ugc minor research project final report

Final report ACKNOWLEDGEMENT

Final report ACKNOWLEDGEMENT

... efficiency will be absolutely accurate. 23 CHAPTER 4: RESEARCH METHODOLOGY 1.13 INFORMATION NEEDED In order to achieve the objectives of the research study as discussed in Chapter 1, and based on ... following information is needed for the research:  Attributes of a supermarket which construct the quality perception of customers. Source: previous research, focus group of customer, and management ... factor must be considered and an action plan with cost/benefit analysis should be conducted. This research model focuses mostly on benefit side (shopping preference of customers). 1.12.4 Critiques...

Ngày tải lên: 13/04/2013, 10:29

84 531 0
Final Report of the Customer Satisfaction Work Group

Final Report of the Customer Satisfaction Work Group

... developed a report at the mid-point of the process to document resources. It is also attached as Report 1.” 14 Three states volunteered to be included in the study. The states and the projects ... satisfaction practices; 2. A report from the Bureau of Labor Statistics (BLS) on the type of customer satisfaction activities it has undertaken; 3. A Project Work Plan” developed by the ... Innovation • Tom Gallagher, Manager, Research and Planning, Wyoming Department of Employment • Rod Fortran, New York Department of Labor, Division of Research and Statistics • Yolanda Harris,...

Ngày tải lên: 27/10/2013, 12:15

16 582 0
Tài liệu Final report "The Situation of Learning English for Electrical Engineering of D06k52 Students in Faculty of Foreign Language, Ha Noi University of Technology" docx

Tài liệu Final report "The Situation of Learning English for Electrical Engineering of D06k52 Students in Faculty of Foreign Language, Ha Noi University of Technology" docx

... exception. The objective of this report was to investigate the advantages and disadvantages of learning EEE as well as the main reason why they did not get good mark in the final test. Techniques of ... easier. And finally, some methods should be done to check student’s lesson correctness. 2 Le Thi Bich Ngoc D06K52 Faculty of Foreign Language Ha Noi University of Technology Introduction This report ... the final test. And it was very surprised that 62, 5 % students got C marks and found it difficult to cope with learning EEE. The result of this small survey is table 1 in the end of this report. ...

Ngày tải lên: 13/12/2013, 12:15

7 768 2
Tài liệu Final Report "Evaluation of time management skill of the 3rd year students in FFL - HUT" pptx

Tài liệu Final Report "Evaluation of time management skill of the 3rd year students in FFL - HUT" pptx

... after the researcher had read and analyzed existing material from already-selected sources to get necessary information which plays a role of literature review in the research. Then, the researcher ... step, the researcher focused on analyzing the requirements of ESP subjects from the course description written in ESP course books. All data were arranged systematically in the final report. Results 1. ... questionnaire. After collecting necessary information, the researcher analyzed and evaluated the result, plotted information in diagram and explained in the report. In the second method, content analysis,...

Ngày tải lên: 13/12/2013, 12:15

11 688 1
Tài liệu THE CHICAGO WOMEN’S HEALTH RISK STUDY RISK OF SERIOUS INJURY OR DEATH IN INTIMATE VIOLENCE A COLLABORATIVE RESEARCH PROJECT doc

Tài liệu THE CHICAGO WOMEN’S HEALTH RISK STUDY RISK OF SERIOUS INJURY OR DEATH IN INTIMATE VIOLENCE A COLLABORATIVE RESEARCH PROJECT doc

... data. Collaborators listed above; Project staff; Interviewers; Research site staff; State's Attorney's Office. IV. Analysis; dissemination (2 years, 1999-2001) Analyze and report on data. Collaborators ... being interviewed about the abuse, we trained everyone associated with the project to refer to it as the “Women’s Health Risk Project, ” and all project materials carried that title. One of the key standards ... "instrumentation effect".) Finally, the research benefitted; the high quality of the data was a direct result of our collaborative efforts. The extensive collaboration on survey instruments, based on shared research...

Ngày tải lên: 12/02/2014, 23:20

341 497 1
Tài liệu Particulate Air Pollution in Mexico City: A Col laborative Research Project doc

Tài liệu Particulate Air Pollution in Mexico City: A Col laborative Research Project doc

... Metropolitana; and (8) several other research groups from Mexican universities and other research institutes. This paper describes the goals and objectives of the project, preliminary data results from ... emitter to be differentiated from other emitters. The major and minor contributors will be identified, with the intent that further research and control efforts focus on the major contributors. Some ... particulate chemical composition. Though much understanding will be gained from this project, it will not provide the final solution to the complex pollution problem in Mexico City. The experience...

