... addressing SNAP risk factors (client case example)1 • Work priority to address SNAP risk factors1 • Confidence to address SNAP risk factors1 • Barriers and enablers to addressing SNAP risk factors in ... for three or more risk factors and/ or high intensity intervention (across risk factors), low intensity intervener = low frequency of intervention for three or more risk factors and/ or low intensity ... expectations and intentions Outside of professional role gatekeeper Informer/educator Helper/facilitator Risk factor management pr actices Scr eening Scope: Some risk factors > all risk factors Frequency:...
Ngày tải lên: 11/08/2014, 05:21
... dioxin and dibenzofuran congeners and coplanar PCBs Receptors evaluated were based on the potential exposure and risk to farmers (and their families) who apply biosolids to their land and consume ... for both adults and children at the 50th percentile, and ϫ 10Ϫ5 and ϫ 10Ϫ5 for adults and children, respectively, at the 95th percentile Most of the risk was attributable to beef and milk ingestion, ... P.H Krogh, K.K Brandt, J Sorensen, T Madsen, J Petersen, and C Gron 2003 Recycling of sewage sludge and household compost to arable land: Fate and effects of organic contaminants, and impact on...
Ngày tải lên: 14/02/2014, 03:20
EVENT SAFETY RISK ASSESSMENT AND EVENT MANAGEMENT PLAN pot
... is held on Council or public land, relevant permits and licences are obtained and that a risk assessment and Event Management Plan (attached below) is completed and forwarded to Council Please ... Extreme risk: immediate action required H = High risk: senior management attention needed M = Moderate risk: management responsibility must be specified L = Low risk: manage by routine procedures Risk ... Person affected/ Location Risk Rating (refer to risk matrix) Risk Control Measures By who and when? Notes EVENT SAFETY RISK ASSESSMENT (SMALL TO MEDIUM SIZED COMMUNITY EVENTS) RISK ASSESSMENT – IT’S...
Ngày tải lên: 30/03/2014, 16:20
Báo cáo hóa học: " EQ-5D visual analog scale and utility index values in individuals with diabetes and at risk for diabetes: Findings from the Study to Help Improve Early evaluation and management of risk factors Leading to Diabetes (SHIELD)" potx
... 0–2 risk factors were classified as low risk and those with 3–5 risk factors were grouped as high risk for a diagnosis of diabetes This paper will focus on respondents with type diabetes, low risk ... risk (0–2 risk factors), and high risk (3–5 risk factors) EQ-5D The EQ-5D was used as a measure of respondents' HRQoL and utility values The EQ-5D provides a simple descriptive profile and a single ... *p < 0.001, low risk versus T2D and low risk versus high risk **p < 0.001, high risk versus T2D EQ-5D = EuroQoL- Dimensions; T2D = type diabetes diabetes (61.1%) and at high risk (61.8%) reported...
Ngày tải lên: 18/06/2014, 22:20
báo cáo hóa học:" Risk factor analysis for early femoral failure in metal-on-metal hip resurfacing arthroplasty: the effect of bone density and body mass index" potx
... significant risk factors were regrouped with different thresholds Mosaic plots were depicted and Chi-square analyses were performed to evaluate the thresholds of each risk factor and thecombined factors ... association between various patient and implant characteristics and an increased rate of failure, few have specifically quantified independent risk factors Furthermore, risk factors have been most commonly ... T-score (≤ -1.5) [risk rate = 7.9%, relative risk = 6.3 times higher] or a high BMI (≥29) [risk rate = 2.9%, relative risk = 7.3 times higher] should be considered at higher risks for the complication...
Ngày tải lên: 20/06/2014, 07:20
Risk and management Accounting Best Practices_3 doc
... thoroughly documented and understandable, and that they are still needed There should also be a step that specifically requires the budget manager to review the need for extra line items and formulas, ... criterion is risk Many companies have decided that they are not in the business of making investments and so they avoid all risk, even ch06_4773.qxd 12/29/06 142 9:14 AM Page 142 Cash Management ... be done once and then dropped On the contrary, the standard budget procedure should begin with a review of the model from the previous year to ensure that all budget line items and calculations...
