1. Trang chủ
  2. » Luận Văn - Báo Cáo

Project progress management under resource constraints and uncertain environmental factors

154 5 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 154
Dung lượng 903,17 KB

Nội dung

Ngày đăng: 31/01/2021, 23:29

Nguồn tham khảo

Tài liệu tham khảo Loại Chi tiết
[1] Elmaghraby S.E (1977), “Activity networks: Project Planning and Control by Network Models”, John Wiley & Sons, 443 pages Sách, tạp chí
Tiêu đề: Activity networks: Project Planning and Control by Network Models”, "John Wiley & Sons
Tác giả: Elmaghraby S.E
Năm: 1977
[2] Harris R.B. (1978), “Precedence and arrow networking techniques for construction”, Wiley, New York Sách, tạp chí
Tiêu đề: Precedence and arrow networking techniques for construction”
Tác giả: Harris R.B
Năm: 1978
[3] Weglarz J. (1998), “Project Scheduling: Recent models, Algorithms and Applications”, Kluwer Academic Publishers, 552 pages Sách, tạp chí
Tiêu đề: Project Scheduling: Recent models, Algorithms and Applications”, "Kluwer Academic Publishers
Tác giả: Weglarz J
Năm: 1998
[4] Demeulemeester E.L. and Herroelen W.S. (2002), “Project Scheduling: A research handbook”, Kluwer Academic Publishers, 684 pages Sách, tạp chí
Tiêu đề: Project Scheduling: A research handbook"”, Kluwer Academic Publishers
Tác giả: Demeulemeester E.L. and Herroelen W.S
Năm: 2002
[5] Hendrickson C. (1998), “Project management for construction: fundamental concepts for owners, engineers, architects and builders”, Prentice Hall, http://www.ce.edu/pmbook [6] Burke Rory (1999), “Project Management: Planning & Control Techniques”, John Wiley&Sons, 343 pages Sách, tạp chí
Tiêu đề: Project management for construction: fundamental concepts for owners, engineers, architects and builders”, Prentice Hall, http://www.ce.edu/pmbook [6] Burke Rory (1999), “Project Management: Planning & Control Techniques”, "John Wiley "&Sons
Tác giả: Hendrickson C. (1998), “Project management for construction: fundamental concepts for owners, engineers, architects and builders”, Prentice Hall, http://www.ce.edu/pmbook [6] Burke Rory
Năm: 1999
[7] PMBK (1996), “A guide to the project management body of knowledge”, Project Management Institute Standards Committee, Newtown Square, PA 19073-3299 USA,176 pages Sách, tạp chí
Tiêu đề: A guide to the project management body of knowledge”, "Project "Management Institute Standards Committee, Newtown Square, PA 19073-3299 "USA
Tác giả: PMBK
Năm: 1996
[8] Kelley, J. E. Jr. (1963), “The critical-path method: resource planning and scheduling”, Industrial scheduling, Prentice Hall, Englewood Cliffs, pp.347-365 Sách, tạp chí
Tiêu đề: The critical-path method: resource planning and scheduling”, "Industrial scheduling
Tác giả: Kelley, J. E. Jr
Năm: 1963
[9] Wiest, J. D. (1964), “Some properties of schedules for large projects with limited resources”, Operations Research, Vol.12, pp.395-418 Sách, tạp chí
Tiêu đề: Some properties of schedules for large projects with limited resources”, "Operations Research
Tác giả: Wiest, J. D
Năm: 1964
[10] Wiest, J. D. (1967), “A heuristic model for scheduling large projects with limited resources”, Management Science, Vol.13(6), pp.B359-B377 Sách, tạp chí
Tiêu đề: A heuristic model for scheduling large projects with limited resources”, "Management Science
Tác giả: Wiest, J. D
Năm: 1967
