 2,700 37 4.5 27 11. 8 110 33 .9 470 101 2,800 38 4.9 28 12.2 115 35 .0 480 1 03 2,900 39 5.1 29 12.5 120 36 .2 490 104...

Ngày tải lên: 21/07/2014, 16:21

50 364 0
Process Engineering Equipment Handbook Episode 3 Part 2 ppt

Process Engineering Equipment Handbook Episode 3 Part 2 ppt

... Boiler Steam demand Saturated process steam bar 3 5 12 Mass flow t/h 24.6 206.7 76.5 Sootblow steam bar 35 Mass flow t/h 11. 7 Steam production Tomlinson boiler Bark boiler Mass flow t/h 31 9.5 56 Pressure bar ... condensate pumps FIG. P-1 73 Vorecon type RWE 5 F3 driving a compressor in a Swedish refinery. Input speed n e = 2980 rpm; power requirement P a = 1 530 kW; output speed n a =...

Ngày tải lên: 21/07/2014, 16:22

50 367 0
w