1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

Bsi bs en 62386 204 2009

42 0 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Nội dung

BS EN 62386-204:2009 BSI Standards Publication Digital addressable lighting interface — Part 204: Particular requirements for control gear — Low voltage halogen lamps (device type 3) BRITISH STANDARD BS EN 62386-204:2009 National foreword This British Standard is the UK implementation of EN 62386-204:2009 It is identical to IEC 62386-204:2009 The UK participation in its preparation was entrusted by Technical Committee CPL/34, Lamps and related equipment, to Subcommittee CPL/34/3, Auxiliaries for lamps A list of organizations represented on this committee can be obtained on request to its secretary This publication does not purport to include all the necessary provisions of a contract Users are responsible for its correct application © BSI 2009 ISBN 978 580 57539 ICS 29.130.99; 29.140.50; 29.140.99 Compliance with a British Standard cannot confer immunity from legal obligations This British Standard was published under the authority of the Standards Policy and Strategy Committee on 31 October 2009 Amendments issued since publication Amd No Date Text affected BS EN 62386-204:2009 EN 62386-204 EUROPEAN STANDARD NORME EUROPÉENNE EUROPÄISCHE NORM August 2009 ICS 29.140.50; 29.140.99 English version Digital addressable lighting interface Part 204: Particular requirements for control gear Low voltage halogen lamps (device type 3) (IEC 62386-204:2009) Interface d'éclairage adressable numérique Partie 204: Exigences particulières pour les appareillages de commande Lampes halogène basse tension (dispositif de type 3) (CEI 62386-204:2009) Digital adressierbare Schnittstelle für die Beleuchtung Teil 204: Besondere Anforderungen an Betriebsgeräte Niedervolt-Halogenlampen (Gerätetyp 3) (IEC 62386-204:2009) This European Standard was approved by CENELEC on 2009-07-01 CENELEC members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the Central Secretariat or to any CENELEC member This European Standard exists in three official versions (English, French, German) A version in any other language made by translation under the responsibility of a CENELEC member into its own language and notified to the Central Secretariat has the same status as the official versions CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Cyprus, the Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland and the United Kingdom CENELEC European Committee for Electrotechnical Standardization Comité Européen de Normalisation Electrotechnique Europäisches Komitee für Elektrotechnische Normung Central Secretariat: Avenue Marnix 17, B - 1000 Brussels © 2009 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members Ref No EN 62386-204:2009 E BS EN 62386-204:2009 EN 62386-204:2009 -2- Foreword The text of document 34C/876/FDIS, future edition of IEC 62386-204, prepared by SC 34C, Auxiliaries for lamps, of IEC TC 34, Lamps and related equipment, was submitted to the IEC-CENELEC parallel vote and was approved by CENELEC as EN 62386-204 on 2009-07-01 This Part 204 is intended to be used in conjunction with EN 62386-101 and EN 62386-102, which contain general requirements for the relevant product type (control gear or control devices) The following dates were fixed: – latest date by which the EN has to be implemented at national level by publication of an identical national standard or by endorsement (dop) 2010-04-01 – latest date by which the national standards conflicting with the EN have to be withdrawn (dow) 2012-07-01 Annex ZA has been added by CENELEC Endorsement notice The text of the International Standard IEC 62386-204:2009 was approved by CENELEC as a European Standard without any modification In the official version, for Bibliography, the following notes have to be added for the standards indicated: IEC 60598-1 NOTE Harmonized as EN 60598-1:2008 (modified) IEC 60669-2-1 NOTE Harmonized as EN 60669-2-1:2004 (modified) IEC 60921 NOTE Harmonized as EN 60921:2004 (not modified) IEC 60923 NOTE