[11] David, E. W., and Patterson, J. H. (1975), “A comparison of heuristic and optimum solutions in resource-constrained project scheduling”, Management Science, Vol.21(8), pp.944-955 Sách, tạp chí
Tiêu đề: A comparison of heuristic and optimum solutions in resource-constrained project scheduling”, "Management "Science
Tác giả: David, E. W., and Patterson, J. H
Năm: 1975
[12] Cooper D.F. (1976), “Heuristics for scheduling resource- constrained projects: An Experimental Investigation”, Management Science, Vol.22, No.11, pp.1186–1194 Sách, tạp chí
Tiêu đề: Heuristics for scheduling resource- constrained projects: An Experimental Investigation”, "Management Science
Tác giả: Cooper D.F
Năm: 1976
[13] TalBot B.F (1982), “Resource–Constrained Project Scheduling with time- resource tradeoffs: The non-preemptive Case”, Management Science, Vol. 28, No 10, pp.1197-1210 Sách, tạp chí
Tiêu đề: Resource–Constrained Project Scheduling with time-resource tradeoffs: The non-preemptive Case”, "Management Science
Tác giả: TalBot B.F
Năm: 1982
[14] Demeulemesster E.L. and Herroelen W.S. (1992), “A branch and Bound procedure for multiple resource-constrained project scheduling problem”, Management Science, Vol.38, pp.1803-1818 (1992) Sách, tạp chí
Tiêu đề: A branch and Bound procedure for multiple resource-constrained project scheduling problem”, "Management Science
Tác giả: Demeulemesster E.L. and Herroelen W.S
Năm: 1992
[15] Chan.W.T, Chua. D.K, and Kannan.G (1996) “Construction Resource Scheduling with Genetic Algorithms”, Journal of Construction Engineering and Management, ASCE, 122(2), pp.125–132 Sách, tạp chí
Tiêu đề: Construction Resource Scheduling with Genetic Algorithms”, "Journal of Construction Engineering and "Management
[16] Rainer Kolisch (1996), “Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation”, European Journal of Operational Research, Vol.90, pp.320-333 Sách, tạp chí
Tiêu đề: Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation”, "European Journal of Operational Research
Tác giả: Rainer Kolisch
Năm: 1996
[17] Matthew B.W.(1996), “A Genetic Algorithm for Resource-Constrained Scheduling”, Doctor Thesis in Mechanical Engineering, MIT (1996) Sách, tạp chí
Tiêu đề: A Genetic Algorithm for Resource-Constrained Scheduling”, "Doctor Thesis in Mechanical Engineering
Tác giả: Matthew B.W
Năm: 1996
[18] Savin D., Alkass S., and Fazio P. (1998) “Calculating Weight Matrix of Neural Network for Resource Leveling”, Journal of Computing in Civil Engineering, Vol. 12(4), pp.241-248 Sách, tạp chí
Tiêu đề: Calculating Weight Matrix of Neural Network for Resource Leveling”, "Journal of Computing in Civil Engineering
[19] Paul R.T. and Said S., (1998), “A Tabu Search Approach for the Resource Constrained Project Scheduling Problem”, Journal of Heuristics, Vol.4, pp123–139 Sách, tạp chí
Tiêu đề: A Tabu Search Approach for the Resource Constrained Project Scheduling Problem”, "Journal of Heuristics
Tác giả: Paul R.T. and Said S
Năm: 1998
[20] Tarek Hegazy (1999) “Optimization of Resource Allocation and Leveling Using Genetic Algorithms”, Journal of Construction Engineering and Management, ASCE, Vol. 125(3), 167-175 Sách, tạp chí
Tiêu đề: Optimization of Resource Allocation and Leveling Using Genetic Algorithms”, "Journal of Construction Engineering and Management, "ASCE
[61] Bayesian Network and simulation software for risk analysis and decision support, Website http://www.agena.co.uk/ Link

TÀI LIỆU CÙNG NGƯỜI DÙNG

TÀI LIỆU LIÊN QUAN