(Luận văn) assessment of current environmental quality at cao bang cement factory in duyet trung commune, cao bang city, cao bang province

61 0 0
(Luận văn) assessment of current environmental quality at cao bang cement factory in duyet trung commune, cao bang city, cao bang province

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

Thông tin tài liệu

THAI NGUYEN UNIVERSITY THAI NGUYEN UNIVERSITY OF AGRICULTURE AND FORESTRY  - NGUYEN THI TRANG Topic title: “ASSESSMENT OF CURRENT ENVIRONMENTAL QUALITY AT CAO BANG CEMENT FACTORY IN DUYET TRUNG COMMUNE, CAO BANG CITY, CAO BANG PROVINCE” BACHELOR THESIS an Lu n va Mode of study : Full-time : International Training and Development Center si : 2010 - 2015 d oa nl w Batch ac Faculty : Environmental Science and Management th Major oi lm ul nf va an lu Thai Nguyen, 2015 at nh z z THAI NGUYEN UNIVERSITY THAI NGUYEN UNIVERSITY OF AGRICULTURE AND FORESTRY  - NGUYEN THI TRANG Topic title: “ASSESSMENT OF CURRENT ENVIRONMENTAL QUALITY AT CAO BANG CEMENT FACTORY IN DUYET TRUNG COMMUNE, CAO BANG CITY, CAO BANG PROVINCE” BACHELOR THESIS an Lu : Full-time Major : Environmental Science and Management n va Mode of study th : 2010 – 2015 w : Assoc.Prof DO THI LAN d oa nl Supervisor : K42 AEP Year si Class : International Training and Development Center ac Faculty oi lm ul nf va an lu Thai Nguyen, 2015 at nh z z Thai Nguyen University of Agriculture and Forestry Bachelor of Science in Environmental Science and Degree program Management Student name Nguyen Thi Trang Student ID DTN1054120166 Assessment of current environmental quality at Cao Bang Cement Factory in Duyet Trung commune, Cao Bang city, Thesis title Cao Bang province Assoc.Prof Do Thi Lan Supervisor Abstract In recent years, environmental pollution is becoming worse Environmental protection is essential, especially for industrial areas Cao Bang Cement Factory is in Duyet Trung commune, Cao Bang province where the environment is being polluted Therefore, we have studied the establishment of “Assessment of current environmental quality at Cao Bang Cement Factory in Duyet Trung commune, Cao Bang city, Cao Bang province " The aim of the study is to assess the current an Lu sources of environmental pollution in Cao Bang cement factory and having measures to protect the environment as well Therefore, that citizen can study and n va work in a safe and clean environment In addition, this enables students to enhance ac th their knowledge, awareness, and responsibility for the environment We conducted si to collect documents, take samples to analyze the environmental quality Analyzing w criteria of environment in Cao Bang factory, we considered it as the basis of oa nl evaluating the current state of the environment The results of analyzing air sampled d showed that all the targets are within the permissible limits except the noise in lu an cement works is quite high (86.1 dBA) exceeds 1.1 dBA Moreover, analysis of nf va wastewater sampled in the factory in comparisons with QCVN 40:2011/BTNMT lm ul (National technical regulation on industrial waste water) showed that pollutants in waste water that are much smaller than the regulation allows However, index oi at nh z z numbers are still quite high such as the percentage of Mn is 0.641 mg/l while allowed standard is mg/l From results above, we can see that the environmental quality is severely polluted, so we have increased the effective solutions to minimize negative impacts on the environment, especially air environment Simultaneously, there are best solutions to minimize effects to local people as well as workers Environmental Keywords quality, Environmental pollution, Environmental protection, Citizen, Awareness, Assessment Number of pages pages Date of submission January 15, 2015 an Lu n va ac th si d oa nl w oi lm ul nf va an lu at nh z z 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.33.44.55.54.78.655.43.22.2.4.55.2237.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.66 an Lu n va ac th si d oa nl w oi lm ul nf va an lu at nh 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.99 z z 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.33.44.55.54.78.655.43.22.2.4.55.2237.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.66 I ACKNOWLEGDEMENT Firstly, I would like to say thanks to Assoc.Prof Do Thi Lan, my research supervisors, enthusiastic encouragement and useful critiques of this research work It has contributed immensely to the evolution of my ideas to complete my project on schedule Secondly, I would also like to extend my thanks to the technicians of Cao Bang Environmental Protection Agency who help in offering me the resources related to project Finally, I wish to thank my family for their support and encouragement throughout my study A special thanks to all those other persons who helped me in completing this report During the process of completing project, mistake is inevitable Thanks so much! an Lu n va ac th si d oa nl w oi lm ul nf va an lu at nh 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.99 z z 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.33.44.55.54.78.655.43.22.2.4.55.2237.