Harmonized as EN 60923:2005 (not modified) IEC 60925 NOTE Harmonized as EN 60925:1991 (not modified) IEC 60929 NOTE Harmonized as EN 60929:2006 (not modified) IEC 61347-1 NOTE Harmonized as EN 61347-1:2008 (modified) IEC 61347-2-3 NOTE Harmonized as EN 61347-2-3:2001 (not modified) IEC 61547 NOTE Harmonized as EN 61547:2009 (not modified) CISPR 15 NOTE Harmonized as EN 55015:2006 (not modified) -3- BS EN 62386-204:2009 EN 62386-204:2009 Annex ZA (normative) Normative references to international publications with their corresponding European publications The following referenced documents are indispensable for the application of this document For dated references, only the edition cited applies For undated references, the latest edition of the referenced document (including any amendments) applies NOTE When an international publication has been modified by common modifications, indicated by (mod), the relevant EN/HD applies Publication Year Title EN/HD Year IEC 62386-101 2009 Digital addressable lighting interface Part 101: General requirements - System EN 62386-101 2009 IEC 62386-102 2009 Digital addressable lighting interface EN 62386-102 Part 102: General requirements - Control gear 2009 –2– BS EN 62386-204:2009 62386-204  IEC:2009 CONTENTS FOREWORD INTRODUCTION Scope .6 Normative references .6 Terms and definitions .6 General Electrical specifications Interface power supply .7 Transmission protocol structure Timing Method of operation 10 Declaration of variables 11 Definition of commands 12 Test procedures 14 Annex A (informative) Examples of algorithms 35 Bibliography 36 Figure – Application extended configuration command sequence example 10 Figure – Test sequence 'QUERY FEATURES' 15 Figure – Test sequence 'QUERY SHORT CIRCUIT' 16 Figure – Test sequence 'QUERY OPEN CIRCUIT' 17 Figure – Test sequence 'QUERY LOAD DECREASE' 18 Figure – Test sequence 'QUERY LOAD INCREASE' 19 Figure – 'QUERY CURRENT PROTECTOR ACTIVE: Underload' 20 Figure – 'QUERY CURRENT PROTECTOR ACTIVE: Overload' 21 Figure – 'QUERY THERMAL SHUT DOWN' 22 Figure 10 – 'QUERY THERMAL OVERLOAD' 23 Figure 11 – 'REFERENCE SYSTEM POWER' 24 Figure 12 – 'REFERENCE SYSTEM POWER: 100 ms-timeout' 25 Figure 13 – 'REFERENCE SYSTEM POWER: Command in-between' 27 Figure 14 – 'REFERENCE SYSTEM POWER: 15 minutes timer' 27 Figure 15 – 'REFERENCE SYSTEM POWER: failed' 28 Figure 16 – 'ENABLE / DISABLE CURRENT PROTECTOR' 29 Figure 17 – 'ENABLE DEVICE TYPE: Application extended commands' 30 Figure 18 – 'ENABLE DEVICE TYPE: Application extended configuration commands 1' 32 Figure 19 – 'ENABLE DEVICE TYPE: Application extended configuration commands 2' 32 Figure 20 – 'QUERY EXTENDED VERSION NUMBER' 33 Figure 21 – 'RESERVED APPLICATION EXTENDED COMMANDS' 34 Table – Declaration of variables Table – Summary of the application extended command set 14 BS EN 62386-204:2009 62386-204  IEC:2009 –3– INTERNATIONAL ELECTROTECHNICAL COMMISSION DIGITAL ADDRESSABLE LIGHTING INTERFACE – Part 204: Particular requirements for control gear – Low voltage halogen lamps (device type 3) FOREWORD 1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising all national electrotechnical committees (IEC National Committees) The object of IEC is to promote international co-operation on all questions concerning standardization in the electrical and electronic fields To this end and in addition to other activities, IEC publishes International Standards, Technical Specifications, Technical Reports, Publicly Available Specifications (PAS) and Guides (hereafter referred to as “IEC Publication(s)”) Their preparation is entrusted to technical committees; any IEC National Committee interested in the subject dealt with may participate in this preparatory work International, governmental and nongovernmental organizations liaising with the IEC also participate in this preparation IEC collaborates closely with the International Organization for Standardization (ISO) in accordance with conditions determined by agreement between the two organizations 2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international