1625 assignment 2 (pass) 1625 assignment 2 (pass) 1625 assignment 2 (pass) 1625 assignment 2 (pass) 1625 assignment 2 (pass) 1625 assignment 2 (pass) 1625 assignment 2 (pass) 1625 assignment 2 (pass) 1625 assignment 2 (pass) 1625 assignment 2 (pass) 1625 assignment 2 (pass) FPT GREENWICH
Higher Nationals in Computing Unit 06: Managing a Successful Computing Project ASSIGNMENT Assessor name: NGO QUOC ANH Learner’s name: Đào Vĩnh Khang ID: GCS200222 Class: GCS0905B Subject code: 1625 Assignment due: 1/ / 2023 /2023 Assignment submitted: 1/ ASSIGNMENT FRONT SHEET Qualification BTEC Level HND Diploma in Computing Unit number and title Submission date Unit 06: Managing a Successful Computing Project 14-02-2022 Date Received 1st submission Re-submission Date 14-02-2023 Date Received 2nd submission Student Name DAO VINH KHANG Student ID GCS200222 Class GCS0905B Assessor name NGO QUOC ANH Student declaration I certify that the assignment submission is entirely my own work and I fully understand the consequences of plagiarism I understand that making a false declaration is a form of malpractice Student’s signature Grading grid P1 P2 M1 M2 D1 D2 KHANG ❒ Summative Feedback: Grade: Signature & Date: ❒ Resubmission Feedback: Assessor Signature: Date: ASSIGNMENT BRIEF Qualification Unit number and title BTEC Level HND Diploma in Computing Unit 06: Managing a Successful Project Assignment title Plan and conduct a small scale research activity Academic Year 2022 - 2023 Unit Tutor Do Tien Thanh Issue date 03 August 2022 Submission date Submission Format: Format: The submission is in the form of an individual written report that shows how you have manage the project This should be written in a concise, formal business style using single spacing and font size 12 You are required to make use of headings, paragraphs and subsections as appropriate, and all work must be supported with research and referenced using the Harvard referencing system Please also provide a bibliography using the Harvard referencing system Submission Students are compulsory to submit the assignment in due date and in a way requested by the Tutors The form of submission will be a soft copy in PDF posted on corresponding course of http://cms.greenwich.edu.vn/ Note: The Assignment must be your own work, and not copied by or from another student or from books etc If you use ideas, quotes or data (such as diagrams) from books, journals or other sources, you must reference your sources, using the Harvard style Make sure that you know how to reference properly, and that understand the guidelines on plagiarism If you not, you definitely get fail Assignment Brief and Guidance: Introduction The environmental impact of digital transformation The amount of data created and stored globally is expected to reach 175 Zettabytes by 2025, a six-fold increase from 2018 This will demand additional hardware and power consumption, which; in turn, will increase the environmental impact of the digital sector and there is already increasing attention on the environmental footprint of ICT equipment and services as they become more widespread in all aspects of human life It is the responsibility of everyone to take action in addressing the challenges of climate change, as professionals we must also seek ways that the digital sector can play its part While digital technologies are one of the sectors that has achieved greater efficiency; achieving about 100 times more computation power from the same amount of energy per decade, it remains unsustainable The sector must continue to seek ways in which it can continue to support and drive innovation, while addressing the global climate emergency for a greener and fairer future This unit will enable students to explore the impact of digital endpoint devices and ways to reduce environmental damages, OR the potential of refurbishing, repairing and reusing digital devices rather than replacing Tasks As a member of Research and Development department, you have been assigned a mini-project to find out the impact of digital endpoint devices and ways to reduce environmental damages, OR the potential of refurbishing, repairing and reusing digital devices rather than replacing You need to primary research (both qualitative and quantitative research) and secondary research to find out that impact and conduct a report for your research Even it’s a mini-project, you must apply project management (PM) techniques such as project charter with aims, objectives, cost etc As for time management, you need to produce WBS and Gantt chart with reasonable tasks and time A project logbook is required to provide evidence of the project development process and ongoing reflection for every week This logbook will be needed later for your reflection and evaluation in Assignment As part of QA (quality assurance) policy, in the report you also need to critically evaluate the PM process and appropriate research methodologies applied Your report must have an introduction stating the project aims and objectives This must be followed by a copy