Tiêu đề International Bidding
Tác giả Vũ Ánh Nhi, Lê Quang Huy, Phùng Quang Minh, Vũ Thái Hưng, Lê Anh
Trường học National Economics University
Chuyên ngành International Business Management
Thể loại Group Assignment
Năm xuất bản 2023
Thành phố Hanoi
Định dạng
Số trang 11
Dung lượng 873,29 KB

Nội dung

Question 14: Presentation of steps in bidding procedure of bidding...2 Presentation of steps in bidding procedure of bidding...3 B.. Question 15: What does the bidding plan the plan on t

Trang 1

NATIONAL ECONOMICS UNIVERSITY NATIONAL ECONOMICS UNIVERSITY SCHOOL OF ADVANCED

EDUCATION PROGRAMS

***

GROUP ASSIGNMENT INTERNATIONAL BIDDING

Topic: Theory Question Group 4 (T14-15)

Class: International Business Management 63D - AEP

Hanoi, 2023

Vũ Ánh Nhi - 11214598 Lê Quang Huy - 11212599 Phùng Quang Minh - 11213930 Vũ Thái Hưng - 11212485

Lê Anh – 11213087

Trang 2

Table of Contents

A Question 14: Presentation of steps in bidding (procedure of bidding) 2

Presentation of steps in bidding (procedure of bidding) 3

B Question 15: What does the bidding plan (the plan on tenderer selection) usually include? 7

Why do Investor (both public and private) need to develop a bidding plan? 7

I What does the bidding plan (the plan on tenderer selection) usually include? 7

II Why do Investor (both public and private) need to develop a bidding plan? 9

Reference 11

A Question 14: Presentation of steps in bidding (procedure of bidding)

Biddingistheprocessofparticipatinginthetenderprocessasabidder.Interested companiessubmittingatenderproposaltothetendereriscalledbidding.Biddingopenson thebidopeningdateandclosesonthebidclosingdate.Oncethebiddingisclosed,the tendererevaluateseachtenderproposalandselectsthebestoneforawardingthetender contract

Thereisdifferencebetweenatenderandbid.Tenderissimplytheinvitationtosupply goodsorparticipateinaprojectwhilebidisaresponsetotheinvitation.Publishinga tenderisthefirststepinthetenderingprocesswhilebiddingisasubsequentstep.Inthe worldoftenderingtherefore,atenderandbidquotationaredifferentandusedaccordingly Tobidthesellerneedstoreadbothtenderdocumentsandbiddocumentstounderstandthe

requirementofthetenderandparticipateinthetenderprocess

Trang 3

What is the difference between a bid and tender?

Inshort,theyarethesamething.Traditionallya‘Tender’isaformaloffer(bid)tosupply goods,works,orservices,butitisnowalsocommonlyusedtodescribethecontracts peoplearebiddingfor–whichcanbeconfusing

Morespecifically,let'suseagovernmentcontractasanexample.Whenagovernmenthas aprojecttheyneedcompleted,theyissuearequestforproposals.Thisrequestwilloutline alloftherequirementsneededtocompletetheproject,includingbudget.Companiesthen submitabidwhichcoverstheircostsandtimeneededtocompletetheproject.The governmentwillthenselectacompanybasedonthebestbid.Atenderissimplysending thenecessarydocumentstorespondtothisrequestforproposals

What Types of Bid Processes Exist?

Open Tendering

Inanopentenderingbidprocess,alsocalledcompetitivebidding,anorganizationopens upthefloorforbidsfromanyparty,whichcancomefromanotherorganization,business, orevenanindividualinsomecases.Thistypeofbiddingishighlycompetitiveandoften occurswhenanorganizationwantstoreviewawiderangeofcandidatesforaproject acrossadiversetalentpoolatvariouspricepoints.