consensus of opinion on the relevant subjects since each technical committee has representation from all interested IEC National Committees 3) IEC Publications have the form of recommendations for international use and are accepted by IEC National Committees in that sense While all reasonable efforts are made to ensure that the technical content of IEC Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any misinterpretation by any end user 4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications transparently to the maximum extent possible in their national and regional publications Any divergence between any IEC Publication and the corresponding national or regional publication shall be clearly indicated in the latter 5) IEC provides no marking procedure to indicate its approval and cannot be rendered responsible for any equipment declared to be in conformity with an IEC Publication 6) All users should ensure that they have the latest edition of this publication 7) No liability shall attach to IEC or its directors, employees, servants or agents including individual experts and members of its technical committees and IEC National Committees for any personal injury, property damage or other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal fees) and expenses arising out of the publication, use of, or reliance upon, this IEC Publication or any other IEC Publications 8) Attention is drawn to the Normative references cited in this publication Use of the referenced publications is indispensable for the correct application of this publication 9) Attention is drawn to the possibility that some of the elements of this IEC Publication may be the subject of patent rights IEC shall not be held responsible for identifying any or all such patent rights International Standard IEC 62386-204 has been prepared by subcommittee 34C: Auxiliaries for lamps, of IEC technical committee 34: Lamps and related equipment The text of this standard is based on the following documents: FDIS Report on voting 34C/876/FDIS 34C/885/RVD Full information on the voting for the approval of this standard can be found in the report on voting indicated in the above table This publication has been drafted in accordance with the ISO/IEC Directives, Part This part 204 is intended to be used in conjunction with IEC 62386-101 and IEC 62386-102, which contain general requirements for the relevant product type (control gear or control devices) –4– BS EN 62386-204:2009 62386-204  IEC:2009 A list of all parts of IEC 62386 series, under the general title Digital addressable lighting interface, can be found on the IEC website The committee has decided that the contents of this publication will remain unchanged until the maintenance result date indicated on the IEC web site under "http://webstore.iec.ch" in the data related to the specific publication At this date, the publication will be • • • • reconfirmed; withdrawn; replaced by a revised edition; or amended BS EN 62386-204:2009 62386-204  IEC:2009 –5– INTRODUCTION This first edition of IEC 62386-204 is published in conjunction with IEC 62386-101 and IEC 62386-102 The division of IEC 62386 into separately published parts provides for ease of future amendments and revisions Additional requirements will be added as and when a need for them is recognised This International Standard, and the other parts that make up IEC 62386-200 series, in referring to any of the clauses of IEC 62386-101 or IEC 62386-102, specifies the extent to which such a clause is applicable and the order in which the tests are to be performed The parts also include additional requirements, as necessary All parts that make up the IEC 62386-200 series are self-contained and therefore not include references to each other Where the requirements of any of the clauses of IEC 62386-101 or IEC 62386-102 are referred to in this International Standard by the sentence " The requirements of IEC 623861XX, clause ’n’ apply”, this sentence is to be interpreted as meaning that all requirements of the clause in question