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.66 II TABLE OF CONTENTS PART I: INTRODUCTION 1.1 Background and rationale 1.2 Objectives of study .2 1.2.1 To assess the current environment 1.2.2 To analize the sites which are exited and limited in manegement of environmental quality 1.2.3 To propose the solutions in environmental protection .2 1.3 Significations of the study 1.3.2 Practical significance PART II: LITERATURE REVIEW 2.1 Scientific basis of topics .5 2.1.1 Theoretical basis 2.1.2 Scientific basis .7 2.2 Factual basis an Lu 2.2.1 Status of research on the quality of air in the world n va 2.2.2 Status of research on the quality of air in Vietnam .10 ac th 2.2.3 Current environment in Cao Bang province 11 2.2.4 Overall assessment overview 12 si PART III: METHODOLOGY 13 nl w d oa 3.1 Subjects and study area 13 an lu 3.1.1 Research subject 13 nf va 3.1.2 Scope of study .13 lm ul 3.2 Location and time .13 3.3 Contents 13 oi at nh 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.99 z z 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.33.44.55.54.78.655.43.22.2.4.55.2237.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.66 III 3.4 Research Methodologies 13 3.4.1 Methods of collecting secondary data 13 3.4.2 Methods of sampling and laboratory analysis 14 3.4.3 Methods of data processing 15 3.4.4 Integrated approach, comparing 15 PART IV: RESULTS 16 4.1 General information about Cao Bang Cement 16 4.1.1 Natural Conditions .16 4.2 Basic information about factory 19 4.2.1 The information about operation 19 4.2.2 Overview of scale, performance, and activities related to environment 20 4.3 Current environment at Cao Bang Cement 25 4.3.1 Air environment 28 4.3.2 Water environment 30 4.3.3 Solid waste 33 4.4 Environmental protection of the cement factory in Cao Bang 34 an Lu 4.4.2 Exited measures in environmental protection in the operation of plan .44 4.5 Proposed solutions to reduce environmental pollution for Cao Bang Cement n va factory 44 ac th 4.5.1 Management Solutions 44 si w 4.5.2 Technical Solutions .46 oa nl 4.5.3 Propaganda and education solutions 47 d PART V: CONCLUSION AND PETITION 48 an lu 5.1 Conclusion 48 va oi lm ul nf BIBLIOGRAPHY .Error! Bookmark not defined at nh 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.99 z z 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.33.44.55.54.78.655.43.22.2.4.55.2237.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.66 IV LIST OF TABLES Table 3.1: Locations where monitor air quality at Cao Bang Cement Factory 14 Table 4.1 Gaseous components .26 Table 4.2 Identify sources of negative impacts on the environment and subjected to impact in the production phase 27 Table 4.3 the monitoring result of air environment in factory’s area 28 Table 4.4 The monitoring result of air environment surrounding factory’s area 29 Table 4.5 The analysized result of wastewater of factory 31 Table 4.6 The analysized result of water quality of the factory 32 Table 4.7 The components of solid waste from living activities 33 an Lu n va ac th si d oa nl w oi lm ul nf va an lu at nh 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.99 z z 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.33.44.55.54.78.655.43.22.2.4.55.2237.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.66 V LIST OF FIGURES Figure 4.1 Geographic location of Cao Bang Cement Factory 16 Figure 4.2 Raw grinding system KMP 60-5 37 Figure 4.3 Precipitator’s system JLMC 82-9 40 an Lu n va ac th si d oa nl w oi lm ul nf va an lu at nh 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.99 z z 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.33.44.55.54.78.655.43.22.2.4.55.2237.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.66 37 an Lu n va ac th si oa nl w d Figure 4.3 Raw grinding system KMP 60-5 oi lm ul nf va an lu at nh 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.99 z z 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.33.44.55.54.78.655.43.22.2.4.55.2237.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.66 38 Flow chart Silo stores raw materials Going out Air compressor Balances Gas furnace Band conveyor Dust chatcher by haversack KMP 60-5 Attrition mill Exhaut fan Máng khí động sau nghiền XZ 315 Bucket conveyor of coarse grain TH 400 Screw LS 315 an Lu Separator n va Bucket conveyor of close grain TH 400 ac th Storage silo si The main road d oa nl w Legend: an lu The road of exhaust fumes with dust oi lm ul nf va The road of exhaust fumes which ais treated at nh 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.99 z z 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.33.44.55.54.78.655.43.22.2.4.55.2237.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.66 39 Description: Dust were collected inside the cloth bag filter system KMP 60-5 thanks to fan inlet Due to the impact between the bag and the air pressure, blow compressed air into the inner end of each work cycle Smoke is dissolved and passed through a cloth bag under the blower goes into the environment, and the dust are kept falling into receiving hopper Then it is passed through the dust collectors LS 315, be transported to the bucket TH 400 and shipped to the storage silo After installed and put into operation, the dust filter operates very well, not only contribute to reduce the environmental pollution, but also increase the yield of raw mill equipment up to 30% c Stage in furnace - Time to start construction: 01/06/2012 - Complete installation type of bag filter system JLMC 84-9 - Choose the new installation of the system for 02 kilns of clinker, select dust an Lu catcher JLMC 84-9 according to the European standards advanced technology n va - The basic specs of dust filter bag KMP 60-5: ac th + Polyester bag: Ø130 x 6000mm: 756 ones si + Blower motor: 132 KW d oa + Pressure = 3800Pa nl w + Flow Fan: 120 000 m3/h nf va an lu + Filter area: 1765 m2 oi lm ul - Time completed and put into use: 30/08/2012 at nh 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.99 z z 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.33.44.55.54.78.655.43.22.2.4.55.2237.