Selective Tendering

Inaselectivetenderingbidprocess,theorganizationacceptingbidspreselectsonlyafew toporganizationsorapplicantstoapply.Thisprocessmakesthebiddingpoolsmallerand typicallyonlyinvolvesvendorsthathaveapreexistingrelationshipwiththeorganization (thoughthisisnotalwaysthecase)

Negotiated Tendering

Inanegotiatedtenderingbidprocess,asinglevendorispreselectedtocompletethe project.Theselectedvendoristypicallyabusinesswithanotabletrackrecordinthe industryorhasapreexistingrelationshipwiththeprojectowner.Inthisprocess,the vendorandtheorganizationacceptingbidsgobackandforthtonegotiatethetermsofthe projectandworkcontract

Presentation of steps in bidding (procedure of bidding)

The Bidding Process

Step 1: Request for Proposals

Afteranorganizationhasdecidedtoopenupthefloorforbidsonaparticularproject,it willissueaninvitationforbid(IFB),arequestforquote(RFQ),orarequestforproposal (RFP).Whilethesetermsareunique,theyallservethesamepurpose:toexpresspublic interestinreceivingbidsforaproject.Fromthere,atendermanagerpreparesamore

Trang 4

detailedpackagethatfillsinanyremaininginformationabouttheproject,issuing organization,andwhattypesofskillsandservicesthey’relookingfor.

Thepackagewillincludedetailsaboutdeadlines,expectations,specifications,supporting documents,anddetailsaboutwhatrequirementsandsupplementaryinformationpotential biddersshouldincludeintheirbids.Dependingonthetypeofbidprocesstheorganization prefersfortheproject,theinvitationtobidwillbeextendedopenlyortoalimitednumber ofpreferredapplicants

Step 2: Bid Preparation and Submission

Oncetherequestforproposalhasbeenissued,it’suptointerestedpartiestoassembletheir bidandsubmitittotheorganizationacceptingbids.Duringthistimeperiod,parties assembleasanorganizationtofullyreviewtherequesteddocumentandtheproject’s terms

Beforedraftingaproposalofanykindinresponse,theteammustfirstmakesurethatthey understandtheclient’sneedsandhavethebandwidthandcapabilitytodeliveronthose termssuccessfully.Iftheteamdeterminesthattheprojectisagoodfitforthedeliverables andservicestheycanprovide,thentheycanbeginassemblingaprojectproposal

Oncetheproposalhasbeendrafted,theteamshouldtakeonefinallookatthedocumentas acollectivebeforesendingitbacktotheclientfortheirofficialreview

Step 3: Bid Evaluation and Selection

Duringthebidevaluationandscreeningprocess,theorganizationacceptingbidsreviews thevariousbidsandprojectproposalsubmissionsfromoutsidecontractors.Whilethis processcantakeweeksorevenmonths,it’simportanttorevieweachproposalthoroughly andcarefully.Aftertheorganizationreviewseachproposal,theywillselectthevendoror vendorsthattheywanttogranttheprojectto.

Step 4: Contract Negotiation

Onceavendorhasbeenselected,theywillnegotiatebackandforthwiththehiring organizationtoestablishagreed-upontermsandconditionsforprojectsatisfaction.During thesenegotiations,bothpartiesmaydiscusstheprojecttimeline,compensation,accessto resources,andmore.

Step 5: Project Delivery

Thefinalstepofthebiddingandtenderingprocessisprojectdelivery.Thisphasemarks theofficialbeginningofprojectworkandencompassestheentiretyoftheprojectlifecycle Attheconclusionofthisphase,theclientreceivesallofthekeydeliverablesandproject outcomesthatwerediscussedintheinitialplanningphase

For example we have 5 steps in construction bidding

Trang 5

Theconstructionbiddingprocessisbrokendownintofivekeysteps:bidsolicitation,bid submission,bidselection,contractformation,andprojectdelivery.

1 Bid solicitation

Duringthebidsolicitationphase,thepropertyownerortheirrepresentativewilltypically issueanInvitation for Bid (IFB),aRequestforQuote(RFQ),oraRequestforProposal (RFP)

Forpublicprojectbids,agenciesaregenerallyrequiredtoissueanopeninvitationto qualifyingcontractorswhoareregisteredtoworkongovernmentconstructionjobs

Onprivateprojects,bidsmaybeopenorsenttoasmallergroupofcontractorsinanon-competitivebiddingprocess.Insomecases,bidsmaybesolicitedthroughabid

management platform.