of Part 101 or Part 102 apply, except any which are inapplicable to the specific type of lamp control gear covered by Part 204 All numbers used in this International Standard are decimal numbers unless otherwise noted Hexadecimal numbers are given in the format 0xVV, where VV is the value Binary numbers are given in the format XXXXXXXXb or in the format XXXX XXXX, where X is or 1; "x" in binary numbers means "don't care" –6– BS EN 62386-204:2009 62386-204  IEC:2009 DIGITAL ADDRESSABLE LIGHTING INTERFACE – Part 204: Particular requirements for control gear – Low voltage halogen lamps (device type 3) Scope This International Standard specifies a protocol and methods of test for the control by digital signals of electronic control gear for use on a.c or d.c supplies, associated with low voltage halogen lamps NOTE Tests in this standard are type tests Requirements for testing individual control gear during production are not included Normative references The following referenced documents are indispensable for the application of this document For dated references, only the edition cited applies For undated references, the latest edition of the referenced document (including any amendments) applies IEC 62386-101:2009, Digital addressable lighting interface – Part 101: General requirements – System IEC 62386-102:2009, Digital addressable lighting interface – Part 102: General requirements – Control gear Terms and definitions For the purposes of this document, the terms and definitions given in Clause of IEC 62386101:2009 and Clause of IEC 62386-102:2009 apply, with the following additions 3.1 reference measurement process during which gear determines the actual lamp load with internal procedures and measurements, not specified by this standard NOTE The details of this process are a matter of detailed design of gear and are outside the scope of this standard 3.2 detection of load decrease recognition that the actual lamp load is significantly below the load measured during a successful ‘reference measurement’ NOTE The criteria for regarding a load increase or decrease as significant can only be decided by the manufacturer and these criteria should be described in the manual 3.3 detection of load increase recognition that the actual lamp load is significantly above the load measured during a successful ‘reference measurement’ NOTE The criteria for regarding a load increase or decrease as significant can only be decided by the manufacturer, and these criteria should be described in the manual BS EN 62386-204:2009 62386-204  IEC:2009 – 24 – 12.7.2 Test sequence 'APPLICATION EXTENDED CONFIGURATION COMMANDS' 12.7.2.1 Test sequence 'REFERENCE SYSTEM POWER' Command 224 'REFERENCE SYSTEM POWER' as well as command 249 'QUERY REFERENCE RUNNING' are tested using different device types The test sequence 'REFERENCE SYSTEM POWER' is shown in Figure 11 Test REFERENCE SYSTEM POWER SEND TWICE BROADCAST RESET Reset DUT any reply ? wait (300 ms + Response time) SEND SPECIAL COMMAND TERMINATE No SEND TO DEVICE TYPE BROADCAST QUERY FEATURES Error 7211 "QUERY REFERENCE RUNNING answered when no measurement started" No Terminate all special processes of DUT SEND TWICE TO DEVICE TYPE BROADCAST REFERENCE SYSTEM POWER Test configuration command Feature supported by DUT? SEND TO DEVICE TYPE BROADCAST QUERY REFERENCE RUNNING Test query command bit 2, or of answer set? any reply ? Yes Yes SEND TO DEVICE TYPE BROADCAST QUERY REFERENCE RUNNING Yes Test command SEND SPECIAL COMMAND TERMINATE No Error 7212 "REFERENCE SYSTEM POWER not started" Terminate all special processes of DUT Report: "REFERENCE SYSTEM POWER not supported by DUT" Test done IEC Figure 11 – 'REFERENCE SYSTEM POWER' 649/09 BS EN 62386-204:2009 62386-204  IEC:2009 12.7.2.2 – 25 – Test sequence 'REFERENCE SYSTEM POWER: 100 ms-timeout' In this sequence the reference measurement is tried to be started with the configuration command 224 'REFERENCE SYSTEM POWER' sent twice with a timeout of 150 ms It is also checked if command 256 'TERMINATE' stops the reference measurement