... stage should be 4 + 50% of 6 = 7. However, this presupposes that the first activity has not been delayed and finished on week 4 as programmed. 151060 5 64 4 Project Planning and Control How, then, ... programs were, therefore, limited by the storage and processing capacity of the computer as well as the input and output facilities. Project Planning and Control In pr...
Ngày tải lên : 26/01/2014, 11:20
  • 38
  • 549
  • 0
Tài liệu Project Planning and Control Part 1 pptx

Tài liệu Project Planning and Control Part 1 pptx

... 0. 743 0.718 0.6 94 0.672 0.650 0. 640 0.630 0.610 0.592 0. 549 0.510 0 .47 6 0 .44 4 3 0.971 0. 942 0.889 0. 840 0.7 94 0.751 0.712 0.675 0.658 0. 641 0.609 0.579 0.551 0.5 24 0.512 0.500 0 .47 7 0 .45 5 0 .40 6 ... 0.9 14 0.837 0.703 0.592 0.500 0 .42 4 0.361 0.308 0.2 84 0.263 0.225 0.1 94 0.167 0. 144 0.1 34 0.125 0.108 0.0 94 0.067 0. 048 0.035 0.026 10 0.905 0.820 0.676 0.558 0...
Ngày tải lên : 26/01/2014, 11:20
  • 63
  • 443
  • 1
Tài liệu Project Planning and Control Part 2 pptx

Tài liệu Project Planning and Control Part 2 pptx

... distribution and amendment record 3 Introduction 3.1 Project diary 3.2 Project history The Why 4 Project aims and objectives 4. 1 Business case The What 5 General description 5.1 Scope 5.2 Project ... following systems shown in Figure 11. 14 can be used. 71 Figure 11.13 Figure 11. 14 Project Planning and Control Random This method, as the name implies, follows no patt...
Ngày tải lên : 26/01/2014, 11:20
  • 39
  • 503
  • 0
Tài liệu Project Planning and Control Part 3 pptx

Tài liệu Project Planning and Control Part 3 pptx

... 36 16 8 14 14 13 19 27 11 20 12 17 21 19 23 30 30 24 Duration in days 28 29 43 27 32 36 34 51 33 38 36 53 35 42 56 36 45 60 45 32 Project Planning and Control 100 Figure 14. 5 illustrated by the example given in Figure 14. 5. For simplicity, ... Gg Ah EgEf Gh Aj 2 1 9 15 10 3 1 8 3 7 2 6 1 6 2 4 2 4 7 2 7 5 2 6 1 4 4 10 4 2 9 12 10 7 8 7 6 2 8 5 82 4 64 34 3...
Ngày tải lên : 26/01/2014, 11:20
  • 46
  • 464
  • 0
Tài liệu Project Planning and Control Part 5 ppt

Tài liệu Project Planning and Control Part 5 ppt

... days) A B C D E 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 2 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 7 5 3 3 3 4 4 4 4 4 4 4 4 5 5 5 5 5 5 4 4 4 4 5 5 5 56 6 6 6 6 76 3 2 A B C D E C D E F G K K L M M L L G J H B B A 5 56 67 A 020 Critical path Float 40 A1 A2 A3 A4 A5 A6 B1 B2 B3 B4 B5 B6 C1 C2 C3 C4 D1 D2 D3 D4 E1 E2 E3 E4 E5 F2 F3 G2 G3 G4 G5 H2 J1 J2 J3 J4...
Ngày tải lên : 26/01/2014, 11:20
  • 46
  • 508
  • 0
Tài liệu Project Planning and Control Part 6 docx

Tài liệu Project Planning and Control Part 6 docx

... 70 4. 9 250 6F 40 0 0.093 80 7 .4 600 Total 43 00 1.000 64. 4 4, 000 Overall % complete = 64. 4%. Predicted final hours 40 00 0. 644 = 6211 × 100 hours Efficiency = 43 00 × 0. 644 40 00 = 69.25% Cost control ... 4. 4 7.8 12.2 19 .4 30.7 50 316 542 780 1057 1589 190 335 525 835 1320 950 42 5 250 395 212 261 49 86 100 100 100 1 140 1 140 1 140 800 1000 1000 1000 50 80 100 58...
Ngày tải lên : 26/01/2014, 11:20
  • 45
  • 409
  • 0
Tài liệu Project Planning and Control Part 7 pptx

Tài liệu Project Planning and Control Part 7 pptx

... supports No 3 1 .44 4. 32 8. 64 38 4 58 4 1 1 6" Suction 2 butts bend * No 2 2 .41 4. 82 9. 64 34. 1 6 54. 1 6 1 1 6" Suction slip-on * No 1 1 .44 1 .44 2.88 34. 2 – 54. 2 – – – 4& quot; Disch. erect ... 70 4 7 100 6 7 100 6 Weld discharge pipe 1 40 4 – – – 4 100 4 4 100 4 Support discharge pipe 1 41 4 – – – 2 50 2 3 100 4 Basic plate pump 2 50 4 3 100 4...
Ngày tải lên : 26/01/2014, 11:20
  • 33
  • 475
  • 0
Tài liệu Project Planning and Control Part 8 pptx

Tài liệu Project Planning and Control Part 8 pptx

... 35 Total Cum. mday 6 6 6 12 6 18 6 24 6 30 6 36 6 42 6 48 9 57 9 66 12 78 12 90 7 97 5 102 4 106 4 110 4 1 14 6 120 6 126 6 132 4 136 4 140 4 144 4 148 2 150 2 152 3 155 3 158 3 161 3 1 64 3333333333 1 44 444 44 22 3333 222 2 2 2 2 2 2 2 2 2 222 2222 33333333 2 2 2 2 222 3 3 3 3 1 Bar ... 35 Total Cum. mday 6 6 6 12 6 18 6 24 6 30 6 36 6 42 6 48 5 53 5 58 8 66...
Ngày tải lên : 26/01/2014, 11:20
  • 50
  • 435
  • 0
Tài liệu Project Planning and Control 4E doc

Tài liệu Project Planning and Control 4E doc

... configuration management and quality management. 2 Hard skills such as project organization, project evaluation, project planning, cost control, monitoring, risk management and change management. Project Planning and ... were ‘Cast Column, 4 days’ and ‘Cast Beam, 2 days’ and it were necessary to insert ‘Strike Formwork, 2 days’ between the two activities, the planner F...
Ngày tải lên : 13/02/2014, 17:20
  • 406
  • 1.7K
  • 0
Project Planning and Control Part 9

Project Planning and Control Part 9

... Task Summary table 348 MS Project 98 349 Figure 31.10 Figure 31.11 Project Planning and Control which shows the status of the project can be obtained from View – Table – Summary and is shown in Figure ... (budget, planned, actual, value, anticipated final) 357 Project Planning and Control 340 Figure 31.1 Figure 31.2 Project Planning and Control Table 32.1 Co...
Ngày tải lên : 17/10/2013, 21:15
  • 24
  • 352
  • 0

Xem thêm