... power plant has two natures iR and iL Equipment such as motors, welders, and fluorescent lights require both types of currents However, equipment such as heaters and incandescent bulbs require the ... terminals a and b′, b and c′, and c and a′ are joined to form the delta connection In the wye connection (Fig 1.29a), the voltages across the individual phases are identified as Va′a, Vb′b, and Vc′c ... the material The thickness of the laminations is between 0.5 and mm in power equipment and between 0.01 and 0.5 mm in electronic equipment The volume of a material increases when it is laminated...
Ngày tải lên: 27/12/2013, 13:18
... 2007 Equipment Risk, Training and Maintenance Controls and processes should be monitored and reviewed Are the controls implemented effective? Once a year, as part of the workplace inspections, equipment ... Training and Maintenance 5.4 Required Training Based on the risk and task assessment determine the category of the equipment • • Category This is high risk or complex equipment and includes such instruments ... operational and safety knowledge and skill requirements of your staff and students for operation of the equipment • Determine the complexity of these tasks required for the operation of the equipment, ...
Ngày tải lên: 31/03/2014, 12:20
The Selection, Use and Maintenance of Personal Protective Equipment (PPE) potx
... Legislative requirements and lists of HSE approved standards and type of approved equipment Third Edition, ISBN 0-1188-6382-7 Guidance on the use of RPE can be found on the Health and Safety at ... of St Andrews PPE - IR Personal Protective Equipment (PPE) Inspection Record School / Unit Location (Room Number) Date of Inspection Equipment ID Number Condition of Equipment ... protect against dust particles and certain types and quantities of gases and vapours Half mask covering the nose, mouth and chin It is usually made of rubber or silicon and has replaceable filters...
Ngày tải lên: 08/03/2014, 13:20
Testing Costs and Testing Capacity According to the REACH Requirements – Results of a Survey of Independent and Corporate GLP Laboratories in the EU and Switzerland potx
... laboratories, the UK 128, France and Switzerland 44 each, the Netherlands 36, and Italy 29 These lists include independent labs and corporate labs, which all conduct their testing in compliance with ... representative and detailed survey on testing cost as required according to the REACH proposal is at hand Neither is there a survey on the available testing capacity in the EU The most recent study on testing ... factors (labour and materials), rate of output (i.e., utilization of fixed laboratory personnel and equipment) , quality of input factors, size of the testing lots, laboratory technology, and the organization...
Ngày tải lên: 23/03/2014, 05:22
Maintenance Inspection and Rating pdf
... optical crack gauge, paint film gauge, and first-aid kits Additional special inspection tools are survey, nondestructive testing, and underwater inspection equipment Inspection of a bridge prompts several ... Reports of Inspection Inspection reports are required to establish and maintain a bridge history file These reports are useful in identifying and assessing the repair requirements and maintenance ... drilling and probing And, two of the nondestructive tests are Pol-Tek and ultrasonic testing The Pol-Tek method is used to detect low-density regions and ultrasonic testing is used to measure crack and...
Ngày tải lên: 08/07/2014, 12:20
Probabilistic models for reliability assessment of ageing equipment and maintenance optimization
... catastrophic failures Too frequent inspection and maintenance would increase the cost of performing inspection and maintenance On the other hand, lesser inspection and maintenance would result in a ... established maintenance strategies in electrical utilities; scheduled maintenance and predictive maintenance [26] Since random failures cannot be avoided by performing inspection and maintenance ... after inspection and maintenance at I3 and M3) and deteriorates to the ith deterioration state Si prior to any other inspection, the inspection rate at Si,2 is γ2, because the operator conducts inspections...
Ngày tải lên: 08/09/2015, 19:22
Báo cáo y học: "Postoperative pain scores and analgesic requirements after thyroid surgery: Comparison of three intraoperative opioid regimens"
... vomiting and sedation score (0=awake, 1=mild, 2=sleepy but awakable, and = very sleepy) and the length of stay in the PACU The latter was decided by a physician unaware of the randomisation and based ... cancer, and out of for surgical hematoma and drainage All other patients completed the study Demographic characteristics and intraoperative anesthetics requirements are represented in Table and Table ... pain scores and the incidence and the amount of morphine requirements were not different between groups No patient had heavy sedation in either of the groups The incidence of nausea and vomiting...