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.66 40 Figure 4.3 Precipitator’s system JLMC 82-9 Flow chart Flue dust No.1 Flue dust No.2 Bụi băng xích, kẹp hàm lò Filter dust by haversack JLMC 84-9 Bucket conveyor TH 400 Screw LS 315 and VT 300 Going out Bụi băng xích, kẹp hàm lị Exhaut fan an Lu n va ac th Air compressor si Storage silo d oa nl w Legend: va an lu The main road The road of exhaust fumes with dust oi lm ul nf The road of exhaust fumes which ais treated at nh 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.99 z z 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.33.44.55.54.78.655.43.22.2.4.55.2237.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.66 41 Discription: Hazes were collected inside by the fan inlet JLMC 84-9 Due to the impact between the bag and the air pressure which is inside the air blows after each work cycle, smoke is dissolved and passed through a cloth bag under the blower goes into the environment After installed and put into operation, the dust filter operates very well, not only contribute to reduce the environmental pollution 4.4.1.2 Measures to minimize negative impacts on the water environment Wastewater treatment diagram in the West The cooling water Canal Water line Over water an Lu Tank 200m3 Reuse for production Tank 20m3 Streams Rainfall n va ac th si Discription: oa nl w Water which is used for cooling equipment, living This type of water is no d turbin and reuse for production Excess water goes down the drain overflow and Na va an lu Lung stream machine oi lm ul nf There are two tanks with volume of 20m3 and 200m3 cleaned regularly by at nh 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.99 z z 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.33.44.55.54.78.655.43.22.2.4.55.2237.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.66 42 4.4.1.3 Measures to minimize negative impacts of generated solid waste on the environment - Solid waste from living activities: be collected in safety container Company already signed a contract with Development Investment and Environment Company for collection and treatment - Solid waste from manufacturing: be collected to reuse - Hazardous waste: be collected in safety containers In addition, the company also applied a number of different solutions to communication and education to raise awareness of environmental protection, such as: - Establish rules of order, hygiene and environmental protection in the collective workers and factories - To launch movements of hygiene and environmental protection in the factory - Guidance classifications for officers and employees of the Company an Lu 4.4.1.4 Measures to minimize the impact of noise and vibration - Using spring or caoutchouc to reducing large vibratory from large machines All these devices are moving dynamic balance during installation n va ac th - Design of plant and machinery manufacturing system to ensure noise and si vibration that allows to set standards, and ensure sound insulation between the oa nl w production area to the work area and the area outside of the factory d - In addition, there are regular routine checks equipments which create noise, an lu equipped with anti-noise devices for workers such as ear plugs, masks, hats, glasses nf va occupational diseases and health protection as follows: oi lm ul - For employees working in rock drilling unit, should take measures to prevent at nh 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.99 z z 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.33.44.55.54.78.655.43.22.2.4.55.2237.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.66 43 + To watch for the health of workers + Ensure that the working mode and the rest as prescribed work with devices with vibration of the hospital work wear + Equipment of anti-vibration gloves for workers + Organization of career guidance and supplemental routine 4.4.1.5 Measures to prevent and minimize the environmental risks a Disaster Prevention - Develop and apply production plans in accordance with the characteristics of the natural conditions in the area - There are plans to arrange temporary accommodation for workers who cannot go on during the rainy b Minimize environmental risks - Check regularly and have plans to promptly remedy the problem of environmental equipment, technology equipment an Lu - Have good announcements when occor blasting n va - When there is a problem of environmental risks occurring, they may need to ac th stop operation of the equipment, evacuation of people from the location of the incident si and conduct troubleshooting oa nl w - When labor accidents or environmental incidents related to the plant, the plant d will be reported to the authorities jointly handled oi lm ul nf va an lu at nh 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.99 z z 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.33.44.55.54.78.655.43.22.2.4.55.2237.