of your project management plan Your plan should show the milestones when you will review with your tutor your ongoing progress so far You will submit your logbook which shows how you have carried out the project Learning Outcomes and Assessment Criteria Pass Merit LO1 Establish project aims, objectives and timeframes based on the chosen theme P1 Devise project aims and objectives for a chosen scenario P2 Produce a project management plan that covers aspects of cost, scope, time, quality, communication, risk and resources M1 Produce a comprehensive project management plan, milestone schedule and project schedule for monitoring and completing the aims and objectives of the project P3 Produce a work breakdown structure and a Gantt Chart to provide timeframes and stages for completion LO2 Conduct small-scale research, information gathering and data collection to generate knowledge to support the project P4 Carry out small-scale research by applying qualitative and quantitative research methods appropriate for meeting project aims and objectives M2 Evaluate the accuracy and reliability of different research methods applied Distinction LO1 & LO2 D1 Critically evaluate the project management process and appropriate research methodologies applied lOMoAR cPSD| 17507882 The reasons that would lead surveyors to buy a robotic vacuum cleaner: Evaluation about interview and survey - All people choose to use robotic vacuum cleaner because its excellent automatic features and technology help people a lot in cleaning their homes when they don’t have time to it - Most people are willing to pay between to over 10 million VND to buy a genuine robotic vacuum cleaner with a warranty from big brands instead of cheap, bulky, low-powered robots that are difficult to move ~ 38 ~ - In terms of selection criteria, 40% of consumers aim for a compact, easy-to-use robotic vacuum cleaner 30% focus on technology and the features it offers 20% of consumers choose robot based on brand and the other 10% choose to buy robot according to price Draw conclusions from the collected data Based on the collected data, it can be concluded that the use of a smartphone as a controller for automatic robotic vacuum cleaners is a feasible and convenient option for users The majority of users found the smartphone app easy to use (86.7%) and preferred it over a traditional remote control (73.3%) Users also appreciated the added functionality of being able to schedule cleaning times (76.7%) and track the cleaning progress (70%) In terms of performance, the robotic vacuum cleaners were effective in cleaning floors (96.7%) and users reported a high level of satisfaction with the product (90%) However, some users expressed concerns about the initial setup process (33.3%) and occasional connectivity issues with the smartphone app (23.3%) In conclusion, the use of a smartphone as a controller for automatic robotic vacuum cleaners is a promising technology that provides users with added convenience and functionality While some users may encounter initial setup and connectivity issues, overall satisfaction with the product and its performance is high Generalized 2.1 Check, select data The collected data suggests that: The majority of users (86.7%) found the smartphone app easy to use for controlling automatic robotic vacuum cleaners ~ 39 ~ lOMoAR cPSD| 17507882 Users prefer using the smartphone app (73.3%) over a traditional remote control Most users appreciated the added functionality of scheduling cleaning times (76.7%) and tracking cleaning progress (70%) The robotic vacuum cleaners were effective in cleaning floors (96.7%) Most users reported high satisfaction with the product (90%) Some users encountered initial setup issues (33.3%) and connectivity issues with the smartphone app (23.3%) Based on the data, it can be concluded that the use of a smartphone as a controller for automatic robotic vacuum cleaners is a feasible and convenient option for users, with high satisfaction rates and added functionality 2.2 Concluded In conclusion, the use of a smartphone as a controller for automatic robotic vacuum cleaners is a promising technology that provides users with added convenience and functionality While some users may encounter initial setup and connectivity issues, overall satisfaction with the product and its performance is high Users appreciate the ease of use and added features such as scheduling cleaning times and tracking progress, which are not available with traditional remote controls The effectiveness of the robotic vacuum cleaners in cleaning floors further adds to the appeal of this technology Report 3.1 Prepare standard report file format This part involves formatting the report according to the standard file format required by the instructor, including the front sheet and the template layout 3.2 Write a report ~ 40 ~ The report writing part involves summarizing the data collected and drawing conclusions based on the findings In this case, the report focuses on the feasibility and convenience of using a smartphone as a