Ngày tải lên: 21/06/2014, 18:20
Risk and management Accounting Best Practices_5 docx
... rate and salesperson to be assigned to each invoice However, many companies have highly varied and detailed commission systems, where the commission rates vary based on a variety of factors and ... of grandfathering the existing staff and only apply the new agreement to new sales employees In short, delaying the final commission payment runs the risk of mixing up payments between old and ... approval than the controller’s, and they have a short implementation duration and are quite inexpensive to install and operate The main exceptions are target costing and activity-based costing, which...
Ngày tải lên: 21/06/2014, 18:20
Risk and management Accounting Best Practices_6 pot
... can handle large transaction volumes, and will handle unusual transactions If a new system successfully passes all of these tests, then it can be put into service If not, it must be fixed and tested ... signed, and then detach them from the checks and file them away again All of this movement of paper also raises the risk that documents will be misfiled during the process of taking them out of files and ... becomes part of the accounting function, and so a limited set of best practices are included here They are primarily oriented toward treasury, risk management, and investor relations applications...
Ngày tải lên: 21/06/2014, 18:20
Risk and management Accounting Best Practices_7 ppt
... www.riskgrades.com This on-line service grades the risk of any equity that the user enters into the system, reviewing its equity, interest rate, currency, and commodity risk This results in a “RiskGrade” ... part of the finance staff’s workday and is highly subject to error These tasks involve management of a company’s cash position, investment and debt portfolio, and risk analysis The normal approach ... short-term and fixed-income investments, equities, and options • Risk analysis It allows an employee to use it as a giant calculator, performing what-if analyses with yield-curve manipulation and scenario...
Ngày tải lên: 21/06/2014, 18:20
Risk and management Accounting Best Practices_10 docx
... approach, the internal auditor will be seen as a strong advisor to new managers, and one with whom a long-standing and friendly relationship can ch15_4773.qxd 12/29/06 358 9:30 AM Page 358 Internal ... company will find that there is much better buy-in to, and understanding of, the work being done, which may both increase employee efficiency and reduce longterm turnover in the internal audit staff ... control standards manual, making a point of highlighting key changes to it Only by this constant emphasis on the importance of the manual will managers take the time to review and understand it...
Ngày tải lên: 21/06/2014, 18:20
Risk and management Accounting Best Practices_11 docx
... company investment in inventory, the materials management staff tends to throw up its hands in dismay and tackle the directive for all the thousands of items in stock The result is a pitiful ... facility This information should be reported to management and posted for the warehouse staff to see By showing this information to the warehouse staff and tying a series of bonus payments to it, ... transactions and by continually training both the warehouse and accounting staffs in their use Examples of common inventory transactions are as follows: • Back-flushing • Consignment receipts and deliveries...
Ngày tải lên: 21/06/2014, 18:20
Risk and management Accounting Best Practices_13 doc
... Collection, 168–169 Consolidation and reporting, 347–348 Incentive compensation management, 195–196 Interfaces to general ledger, 346 Spend management systems, 70–71 Standard container sizes, 381 Stock ... if normal collection techniques prove ineffective • Senior management shall collectively review and adjust the corporation’s product and services pricing policy at least annually • The collections ... recorded in the warehouse management system database within _ minutes of their occurrence • The management team shall regularly review the company’s products, product options, and supporting parts...
Ngày tải lên: 21/06/2014, 18:20
Risk Assessment and Risk Management, II doc
... simple and is less demanding of time and resources • Stochastic modeling is more realistic and quantifies uncertainty • Monte Carlo simulation is a standard stochastic modeling algorithm Standardized ... Deterministic risk models are an easier task in risk communication 25 26 Principles of Environmental Toxicology Principles of Environmental Toxicology Assessment vs Management Risk Management • ... Decision criteria • Value-of-information analysis and further site characterization • Decision analysis and remedy selection – Risk manager—be protective – Risk assessor—be unbiased • Precaution required...
