Scenario 3: The digging trajectory for hard soil was used, and the three control tasks of penetration, drag, and curl were executed (Fig.. At the penetration segment, the boom was rota[r]
THÔNG TIN TÀI LIỆU
Thông tin cơ bản
Định dạng | |
---|---|
Số trang | 16 |
Dung lượng | 5,77 MB |
Nội dung
Scenario 3: The digging trajectory for hard soil was used, and the three control tasks of penetration, drag, and curl were executed (Fig.. At the penetration segment, the boom was rota[r]
Ngày đăng: 16/01/2021, 05:48
TÀI LIỆU CÙNG NGƯỜI DÙNG
TÀI LIỆU LIÊN QUAN