Ngày tải lên: 02/11/2012, 10:14
Tài liệu Cabling Standard - TIA 607 - Commercial Building Grounding and Bonding Requirements for Telecommu doc
... facility TELECOMMUNICATIONS ROOM and EQUIPMENT ROOM The TGB shall: • • • • be located in each telecommunications room and equipment room be insulated from its support and separated by a minimum of ... OVERVIEW OF THE TELECOMMUNICATIONS GROUNDING AND BONDING INFRASTRUCTURE The electrical service entrance is outside the scope of this Standard and is grounded and bonded in accordance with all applicable ... bonding and grounding for telecommunications shall be met The telecommunications grounding and bonding infrastructure begins with a connection to the service equipment (power) ground and extends...
Ngày tải lên: 10/12/2013, 02:15
Tài liệu Activity 3.1: Identifying Data-Related Use Cases and Data Requirements docx
... Use Cases and Data Requirements Exercise 1: Identifying Use Cases that Require Data In this exercise, you will identify data requirements from the provided use cases ! Determine data requirements ... Managers print invoices Final time and billing information Activity 3.1: Identifying Data-Related Use Cases and Data Requirements Exercise 2: Identifying Hidden Data Requirements In this exercise, ... determine future directions and courses of actions 10 Activity 3.1: Identifying Data-Related Use Cases and Data Requirements Exercise 3: Identifying Nonfunctional Requirements In this exercise,...
Ngày tải lên: 21/12/2013, 06:16
PLC startup and maintenance industrialtext WW
... Intelligence and PLC Systems 17: Fuzzy Logic 18: Local Area Networks 19: I/O Bus Networks 20: PLC Start-Up and Maintenance 21: TROUBLESHOOTING & MAINTENANCE The IEC-1131 Standard and Programming ... 1-800-752-8398 PLC Start-Up and Maintenance Contents PLC SYSTEM LAYOUT .4 PANEL ENCLOSURES AND SYSTEM COMPONENTS POWER REQUIREMENTS AND SAFETY CIRCUITRY 13 POWER REQUIREMENTS ... controller near the equipment and using remote I/O where possible will minimize wire runs and simplify start-up and maintenance Figure shows a programmable controller installation and its wiring connections...
Ngày tải lên: 01/01/2014, 21:20
Tài liệu Carrier-Class CATV Networks Maintaining Signal Connectivity During Configuration Changes and Maintenance docx
... Changes and Maintenance Reconfiguration with Minimal Signal Interruption Not all CATV maintenance is performed at the headend Some maintenance resides at the outside distribution plant (OSP) Fiber and ... for splitting and combining signals in headend networks Carrier-Class CATV Networks: Maintaining Signal Connectivity During Configuration Changes and Maintenance Channel Processor and Modular ... cabling within the rack lineup and allowing operators easy access to circuits, maintenance and rerouting procedures were greatly simplified—minimizing operational costs and ensuring system integrity...
Ngày tải lên: 17/01/2014, 11:20
Tài liệu Practical mod_perl-CHAPTER 5:Web Server Control, Monitoring, Upgrade, and Maintenance doc
... Thursday, November 18, 2004 12:36 PM PerlHandler Book::Handler to: SetHandler perl-script #PerlHandler Book::Handler PerlHandler Book: :Maintenance Now restart ... during the maintenance period Example 5-2 illustrates a maintenance handler Example 5-2 Book /Maintenance. pm package Book: :Maintenance; use strict; use Apache::Constants qw(:common); sub handler { ... may not be pressing, the handlers and scripts being used at a site may need regular tweaks and changes, and new ones may be added quite frequently Of course, the safest and best option is to prepare...
Ngày tải lên: 21/01/2014, 06:20
Tài liệu Total Energy Expenditure and Energy Requirements in Healthy Elderly Persons ppt
... - DhKh), (Eq 1) where D, and Dh are the individual, zero-time extrapolated dilution spaces of H2180 and 2H20 in moles, and K) and Kh are the turnover rates of Hz’s0 and ‘Hz0 in days-‘ Isotope ... over the previous year was averaged and expressed as kcal/d hlean values, SD, and ranges are presented for all measures and parameters Differences between men and women were assessed by an independent ... NOTE Enrichments of 2H,O and H, ‘80 on day and day IO after dosing are on the relative del per mil (%o) scale above predosing values Kh and K, are the turnover rates of 2H,0 and H,l*O from a Z-point...