The test sequence 'REFERENCE SYSTEM POWER: 100 ms-timeout' is shown in Figure 12 Test REFERENCE SYSTEM POWER: 100ms timeout SEND TWICE BROADCAST RESET SEND BROADCAST REFERENCE SYSTEM POWER Reset DUT wait (300 ms + Response time) SEND SPECIAL COMMAND TERMINATE SEND TO DEVICE TYPE BROADCAST QUERY FEATURES wait 150 ms Terminate all special processes of DUT Feature supported by DUT? wait 150 ms Send command first time Error 7221 "Command executed with timeout" Yes SEND TWICE TO DEVICE TYPE BROADCAST REFERENCE SYSTEM POWER Start measurement SEND SPECIAL COMMAND TERMINATE Terminate measurement process Wait for timeout SEND TO DEVICE TYPE BROADCAST QUERY REFERENCE RUNNING any reply ? Report: "REFERENCE SYSTEM POWER not supported by DUT" Measurement running? No Yes No Wait for timeout SEND TO DEVICE TYPE BROADCAST QUERY REFERENCE RUNNING any reply ? bit 2, or of answer set? SEND TO DEVICE TYPE BROADCAST REFERENCE SYSTEM POWER Send command second time measurement running? Yes Error 7222 "TERMINATE does not stop reference measurement" No Test done IEC Figure 12 – 'REFERENCE SYSTEM POWER: 100 ms-timeout' 650/09 BS EN 62386-204:2009 62386-204  IEC:2009 – 26 – 12.7.2.3 Test sequence 'REFERENCE SYSTEM POWER: Command in-between' In this sequence the reference measurement is tried to be started with commands in-between the two commands 224 'REFERENCE SYSTEM POWER' The two commands 224 and the command in-between are to be sent within 100 ms The test sequence 'REFERENCE SYSTEM POWER: Command in-between' is shown in Figure 13 Test REFERENCE SYSTEM POWER: Command in-between SEND TWICE BROADCAST RESET Reset DUT SEND TWICE BROADCAST ADD TO GROUP No Send command in-between SEND BROADCAST REFERENCE SYSTEM POWER Program SHORT ADDRESS SEND SPECIAL COMMAND TERMINATE Terminate all special processes of DUT Send command second time wait 150 ms Add Converter to GROUP SEND TWICE BROADCAST STORE DTR AS SHORT ADDR SEND TO DEVICE TYPE BROADCAST QUERY FEATURES Send command first time SEND OFF wait (300 ms + Response time) SEND SPECIAL COMMAND DTR (3) SEND TO DEVICE TYPE BROADCAST REFERENCE SYSTEM POWER SEND TO DEVICE TYPE BROADCAST QUERY REFERENCE RUNNING answer = ? Reference measurement started? No Error 7231,i "Command 'REFERENCE SYSTEM POWER' " Yes Feature supported by DUT? SEND BROADCAST QUERY ACTUAL LEVEL bit 2, or of answer set ? answer = ? Yes i := 0; iMAX := Command in-between executed? No Error 7232,i "Command in-between executed" Yes SEND SPECIAL COMMAND TERMINATE Terminate reference measurement SEND BROADCAST RECALL MAX LEVEL wait (Switch-On Time + Response time) i := i + No Report: "REFERENCE SYSTEM POWER not supported by DUT " i > iMAX ? Yes SEND TWICE BROADCAST REMOVE FROM GROUP Remove DUT from group SEND SPECIAL COMMAND DTR (255) SEND TWICE BROADCAST STORE DTR AS SHORT ADDR Delete short address Test done IEC 651/09 BS EN 62386-204:2009 62386-204  IEC:2009 – 27 – i Short Address 'No' 254 executed GROUP 'No' 254 executed BROADCAST 'No' 254 executed Short Address 'Yes' ≠ not executed GROUP 'Yes' ≠ not executed Figure 13 – 'REFERENCE SYSTEM POWER: Command in-between' 12.7.2.4 Test sequence 'REFERENCE SYSTEM POWER: 15 minutes timer' Not later than 15 after receiving command 224 'REFERENCE SYSTEM POWER' the measurement has to be finished and the converter has to return to normal operation The test sequence 'REFERENCE SYSTEM POWER: 15 minutes timer' is shown in Figure 14 Test REFERENCE SYSTEM POWER: 15 minutes timer SEND TWICE BROADCAST RESET Reset DUT wait (300 ms + Response time) SEND SPECIAL COMMAND TERMINATE SEND TO DEVICE TYPE BROADCAST QUERY FEATURES bit 2, or of answer set? SEND TWICE TO DEVICE TYPE BROADCAST REFERENCE SYSTEM POWER SEND TO DEVICE TYPE BROADCAST QUERY REFERENCE RUNNING Terminate all special processes of DUT Start measurement Measurement running? answer = YES ? Feature supported by DUT? No Yes Yes time := No time > 17 No Yes Report: "REFERENCE SYSTEM POWER not supported by DUT" Error 7241: "Measurement not finished after 15 + 10%" SEND SPECIAL COMMAND TERMINATE Report: "Measurement finished after " Terminate