controller for automatic robotic vacuum cleaners 3.3 Check the report again After completing the report, it is important to review and revise the content, layout, and references to ensure accuracy and correctness Any errors or inconsistencies should be corrected before submitting the final report M1 Produce a comprehensive project management plan, milestone schedule and project schedule for monitoring and completing the aims and objectives of the project Comprehensive project manager plan Task name Start Finish Duration Assigned Research to develop the automatic Tue 12/01/2023 robotic vacuum cleaner controlled by smartphone Thu 11/03/2023 58 days All member Initiation Tue 12/01/2023 Wed 20/01/2023 days KHANGDV Tue 12/01/2023 Wed 13/01/2023 days 1.1 Data research ~ 41 ~ lOMoAR cPSD| 17507882 1.1.1 User research Tue 12/01/2023 Tue 12/01/2023 day 1.1.2 Problem user research Wed 13/01/2023 Wed 13/01/2023 day 1.2 Data synchronization Thu 14/01/2023 Wed 20/01/2023 days 1.2.1 Data classification Thu 14/01/2023 Thu 14/01/2023 day 1.2.2 Data modeling Fri 15/01/2023 Fri 15/01/2023 day 1.2.3 Data visualization Mon 18/01/2023 Wed 20/01/2023 days Thu 21/01/2023 Tue 02/02/2023 days Mon 25/01/2023 days Thu 21/01/2023 Fri 22/01/2023 days Mon 25/01/2023 Mon 25/01/2023 day Tue 26/01/2023 Thu 28/01/2023 days Tue 26/01/2023 Wed 27/01/2023 days Thu 28/01/2023 Thu 28/01/2023 day Fri 29/01/2023 Tue 02/02/2023 days Fri 29/01/2023 Fri 29/01/2023 day Tue 02/02/2023 days Tue 09/02/23 days Planning 2.1 Divide project into small Thu 21/01/2023 tasks 2.1.1 Estimate time of each KHANGDV task 2.1.2 Identify milestones and schedule summaries 2.2 Plan budget 2.2.1 Cost for the entire project 2.2.2 Contingency cost 2.3 Plan risk 2.3.1 Resource management 2.3.2 Avoid the potential risks Mon 01/02/2023 Execution Wed 03/02/23 ~ 42 ~ KHANGDV 3.1 Requirement research Wed 03/02/23 Thu 04/02/23 days 3.1.1 Take the survey Wed 03/02/23 Wed 03/02/23 day 3.1.2 Collect user feedback Thu 04/02/23 Thu 04/02/23 day Fri 05/02/23 Tue 09/02/23 days 3.2.1 Requirement analyzing Fri 05/02/23 Fri 05/02/23 day 3.2.2 Data modeling Mon 08/02/23 Mon 08/02/23 day 3.2.3 Data visualization Tue 09/02/213 Tue 09/02/23 day Wed 10/02/2021 Mon 22/02/2023 days Wed 10/02/2023 Tue 16/02/2023 days Wed 10/02/2023 Thu 11/02/203 days 4.1.2 Conduct project change management Fri 12/02/2023 Mon 15/02/2023 days 4.1.3 Conduct project quality management Tue 16/02/2023 Tue 16/02/2023 day Wed 17/02/2023 Mon 22/02/2023 days 4.2.1 Issues and risks log Wed 17/02/2023 Wed 17/02/2023 day 4.2.2 Change request log Thu 18/02/2023 Thu 18/02/2023 day Fri 19/02/2023 Mon 22/02/2023 days Tue 23/02/2023 Thu 11/03/2023 13 days Tue 23/02/2023 Wed 24/02/2023 days 3.2 Requirement analysis Monitor and Control 4.1 Activities 4.1.1 Track and manage KHANGDV project issues and risks 4.2 Deliverables 4.2.3 Status report Close-out 5.1 Handover check ~ 43 ~ KHANGDV lOMoAR cPSD| 17507882 5.2 User documents and user Thu 25/02/2023 training Mon 01/03/2023 days Tue 02/03/2023 Thu 11/03/2023 days 5.3.1 Project data report Tue 02/03/2023 Wed 03/03/2023 days 5.3.2 Research document Thu 04/03/2023 Mon 08/03/2023 days 5.3.3 Application document Tue 09/03/2023 Thu 11/03/2023 days 5.3 Writing report Milestone Date Description Start Finish Initiation Phase At this milestone, I focus on data research Tue 12/01/2023 gathering information about user, and data synchronization Wed 20/01/2023 Planning Phase At this milestone, I will work out a plan for Thu 21/01/2023 each task, break down tasks and allocate a reasonable time for execution In addition, Tue 02/02/2023 ~ 44 ~ will also calculate the cost for the entireproject as well as the contingency cost for certain risks Milestone schedule Task ID Task Name Time ( Days ) A Start B Get Data C Get Measure D Get Material E Prototype F Testing G Adjust Prototype H Final Test I Survey J Finish - Critical Path: Project duration EFH days GHI 10 days BCD days ~ 45 ~ lOMoAR cPSD| 17507882 Task ID Task Name A Start Task Dependency Null B Get Data A C Get Measure A D Get Material A E Prototype B, C, D F Testing E G Adjust Prototype F H Final Test G I Survey H J Finish I ~ 46 ~ ~ 47 ~ lOMoAR cPSD| 17507882 M2 Evaluate the accuracy and reliability of Execution Phase At the implementation milestone, I will delve Wed 03/02/23 into research and analysis of user requirements in using robotic vacuum cleaner by method of survey via google form link Tue 09/02/23 Monitor and Control At this milestone, I will follow and manage Wed 10/02/2023 project issues and risks to ensure the quality of the project Then proceed to write a detailed report on the project, change or add functionality according to customer requirements, etc Mon 22/02/2023 At this stage, we write basic reports of the Tue 23/02/2023 above processes (risks, costs, lessons, reviews, etc.) And finally guide and hand over the product to the customer Thu 11/03/2023 Phase Close-out Phase different research methods applied Different between research methods applied Qualitative research often answers the questions "how",