1. Trang chủ
  2. » Ngoại Ngữ

Agilent infinitylab lc series installation checklist

21 0 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Agilent InfinityLab LC Series Installation Checklist Agilent InfinityLab Installation Checklist LC Series Thank you for purchasing an Agilent instrument solution This checklist is used by the installing engineer to ensure that the instrument and associated systems are correctly installed, upgraded and functioning as designed in your facility This checklist will be completed at the end of the service and provided to you as a record of the installation Customer Information Customers should provide all necessary operating supplies upon request of the engineer Service Engineer’s Responsibilities Only complete/printout sections or pages that relate to the system that has been installed Complete empty fields with the relevant information Complete the relevant checkboxes in the checklist using a “X” or tick mark “ ” in the checkbox Complete Not Applicable check boxes to indicate services not delivered, as needed Complete the Service Review section together with the customer In case of diagnostic tests, record test results in section service review (test results) System Information Guidance:  Check box if instrument configuration report is attached instead of completing the table below Instrument System Name/I.D: Instrument Location: Record the list of system component product numbers below List the serial numbers of the components present in the system below 1 2 3 4 5 6 7 8 9 10 10 Issued: 30-Nov-2017 Revision: 3.2 Copyright: 2017 Select pages for required products Agilent Technologies Agilent InfinityLab LC Series Installation Checklist General Preparation  Unpack/verify the condition and completeness of shipment For discrepancies, use the table below Product/Part Description Observation Action  Discuss any specific questions or issues with the customer prior to starting  Discuss any configuration options with the customer prior to starting  Check for required service note applicability and firmware updates if connecting to      instruments When plumbing the customers system, make sure that the relevant capillary kit and instructions are used If you use the PC or the Instant Pilot for firmware updates, use the correct date/time Check that customer-supplied PC hardware meets minimum requirements e.g Site Preparation Tool http://www.agilent.com/en-us/support/software-informatics/swsitepreptool Upgrades only - Ensure with customer that instrument control settings, data, methods etc have been properly saved or archived prior to starting any installation procedures The installation of ELSD drivers depends upon the customer's choice of software platform If OpenLAB version A.02.01 is installed then ELSD drivers' version 1.2 is installed as part of the installation An UPGRADE to 1.3 will be seen during the new install If a THIRD PARTY software package is used a minimum of ICF A.02.02 is required Agilent Information Center  Install the Agilent Information Center to the PC controlling the system OR If this is not permitted, install the Agilent Information Center to a different PC OR If this is also not permitted, use the installation medium ( Agilent InfinityLab LC Series User Documentation (G4800-64600)) to view the required user documentation  Record the location to which the Agilent Information Center has been installed OR If the Agilent Information Center has not been installed, record that the installation medium has been delivered, and keep it close to the instrumentation for future reference Issued: 30-Nov-2017 Revision: 3.2 Copyright: 2017 Select pages for required products Agilent Technologies Agilent InfinityLab LC Series Installation Checklist G7122A Degasser  Section NOT applicable  Set up the degasser(s)  solvent inlet/outlet  Prime each channel with isopropanol from solvent bottle to pump inlet Issued: 30-Nov-2017 Revision: 3.2 Copyright: 2017 Select pages for required products Agilent Technologies Agilent InfinityLab LC Series Installation Checklist G7120A High Speed Pump, G7104A/C Flexible Pump  Section NOT applicable  Set up the pump  solvent inlet/outlet tubing  waste and seal wash sensor outlet  remote control (if used)  CAN  connect LAN NOTE Agilent LAN connection is made between one (1) of the Agilent Infinity II modules and the Agilent Control Software PC If a detector is installed connect the LAN to this module  fill each channel with Isopropanol from solvent bottle to degassing unit inlet  Prepare the pump  prepare solvents  turn on module  activate Prime  configure the purge  activate the purge  condition the pump, the tuning should be between ±0.2 Issued: 30-Nov-2017 Revision: 3.2 Copyright: 2017 Select pages for required products Agilent Technologies Agilent InfinityLab LC Series Installation Checklist G7110B Isocratic Pump, G7111A Quaternary Pump VL, G7111B Quaternary Pump, G5654A Bio-inert Pump, G7112B Binary Pump  Section NOT applicable  Install optional field upgrade kits for Active Seal Wash (G1398A/G1399A):  Install seal wash pump head parts  Install the seal wash pump motor and peristaltic pump  Install tubing connections for the ASW  After completing the pump installation, run a leak rate test  Set up the pump(s)  solvent inlet/outlet  waste drain  remote control (ERI) (if used)  seal wash tubing (if installed)  CAN  connect LAN NOTE Agilent LAN connection is made between one (1) of the Agilent Infinity II modules and the Agilent Control Software PC If a detector is installed, connect the LAN to this module  Install the solvent cabinet (optional)  Priming the pump  Fill each channel with Isopropanol from solvent bottle to degassing unit inlet  Turn on the pump  Purge each channel for at mL/min  After completing the stack installation, purge the complete system • Monitor the pressure, ripple should be

Ngày đăng: 19/06/2023, 10:13

Xem thêm:

TÀI LIỆU CÙNG NGƯỜI DÙNG

TÀI LIỆU LIÊN QUAN

w