... HANOIEXPERIENCE OF THE INSTITUTE OF ENERGY IN THE PREPARATION OF THE RENEWABLE MASTER PLANPresented by: Nguyen Duc CuongInstitute of EnergyHanoi, 3/2008Institute of EnergyContents of Presentation1. ... No.110/2007/QD-TTg, it plans to install the grid connected RE with 4051 MW¾ Decision No.1855/QD-TTg, it sets up the target with share of RE (3 %-2 010; 5%2020) 9 MoIT has commissioned the preparation of ... Lack of information, analysis, and assessment on potential REresources, cost, and benefits of environment6. Lack of manpowerInstitute of EnergyTHANK YOU FOR YOUR ATTENTION!Institute of EnergyRURAL...