ARequestforInformation–sometimescalledaRequestforClarification–canplayarolein thebiddingprocess.BiddingexpertJanineTrinidadexplainshowandwhy

Regardlessoftheprojecttype,thebidpackagecontainsprojectdetailstoenable

contractorstoproduceanaccuratebid,including:

 Constructionspecifications

 Projectrequirements

 Contracttype

 Projectdeliverymethod

 Bonding&insurancerequirements

Thesolicitationwilltypicallyalsoaskforadditionalinformationaboutthecontractorswho apply,includingprofessionalqualificationsandexamplesofsimilarpastprojects.Project ownersusethisinformationtoprequalifythecontractors,ensuringthattheywillbeableto completethejobaspromised

Contractorswhomeettherequirementsandareinterestedinthejobwillbeabletosubmit abid

2 Bid submission

Inthebidsubmissionphase,interestedcontractorssubmitdocumentationabouttheproject timelineandcosts,aswellasinformationabouttheirbusiness.Duringthisphase,general contractorswilloftensolicittheirownbids,proposals,orRFIsfromsubcontractorsthey needtohiretocompletespecializedaspectsofthejob.TheGCwillcombinethe

subcontractorproposalstopreparethebidtheysubmittothepropertyowner.

Inordertocreateanaccuratebid,contractorsmustcreate an accurate estimateofproject costs,including:

 Labor

 Materials

Trang 6

 Equipment

 Overhead

 Profitmargin

Byreviewingtheprojectspecificationsandbillofquantities,performingmaterialtakeoffs, andcalculatingoverheadandprofitmargin,contractorsshouldbeabletonaildowna competitivebid.Agoodbidrepresentsthebestqualityatthemostreasonableprice Ifrequired,thecontractorwillneedtosubmitabid bondalongwiththebidinordertobe consideredfortheproject.Thebidbondservesasaguaranteetotheownerthatthe contractorwillbeabletocompletetheprojectaccordingtotheirbid

3 Bid selection

Whenitcomestobidselection,propertyownerswilloftenpickthebidwiththelowestor mostcompetitiveprice.Onpublicprojects,governmentrulesoftenrequirethatthelowest bidwins

However,commercialprojectownersoftentakeintoaccountavarietyoffactorsbeyond price,including:

 Projectexperience

 Safetyrecord

 Schedulingphilosophy

Becausecontractorssubmitbidsinavarietyofdifferentformatsandwithawiderangeof prices,thebidsolicitorwilltypicallygothroughaprocesscalled bid leveling.Duringbid leveling,theownerwillattempttostandardizethebidformatsasmuchaspossible, enablingthemtocomparethesimilaritiesanddifferencesbetweenthem.Thisprocess enablestheownertocompare"applestoapples"tomakeamoreinformeddecisionabout therightcontractorforthejob

4 Contract formation

Aftertheownerselectsabid,theyworktogetherwiththecontractortoformaconstruction contractthatbothpartieswilleventuallysign.Whilethetype of contract(e.g.fixed-price, timeandmaterials,etc.)isgenerallypredeterminedbytheowner,contractorsstillhave leewayatthispointtonegotiatethetermsofthecontract,aswellasthefinalpricing structure.

Eveniftheprojectownerisusingastandardcontractform,likeAIAorConsensusDocs

contractdocuments,thecontractoralwayshasanopportunitytonegotiate the provisions.

5 Project delivery

Eventhoughit'snottechnicallypartofthebidprocess,projectdeliveryplaysavery importantroleinbidding.

Trang 7

Beforebiddingstarts,thepropertyownerwilldeterminetheproject delivery method

Commondeliverymethodsinconstructioninclude:

 Design-Bid-Build

 Design-Build

 ConstructionManageratRisk

 IntegratedProjectDelivery(IPD)

Duringbidding,theprojectdeliverymethoddetermineshowbidsaresolicitedand submitted.Forexample,Design-Bid-Buildsolicitsbidsfromgeneralcontractorsbasedon designsfromaseparatefirm,whereasDesign-Build employs a single firm for design

and construction,sobidsareonlyreceivedfromsubcontractorssupportingthatfirm's

work

Afterbidding,theprojectdeliverymethodofteninfluencescontractnegotiations.For example,withtheconstruction-manager-at-risk (CMAR) method,thereislikelya guaranteedmaximumpriceinthecontract,whichtheconstructionmanagerwillwantto carefullynegotiatetoensureprojectprofitability

B Question 15: What does the bidding plan (the plan on tenderer selection) usually include?

