... INSPECTION- CLAIM- The buyer, at their cost, shall have the goods be inspected by an authorized organization at the destinationport; the inspection result of the organization at destination port is ... date stated as the contract date oreffective date. This date is not necessarily the date when the contract was signed butrather the date from which all the contractual rights and obligations ... on the parties as of the date the Seller signs it, provided that the Seller does not alter, delete, or add to the terms of the contract and provided that the Seller signs the contract by [date],transmit...