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.66 44 4.4.2 Exited measures in environmental protection in the operation of plan Factory made basic measures to reduce environmental pollution and the measures have been significantly minimized the environment However, there are still some shortcomings in the environmental protection of the plant, such as: - There are still no measures to protect and store the soil environment after mining and manufacturing - There are no measures to protect the soil environment of the area - Measures to reduce dust has mainly done in the factory area, should take measures to reduce dust during transportation of materials, ores, on the road to limit the impact on local people - For measures to reduce water pollution, the factory has done quite well, but the air environment has not yet to bring the best performance - No measures to reduce noise pollution in the region's manufacturing plant efficiently, especially drunk crushing area 4.5 Proposed solutions to reduce environmental pollution for Cao Bang Cement factory an Lu 4.5.1 Management Solutions n va * For the functional units th ac - Inspection, testing and production business, and using of resources should be si conducted regularly at all levels to detect violations to handle timely correction oa nl w Strengthening capacity for environmental monitoring, dedicated funding to maintain proper operation of environmental monitoring, establish mechanisms to share and d lu an exchange information with the national monitoring system, with management agencies nf va and research institutions to build environmental database on the status and changes in oi economic development lm ul environmental quality in the area for serving environmental management and socio- at nh 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.99 z z 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.33.44.55.54.78.655.43.22.2.4.55.2237.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.66 45 - Using of economic instruments in environmental management including the promulgation and enforcement of taxes, environmental protection fees, etc… Economic instruments will facilitate the company proactively plan for environmental protection and compliance through integrated environmental protection costs in the cost of production, sales This measure is being applied more and given satisfactory results - Increasing investment in environmental research and activities which are used to develop socioeconomic, with special focus on economic cost-benefit calculations in environmental impact assessment for the investment projects, policy, planning, development plans - For local government management where necessary to monitor, should have more close management * For cement factory - Maintaining of environmental pollution monitoring and reporting to the authorities as a basis for environmental management an Lu - There are part-time officers in charge of the safety issues of labor and n va environmental issues th ac - Developing plans for prevention and remedying of environmental incidents si w - Building regulations on environmental oa nl - Adding environmental management department to directly handle, collecting d environmental issues such as air, water, hazardous waste, waste an lu oi lm ul nf va - Applying the technology which produces less impact on the environment at nh 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.99 z z 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.33.44.55.54.78.655.43.22.2.4.55.2237.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.66 46 4.5.2 Technical Solutions Maintaining the positive aspects of environmental protection at the factory In addition, strict compliance with the regulation of production and application of innovative technologies in the production process in order to minimize the impact on the environment - Cleaner production measures: + Reduce waste sources: Maintenance of good machinery, successful implementation of regulations to prevent leakage and spillage, enhance the effectiveness of rules in work (in accordance with the inspection and proper training Check process better: Modification of rules work, the rules in operating machinery and resuming recording to the technology process in order to have higher performance and generated less waste an Lu + Recycling: n va Reuse of waste materials in the same technological process or there are ac th effective applications in another process in the company si d environmental impact oa nl w + Improved product: the product can be improved in order to minimize the oi lm ul nf va an lu at nh 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.99 z z 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.33.44.55.54.78.655.43.22.2.4.55.2237.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.66 47 4.5.3 Propaganda and education solutions Communication and education measures have a huge role in reducing environmental pollution, so the company should proceed as follows: Organization of annual education which is strictly observed the rules of the company for officials and employees Creating conditions for the employees to understand the importance of reducing environmental pollution and accident prevention, and environmental incidents To create employees’ responsibility to environmental protection Organization of short-term training courses on the environment through the activities of organizations, associations Organization of the general session in the new year's sanitation plant, World Environment Day and other occasions Through that education for environmental protection consciousness an Lu n va ac th si d oa nl w oi lm ul nf va an lu at nh 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.99 z z 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.33.44.55.54.78.655.43.22.2.4.55.2237.