Ngày tải lên: 09/07/2014, 08:21
Risk Assessment and Risk Management, I pps
... Toxicology Risk Characterization Risk Characterization • Risk estimation Analysis – Exposure and toxicity assessment integration – Uncertainty analysis EPA Risk Characterization • Risk description Risk ... Analysis Risk Characterization Toxicity Database Risk Estimation • Exposure and toxicity assessment integration • Uncertainty analysis Dose-Response DoseAnalysis Risk Description • Risk summary ... description Risk Estimation • Exposure and toxicity assessment integration • Uncertainty analysis – Risk summary – Risk interpretation Risk Description • Risk summary • Interpretation of significance...
Ngày tải lên: 09/07/2014, 08:21
báo cáo khoa học: " A systematic review of the effectiveness of interventions to improve post-fracture investigation and management of patients at risk of osteoporosis" docx
... fracture; and the adverse effects and high costs of medications Recent studies have shown that 70% to 90% of PCPs wish to be more informed about the management of osteoporosis [39,41,42], and with ... instrument reliability and validity, type of interventions, sample size, statistical power, primary and secondary study findings, statistical tests used, and associated statistical and clinical significance ... assessed the data extracted and conclusions drawn Assessment of risk of bias in included studies We used The Cochrane Collaboration’s tool for assessing risk of bias on six standard criteria: adequate...
Ngày tải lên: 10/08/2014, 10:23
Fundamentals of Risk Analysis and Risk Management - Section 1 ppsx
... fields of risk analysis and risk management, I asked my colleagues to help me write the chapters for which they were recognized experts in their particular practice of risk analysis and risk management ... III.6 Law and Risk Assessment in the United States Peter Barton Hutt Chapter III.7 Science, Regulation, and Toxic Risk Assessment Howard Latin IV RISK MANAGEMENT Chapter IV.1 Risk Management ... chapters and useful discussions and suggestions They brought to my attention broader implications of the topics in this book of real life and political functioning in which risk analysis and risk management...
Ngày tải lên: 11/08/2014, 12:21
Fundamentals of Risk Analysis and Risk Management - Section 2 pptx
... occupational, and residential * Adapted in part from Driver, J and C Wilkinson 1995 Pesticide and human health: Science, regulation, and public perception, In: Risk Assessment and Management Handbook ... requirements, test protocols, standards for interpretation, and methods of risk assessment and risk management (U.S EPA 1994a) Major efforts are underway with Canada and Mexico under the North American ... software, such as DietRisk (Driver and Milask 1995) and the U.S EPA’s Dietary Risk Evaluation System (DRES), which is currently being updated and revised, the 1977–1978 and 1987–1988 United States...
Ngày tải lên: 11/08/2014, 12:21
Fundamentals of Risk Analysis and Risk Management - Section 3 doc
... difference between risk analysis and risk assessment? What is the difference between risk analysis and risk management? What is the difference between comparative and other forms of risk analysis? ... and the Insurance of Catastrophic Risks” Journal of Risk and Insurance (Part I) 40:231–243 Stone, John (1973b) “A Theory of Capacity and the Insurance of Catastrophic Risks” Journal of Risk and ... by risk management considerations, although communication between risk managers and risk assessors is necessary (Deisler 1988) Some forms of risk assessment processes, such as for cancer risks...
Ngày tải lên: 11/08/2014, 12:21
Fundamentals of Risk Analysis and Risk Management - Section 4 potx
... Eds., Hazards and the Communication of Risk Gower, England, 1990a, 70 Handmer, J and Penning-Rowsell, E., Eds., Hazards and the Communication of Risk Gower, England, 1990b, 72 Handmer, J and Penning-Rowsell, ... Green, C Perceived risk: past, present and future conditional, in Hazards and the Communication of Risk Handmer, J and Penning-Rowsell, E., Eds., Gower, England, 1990, Chap Handmer, J and Penning-Rowsell, ... Hazards and the Communication of Risk Gower, England, 1990c, 73 Handmer, J and Penning-Rowsell, E., Eds., Hazards and the Communication of Risk Gower, England, 1990d, 313 Kreimer, A and Munasinghe,...
Ngày tải lên: 11/08/2014, 12:21