1) The stability of existing building can examination by settlement of ground, where they allocated. The main parameters in operating period: pumping grout or bentonite volumes and gro[r]
THÔNG TIN TÀI LIỆU
Thông tin cơ bản
Định dạng | |
---|---|
Số trang | 75 |
Dung lượng | 4,05 MB |
Nội dung
1) The stability of existing building can examination by settlement of ground, where they allocated. The main parameters in operating period: pumping grout or bentonite volumes and gro[r]
Ngày đăng: 29/01/2021, 02:02
TÀI LIỆU CÙNG NGƯỜI DÙNG
TÀI LIỆU LIÊN QUAN