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.66 48 PART V CONCLUSION AND DISCUSSION 5.1 Conclusion The result of the study showed that the environment in factory is quite good Analysis of air sampled in the factory in comparisons with TCVN 7365: 2003, QCVN 05:2013/BTNMT, QCVN 06:2009/BTNMT, QCVN 26:2010/BTNMT (National Technical Regulation on industrial air quality) indicates that: All the targets are within the permissible limits except the noise in cement works is quite high (86.1 dBA) exceeds 1.1 dBA Analysis of wastewater sampled in the factory in comparisons with QCVN 40:2011/BTNMT (National technical regulation on industrial waste water) showed that pollutants in waste water that are lower than the regulation allows However, index numbers are still quite high such as the percentage of Mn is 0.641 mg/l while allowed standard is mg/l 5.2 Discussion an Lu However, on the basis of understanding the natural characteristics, socioeconomic, environmental status, and evaluating the effectiveness of waste n va management system, the impact of cement factory on environment and the measures th ac for that: Cao Bang Cement factory is operated for a long time (1997) with outdated the si w equipment and operating facilities Although the operation of the plant is bringing oa nl socioeconomic benefits, the negative impact on the environment is still not inevitable d Thus, managers in Cao Bang Cement factory had solutions to protect environment that lu va an including: the measures to minimize negative impacts on the environment, especially air environment Simultaneously, there are best solutions to minimize effects to local oi lm ul nf people as well as workers at nh 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.99 z z 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.33.44.55.54.78.655.43.22.2.4.55.2237.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.66 49 REFERENCES Abu-allaban and Abu-Qudais (2011) Aerosol and Air Quality Reseach, 11:802-810 Cao Bang Cement Join Stock Company – Construction (2013) The result of pollution treatment report based on the Decision No.990/QD-UBND of Cao Bang Cement Company on 24/04/2013 Cao Bang Cement Factory Cao Bang Environmental Protection Agency – Ministry of Resource and Environment (2006) Current situation of National environmental report State Publishing House Cao Bang Environmental Protection Agency (2010) Assessment of Cao Bang current situation of environment report Cao Bang Department of Resource and Environment Grady, C.P.L, Jr., and H.C Lim (1980) Biological Waste Water Treatment, Marcel Dekker, New York Hien, H.T & Ly, B.S (2007) Air environmental protection Publisher of Construction Khoa, L.V, Quynh, N.X & Viet, N.Q (2013) Environmental chemical indicators Ha Noi Educational Publishing House an Lu Metcalf, Eddy (2003) Technical wastewater treatment and reuse McGraw Hill n va New York th ac Ministry of Resource and Environment (2005) Decision No 22/2006/QD-BTNMT si on the application of ISO on environment Publisher of Labor-Social, Ha noi oa nl w Nong, N.N & Phuong, D.T.H (2006) Lecture of environmental management Thai d Nguyen University of Agriculture and Forestry, pp.11 lu va an Resource and Environment Research Center (1997) Report on environmental University oi lm ul nf impact assessment of the Cao Bang Cement Factory Ha Noi National at nh 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.99 z z 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.33.44.55.54.78.655.43.22.2.4.55.2237.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.66 50 The National Assembly of Viet Nam (2005) Environmental Protection Law Politic Publisher, pp.7 Quy, V (2011) Some problems of Global Environment Ha Noi National University World Summit Conference and Sustainable Development (2002) Jonhannesburg & Khoa, L.V (2001) Environmental Science Publisher of Education FICO Cement (2013) An overview of Cement Industry in Viet Nam Retrieved from http://ximangfico.com/tin-tuc/xi-mang/3044-tong-quan-nganh-cong- nghiep-xi-mang-viet-nam.html?language=en (Accessed on 22/10/2014) Hoa Binh Magazine, Science – Technology – Environment Column (2013) Current situation of environmental pollution in Vinh Son Cement Factory Retrieved from http://www.baohoabinh.com.vn/28/81122/Tinh_trang_o_nhiem_moi_truong_o_ Nha_may_xi_mang_Vinh_Son.htm (Accessed on 28/10/2014) Environmental Protection Column (2014) Effort in reducing greenhouse gases Retrieved from an Lu http://www.moitruong.com.vn/Home/Default.aspx?portalid=33&tabid=19&distid=15 n va 793 (Accessed on 25/11/2014) ac th si d oa nl w oi lm ul nf va an lu at nh 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.99 z z 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.C.33.44.55.54.78.655.43.22.2.4.55.2237.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.66 37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.55.77.77.99.44.45.67.22.55.77.C.37.99.44.45.67.22.99

Ngày đăng: 25/09/2023, 07:34

Tài liệu cùng người dùng

  • Đang cập nhật ...

Tài liệu liên quan