Why do Investor (both public and private) need to develop a bidding plan?

I What does the bidding plan (the plan on tenderer selection) usually include? Types of Bid Processes

Open Tendering

-Inanopentenderingbidprocess,alsocalledcompetitivebidding,anorganizationopens upthefloorforbidsfromanyparty,whichcancomefromanotherorganization,business, orevenanindividualinsomecases.Thistypeofbiddingishighlycompetitiveandoften occurswhenanorganizationwantstoreviewawiderangeofcandidatesforaproject acrossadiversetalentpoolatvariouspricepoints.

Selective Tendering

-Inaselectivetenderingbidprocess,theorganizationacceptingbidspreselectsonlyafew toporganizationsorapplicantstoapply.Thisprocessmakesthebiddingpoolsmallerand typicallyonlyinvolvesvendorsthathaveapreexistingrelationshipwiththeorganization (thoughthisisnotalwaysthecase)

Negotiated Tendering

-Inanegotiatedtenderingbidprocess,asinglevendorispreselectedtocompletethe project.Theselectedvendoristypicallyabusinesswithanotabletrackrecordinthe industryorhasapreexistingrelationshipwiththeprojectowner.Inthisprocess,the

Trang 8

vendorandtheorganizationacceptingbidsgobackandforthtonegotiatethetermsofthe projectandworkcontract

The bidding plan (the plan on tenderer selection) usually include

-Nameofbiddingpackage:

Thenameofthebiddingpackagerepresentsthenature,contentandscopeofworkofthe biddingpackage,consistentwiththecontentstatedintheprojectandprocurement estimate.Incasethebiddingpackageconsistsofmanyseparateparts,thecontractor selectionplanmuststatethenametoshowthebasiccontentofeachpart

-Biddingpackageprice:

a)Biddingpackagepriceisdeterminedonthebasisoftotalinvestmentorestimate(ifany) fortheproject;Procurementestimatesforregularpurchases.Thebiddingpackagepriceis calculatedcorrectly,includingallcoststoimplementthebiddingpackage,including contingencycosts,fees,chargesandtaxes.Thebidpackagepriceisupdatedwithin28 daysbeforethebidopeningdateifnecessary;

b)Forbiddingpackagesprovidingconsultingservicesforpreparingpre-feasibilitystudy reportsandfeasibilitystudyreports,thebiddingpackagepriceisdeterminedonthebasis ofinformationontheaveragestatisticalpriceoftheprojects.Theprojecthasbeencarried outwithinaspecifiedperiodoftime;Estimatetotalinvestmentaccordingtoinvestment ratenorms;preliminarytotalinvestment;

c)Incasethebiddingpackageconsistsofmanyseparateparts,clearlystatetheestimated priceforeachpartinthebiddingpackageprice

-Capital:

Foreachbiddingpackage,thesourceofcapitalormethodofarrangingcapitalandtimeof fundingtopaythecontractormustbeclearlystated;Incaseofusingofficialdevelopment assistancecapitalorpreferentialloans,thesponsor'snameandcapitalstructuremustbe clearlystated,includingsponsorshipcapitalanddomesticcounterpartcapital

-Formandmethodofcontractorselection:

Foreachbiddingpackage,theformandmethodofcontractorselectionmustbeclearly stated;Choosedomesticorinternationalcontractors

-Timetostartcontractorselection:

Thetimetostartorganizingcontractorselectioniscalculatedfromtheissuanceofbidding documentsandrequestdocuments,clearlystatedbymonthorquarteroftheyear.Incase ofopenbiddingwithshortlistselectionproceduresapplied,thetimetostartorganizing contractorselectioniscalculatedfromtheissuanceoftheinvitationforexpressionof interestandprequalificationdocuments

-Contracttype:

Trang 9

prescribedinArticle62ofthisLawtoserveasabasisforpreparingtherequestfor expressiondocuments,prequalificationdocuments,biddingdocuments,andrequest documents;contracting

-Durationofcontract:

Contractperformancetimeisthenumberofdaysfromtheeffectivedateofthecontractto thedatethepartiescompletetheirobligationsasstipulatedinthecontract,excludingthe timeforperformingwarrantyobligations(ifany)

II Why do Investor (both public and private) need to develop a bidding plan?

