06 1 iok a1 GENERAL CONSTRUCTION PLAN

4 8 0

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Cấu trúc

  • GENERAL CONSTRUCTION PLAN

    • I. General Requirements

    • II. Construction organization plan

    • III. PLAN FOR CONSTRUCTION EQUIPMENT AND MACHINERY AND MANPOWER MOBILIZATION

    • 1. General

    • 2. Mobilization of manpower and equipments

Nội dung

CIVIL WORKS CONTRACT PACKAGE A1 (KM 65+000-KM81+150)- DA NANG – QUANG NGAI SECTION EXPRESSWAY CONSTRUCTION METHODS (Including construction method for Thruway, Drainage System, Service area, Frontage road and Miscellaneous Works) 1/ PHUONG THANH TRANCONSIN – GRBCC JV CIVIL WORKS CONTRACT PACKAGE A1 (KM 65+000-KM81+150)- DA NANG – QUANG NGAI SECTION GENERAL CONSTRUCTION PLAN I General Requirements Having studying the Bidding Documents issued, prevail regulation on quality control and construction supervision of construction works, our Bidder will propose the proper plan for construction and completion of Work of this Package in compliance with the conditions of contract II Construction organization plan The Bidder will arrange temporary road for construction Construction progress will be construction simultaneously over all section of line Construction arrangement For ensuring the construction progress schedule and construction quality required by the Employer and basing on the quantities of works to be completed and site conditions, the construction lines are proposed to arrange as follows:  Constructions Line 01: From Km65+000 to Km69+000  Constructions Line 02: From Km69+000 to Km73+000  Constructions Line 03: From Km73+000 to Km77+000  Constructions Line 04: From Km77+000 to Km81+150 The Works will be constructed and completed mainly by construction equipment and machinery in combination of use of common labor All construction lines shall be almost developed at the same time over the site upon receiving the commencement order from Employer A The Project Management Board shall be located at the site for overall management and direction of construction and completion of works of construction lines during construction period, that will mobilize construction units from this construction section to other, distribute and arrange properly the construction equipment, machinery, manpower so that they will be used effectively Primary construction method for road Sequences of construction for road construction lines:  Excavation  Construction embankment K95  Construction embankment K98  Construction of Sub-base, base aggregate course, asphalt treated base  Construction cement concrete pavement 2/ PHUONG THANH TRANCONSIN – GRBCC JV CIVIL WORKS CONTRACT PACKAGE A1 (KM 65+000-KM81+150)- DA NANG – QUANG NGAI SECTION  Construction of asphalt concrete pavement  Bituminous Surface Treatment        Construction of Completed works Primary construction method for bridge Construction of bored piles Construction of Foundation pit Construction of Abutment Construction of Pier Construction of beam Installation Construction of Completed works III PLAN FOR CONSTRUCTION EQUIPMENT AND MACHINERY AND MANPOWER MOBILIZATION General This is the most important factor in execution of works, because the quality and construction progress to be depended on this factor  The construction equipment and machinery : Bidder shall provide the construction equipment and machinery, testing instrument and measurement instruments in enough number and type with high productivity in good operation conditions, responding the advantaged construction line and technology for construction and completion of works as required by the Employer One workshop shall be arranged by the Bidder for maintaining construction equipment and machinery in good conditions time by time during construction period  The Key personnel The key personnel consisting the experience skill management staffs and professional engineers, they have been trained with the professional education and success experience from previous similar construction work, which they have participated in They are able to manage and direct construction and completion of works success  The Technicians, Machinery Operators, Driver and Skill Labor etc Bidder shall mobilize the experience Technicians, Machinery Operators, Driver and Skill Labor, they have been trained at the professional training schools and have the professional acknowledge and skill They are able to operate machinery and carry their work effectively  The Common Labor Firstly Bidder shall use maximally their available resource, if still not enough, the local labor shall be employed in place 3/ PHUONG THANH TRANCONSIN – GRBCC JV CIVIL WORKS CONTRACT PACKAGE A1 (KM 65+000-KM81+150)- DA NANG – QUANG NGAI SECTION Mobilization of manpower and equipments As shown on “Main machinery and equipment mobilization plan for construction of the contract” and “Workforce Mobilization Plan” 4/ PHUONG THANH TRANCONSIN – GRBCC JV ...CIVIL WORKS CONTRACT PACKAGE A1 (KM 65+000-KM 81+ 150)- DA NANG – QUANG NGAI SECTION GENERAL CONSTRUCTION PLAN I General Requirements Having studying the Bidding Documents... bridge Construction of bored piles Construction of Foundation pit Construction of Abutment Construction of Pier Construction of beam Installation Construction of Completed works III PLAN FOR CONSTRUCTION. .. PACKAGE A1 (KM 65+000-KM 81+ 150)- DA NANG – QUANG NGAI SECTION  Construction of asphalt concrete pavement  Bituminous Surface Treatment        Construction of Completed works Primary construction

Ngày đăng: 03/06/2021, 00:41

TÀI LIỆU CÙNG NGƯỜI DÙNG

  • Đang cập nhật ...

TÀI LIỆU LIÊN QUAN

w