Ngày tải lên: 14/02/2014, 07:20
Tài liệu Performance-Based Management Systems Effective Implementation and Maintenance docx
... L Garnett and Alexander Kouzmin 64 Public Budgeting and Finance: Fourth Edition, edited by Robert T Golembiewski and Jack Rabin 67 Handbook of Public Finance, edited by Fred Thompson and Mark ... Public Management Practice and Reform, edited by Kuotsai Tom Liou 93 Handbook of Crisis and Emergency Management, edited by Ali Farazmand 94 Handbook of Comparative and Development Public Administration: ... Administration, Alexander B Aikman 130 Handbook of Globalization, Governance, and Public Administration, edited by Ali Farazmand and Jack Pinkowski AU5427.indb 11/19/08 11:10:32 AM 131 Handbook of Globalization...
Ngày tải lên: 15/02/2014, 20:20
Tài liệu DIRECTORS’ VIEWS ON ACCOUNTING AND AUDITING REQUIREMENTS FOR SMES pptx
... companies on the accounting and auditing requirements and options for small and medium-sized entities (SMEs) Commissioned in August 2007 by the former Department of Trade and Industry (DTI), now ... findings and the study’s contribution to the evidence base 14 Directors’ Views on Accounting and Auditing Requirements for SMEs _ Accounting and auditing requirements ... entity had a registered office in England or Northern Ireland and a director’s name was provided; in addition, that it was active, private and independent, and had filed the 2006 accounts by the...
Ngày tải lên: 18/02/2014, 01:20
Tài liệu Grid Database Access and Integration: Requirements and Functionalities pptx
... management systems (DBMSs) and other stores of structured data To be effective, such standards must: Address recognized requirements Complement other standards within the GGF and beyond Have broad ... standards – its role is to help in the identification of areas in which standards are required, and for which the GGF (and in particular the DAIS Working Group) might provide an appropriate standardisation ... period, and reported fully in [Pearson 02] The exercise used interviewing and questionnaire techniques to gather requirements from grid application developers and end users Interviews were held and...
Ngày tải lên: 19/02/2014, 12:20
Tài liệu Medicare Claims Processing Manual Chapter 20 - Durable Medical Equipment, Prosthetics, Orthotics, and Supplies (DMEPOS) ppt
... on Modifiers 40 - Payment for Maintenance and Service for Non-ESRD Equipment 40.1 - General 40.2 - Maintenance and Service of Capped Rental Items 40.3 - Maintenance and Service of PEN Pumps 50 ... Payment may not be made for maintenance and servicing of rented equipment other than maintenance and servicing for PEN pumps (under the conditions of §40.3) or the maintenance and servicing fee established ... water lines The delivery and installation of renal dialysis equipment, unlike that involved when a hospital bed is delivered and set up, requires testing and assurance of equipment performance Therefore,...
Ngày tải lên: 21/02/2014, 09:20
Tài liệu Durable Medical Equipment, Prosthetics, Orthotics, and Supplies (DMEPOS) Quality Standards ppt
... information for rental equipment and options for beneficiaries and/ or caregiver(s) to rent or purchase equipment and/ or item(s), when applicable; and Provide information and telephone number(s) ... use of equipment and item(s) and minimizes safety risks, infections, and hazards both for its staff and for beneficiaries; ●● Implement and maintain a plan for identifying, monitoring, and reporting ... knowledgeable about the equipment beneficiary and/ or caregiver, supplier, and prescribing physician; ●● Provide all equipment and item(s) that are necessary to operate the equipment or item(s) and perform...
Ngày tải lên: 21/02/2014, 09:20
Tài liệu A structured approach to Enterprise Risk Management (ERM) and the requirements of ISO 31000 ppt
... or key dependencies G Inspections and audits Physical inspections of premises and activities and audits of compliance with established systems and procedures G Flowcharts and dependency analysis ... architecture of a large listed company Mandate and commitment from the Board is critically important and it needs to be continuous and high-profile Unless this mandate and commitment are forthcoming, ... monitoring and review of performance and communication and consultation Monitoring and review ensures that the organisation monitors risk performance and learns from experience Communication and consultation...
Ngày tải lên: 21/02/2014, 12:20