 Khái  niệm:  The  bidding  strategy  is  viewed  as  an  obligatory  necessity  and  a fundamentalprerequisitefortheexecutionofbiddingendeavors.Additionally,the bidding  plan  is  interpreted  as  a  structured  document  delineating  responsibilities associatedwiththebiddingprocessforprojectsorprocurementprojections

 Thebiddingstrategyshouldguaranteecomprehensivecoverage.:

 numberofbiddingpackages

 contentofbiddingpackages

 sequenceofbiddingpackages

 sizeofbiddingpackages

 Investorsneedtodevelopabiddingplanbecause

 Openness,equity,andcompetitivenessintheprocessofselectingcontractors

 Investors  participating  in  the  bidding  process  must  be  legally independent andfinanciallyindependentfromthebiddingconsultant and  the  competent  state  agency,  the  inviting  party,  to  ensure competitioninthebiddingprocessfortheinvestmentproject

 Investorsbiddingforprojectsmayenjoyequalbenefits,suchas:

 Principleofvaluingefficiency

 Principleoffaircompetitionwithequalconditions

 Principleofcompleteandtransparentinformation

 Principleofprocurementinformationsecurity

 Principleofobjectiveandfairevaluation

 Principleofensuringbiddingsecurity

 Theemphasisoncompetitivenessisclearlymanifestedintherecent amendmentstotheprocurementlaw:Groupsofskilledworkerscan alsoparticipateinpackagesthatalignwiththeircapabilities.Thisaims toenhancecompetitiveness,transparency,andopenness,creatingan efficientbusinessenvironmentalongsidedeliveringbenefitsandcost savingsfortheinvitingparty

Trang 10

 Selectingajudiciousbiddingpackagewillenhancetheefficiencyofproject costs,quality,andprogress:Whenbiddingforaproject,developingawell-structuredbiddingplanwilltranslatetheinvestmentproject'srequirements intospecificbenchmarksorfigures,providingbiddingpartieswithabasisto formulatebiddingstrategies.Thisaimstoidentifytheoptimalapproachfor contractors.Withthesupportofabiddingplan,projectownerscaneffectively monitortheproject'sprogress,ensuringrobustqualityandstability

 Ensuringtheviabilityoftheprojectduringthebiddingprocessiscrucial, particularlywhenthebiddingmethodsarefrequentlyappliedtosignificant projectsofsubstantialvalue

 Clause1,Article64 stipulates,"The biddingpricemustinclude all costsfortheriskfactorsrelatedtothevolumeofworkandpotential price  fluctuations  that  may  arise  during  the  implementation  of  the contractcorrespondingtothecontractor'sresponsibilitiesincarrying outthebiddingpackage."Planningthebiddingprocesswillencompass thebiddingprice,andeffectivepricemanagementwillcontributetothe feasibilityoftheproject

 Establishing  an  unequal  guarantee  mechanism  among  contract participants.Thisproposalarisesfromthecurrentsituationoflingering debtsinconstruction,whichcontinuestoposechallengesandhardships forcontractors

Forexample:Inreality,thereisabacklogofnearly20%inthebidding package,andevenafter7yearsofputtingtheconstructionintooperation,it hasnotbeenpaid.However,accordingtotheBiddingLawandtheproposed amendments,  there  is  no  sanction  requiring  the  project  owner  to  ensure payment  to  the  contractor  Therefore,  the  Association  proposes:  "When completing60%-65%ofthevalueofthebiddingpackage,theprojectowner mustcommittoprovidingaguaranteetoensuresufficientcapitalforpayment ofthebiddingpackage."

Establishingconditionsforhighlyefficientinspectioneffortsandreducingrisksassociated withcontractorsisachievedthroughthebiddingplan,whichtranslatestherequirementsof theinvestmentprojectintospecificobjectivesorfigures.Thisprovidesthebidderwitha foundationfordevisingparticipationplans.Moreover,theinvestorcandependonitfor assessingandoverseeingtheprogressoftheprojectexecutedbythesuccessfulbidder

Reference

1 https://vienquanlyxaydung.edu.vn/ke-hoach-dau-thau-la-gi