Ngày tải lên: 17/02/2014, 22:20

25 362 0
Assessment of Control Technology Options For Petroleum Refineries in the Mid-Atlantic Region Final Report potx

Assessment of Control Technology Options For Petroleum Refineries in the Mid-Atlantic Region Final Report potx

... Environmental Integrity Project, October 2002, “Accidents Will Happen: Pollution from Plant Malfunctions, Startups, and Shutdowns in Port Arthur, Texas”. Environmental Integrity Project, August 2004, ... Development of Emission Projections for 2009/2012/2018 NonEGU Point, Area, and Nonroad Sources in the MANE-VU Region. U.S. Environmental Protection Agency, 2005, Draft Final Version of the 2002 ... members of the Technical Oversight Committee (TOC) provided directions guiding the project, reviewed the drafts of this report and gave insightful comments including: Ravi Rangan, Delaware DNREC Bruce...

Ngày tải lên: 05/03/2014, 11:20

206 497 0
DREF final report Kenya: Floods pptx

DREF final report Kenya: Floods pptx

... Selected Parameters Reporting Timeframe 2011/12-2012/7 Budget Timeframe 2011/12-2012/7 Appeal MDRKE020 Budget APPROVED All figures are in Swiss Francs (CHF) Final Report Appeal Timeframe: ... of 2 Selected Parameters Reporting Timeframe 2011/12-2012/7 Budget Timeframe 2011/12-2012/7 Appeal MDRKE020 Budget APPROVED All figures are in Swiss Francs (CHF) Final Report Appeal Timeframe: ... crisis. The region reported the destruction of infrastructure including houses and roads. Crops and livestock were also reportedly washed away by the flash floods. Four deaths were reported in the...

Ngày tải lên: 05/03/2014, 17:20

11 521 0
THE FINANCIAL CRISIS INQUIRY REPORT - Final Report of the National Commission on the Causes of the Financial and Economic Crisis in the United States docx

THE FINANCIAL CRISIS INQUIRY REPORT - Final Report of the National Commission on the Causes of the Financial and Economic Crisis in the United States docx

... ∞ THE FINANCIAL CRISIS INQUIRY REPORT FINAL REPORT OF THE NATIONAL COMMISSION ON THE CAUSES OF THE FINANCIAL AND ECONOMIC CRISIS IN ... The report catalogues the rising incidence of mort- gage fraud, which ourished in an environment of collapsing lending standards and lax regulation. The number of suspicious activity reports—reports ... the Commission’s public hearings, testimony, and supporting research that can be stud- ied for years to come. Much of what is footnoted in this report can be found on the website. In addition, more...

Ngày tải lên: 06/03/2014, 09:22

663 611 1
Final Report: Compliant Thermo- Mechanical MEMS Actuators LDRD #52553 docx

Final Report: Compliant Thermo- Mechanical MEMS Actuators LDRD #52553 docx

... in collecting the Raman temperature data. SANDIA REPORT SAND2004-6635 Unlimited Release Printed December 2004 Final Report: Compliant Thermo- Mechanical MEMS Actuators LDRD ... Measurements have been made on Sandia large-grained polysilicon [17] up to 700 K, with the curve fit reported for this data as 014.0)100.1()100.9()102.2( 1 528311 +×−×+×− = −−− TTT k p Eq. 2-2 ... thank all of the staff in the MDL for fabrication and release/dry/coat support through out this project. We would also like to thank Ken Pohl, Mark Jenkins and David Luck for their assistance...

Ngày tải lên: 09/03/2014, 00:20

38 1,1K 0
Waste Forms Technology and Performance: Final Report pot

Waste Forms Technology and Performance: Final Report pot

... tirelessly to assemble the final report. Kevin’s advice and questions to the committee greatly improved the content of the report, and without Kevin’s extraordinary effort, the report could not have ... they were not asked to endorse the report s conclusions or recommendations, nor did they see the final draft of the report before its release. The review of this report was overseen by Edwin Przybylowicz, ... Performance: Final Report Prepublication Copy THE NATIONAL ACADEMIES PRESS 500 Fifth Street, N.W. Washington, DC 20001 NOTICE: The project that is the subject of this report was approved...

Ngày tải lên: 14/03/2014, 11:20

271 729 0
EU ENVIRONMENT DIRECTORATE: PHOSPHATES AND ALTERNATIVE DETERGENT BUILDERS – FINAL REPORT ppt

EU ENVIRONMENT DIRECTORATE: PHOSPHATES AND ALTERNATIVE DETERGENT BUILDERS – FINAL REPORT ppt

... have been reduced following more recent studies. PHOSPHATES AND ALTERNATIVE DETERGENT BUILDERS – FINAL REPORT Report No.: UC 4011 31 May 2002 Authors: E B Glennie, C Littlejohn, A Gendebien, A Hayes, ... concentrations are measured every 4 weeks at 17 sampling stations. The Commission reports on this information annually, and reports are available for 1998 and 1999. Because the collection of information ... No.: 12565-0 RESTRICTION: This report has the following limited distribution: External: EU Environment Directorate Internal: Authors Any enquiries relating to this report should be referred to...

Ngày tải lên: 15/03/2014, 16:20

186 362 0
w