all special processes of DUT Test done IEC Figure 14 – 'REFERENCE SYSTEM POWER: 15 minutes timer' 652/09 BS EN 62386-204:2009 62386-204  IEC:2009 – 28 – 12.7.2.5 Test sequence 'REFERENCE SYSTEM POWER: failed' Bit in the answer of command 241 'QUERY FAILURE STATUS' and command 250 'QUERY REFERENCE MEASUREMENT FAILED' is checked The reference measurement is caused to fail by e.g under voltage The way how to cause the measurement to fail shall be stated by the manufacturer of the device under test (DUT) The test sequence 'REFERENCE SYSTEM POWER: failed' is shown in Figure 15 Test REFERENCE SYSTEM POWER: failed SEND TWICE BROADCAST RESET Reset DUT wait (300 ms + Response time) SEND SPECIAL COMMAND TERMINATE Terminate all special processes of DUT SEND TO DEVICE TYPE BROADCAST QUERY FEATURES bit 2, or of answer set ? Feature supported by DUT? No Report: "REFERENCE SYSTEM POWER not supported by DUT " Yes Test done SEND TWICE TO DEVICE TYPE BROADCAST REFERENCE SYSTEM POWER Disturb measurement according to manufacturer Yes Set DUT to normal operation Start measurement Cause reference measurement to fail SEND TO DEVICE TYPE BROADCAST QUERY REFERENCE RUNNING answer = YES ? Measurement running? No Start measurement SEND TO DEVICE TYPE BROADCAST QUERY REFERENCE RUNNING Yes answer = YES ? SEND TWICE TO DEVICE TYPE BROADCAST REFERENCE SYSTEM POWER Measurement running? No SEND TO DEVICE TYPE BROADCAST QUERY FAILURE STATUS answer = 1XXXXXXXb ? Failure status correct? No Error 7251 "QUERY FAILURE STATUS answered wrong with reference measurement failed" Yes SEND TO DEVICE TYPE BROADCAST QUERY FAILURE STATUS answer = 0XXXXXXXb ? Failure status correct? No Error 7253 "QUERY FAILURE STATUS answered wrong with successful measurement" Yes SEND TO DEVICE TYPE BROADCAST QUERY REFERENCE MEASUREMENT FAILED any reply ? No Test Query Error 7252 "QUERY REFERENCE MEASUREMENT FAILED not answered" SEND TO DEVICE TYPE BROADCAST QUERY REFERENCE MEASUREMENT FAILED any reply ? Yes Test Query Error 7254 "QUERY REFERENCE MEASUREMENT FAILED answered after successful measurement" No Yes Test done IEC Figure 15 – 'REFERENCE SYSTEM POWER: failed' 653/09 BS EN 62386-204:2009 62386-204  IEC:2009 12.7.2.6 – 29 – Test sequence 'ENABLE / DISABLE CURRENT PROTECTOR' Command 225 'ENABLE CURRENT PROTECTOR', command 226 'DISABLE CURRENT PROTECTOR and command 251 'QUERY CURRENT PROTECTOR ENABLED' are tested The storage of the configuration in the persistent memory is also tested by this sequence After the reference measurement the current protector is caused to become active with additional load It has to be ensured that the total load is not exceeding the maximum output load of the control gear The test sequence 'ENABLE / DISABLE CURRENT PROTECTOR' is shown in Figure 16 Test REFERENCE SYSTEM POWER: failed SEND TWICE BROADCAST RESET Reset DUT SEND TO DEVICE TYPE BROADCAST QUERY CURRENT PROTECTOR ENABLED wait (300 ms + Response time) any reply ? SEND SPECIAL COMMAND TERMINATE Terminate all special processes of DUT SEND TO DEVICE TYPE BROADCAST QUERY FEATURES bit of answer set ? Yes Report: "Current Protector not supported by DUT " Start measurement wait seconds Wait for failure detection Current protector active? SEND TWICE TO DEVICE TYPE BROADCAST ENABLE CURRENT PROTECTOR Test enable command Interrupt mains supply for seconds Measurement running? No Test persistent memory Wait for restart and failure detection wait seconds answer = YES ? Yes time > 17 ? Yes Error 7261 Reference measurement timeout No Error 7263 "CURRENT PROTECTOR not disabled" No Yes SEND TO DEVICE TYPE BROADCAST QUERY REFERENCE RUNNING Try to activate current protector any reply ? time := Connect additional load SEND BROADCAST QUERY LAMP POWER ON Test done SEND TWICE TO DEVICE TYPE BROADCAST REFERENCE SYSTEM POWER Error 7262 "QUERY CURRENT PROTECTOR ENABLED answered wrong when disabled" Yes No Feature supported by DUT? No Test query command SEND TO DEVICE TYPE BROADCAST QUERY CURRENT PROTECTOR ENABLED any reply ? Test query command Error 7264 "QUERY CURRENT PROTECTOR ENABLED answered wrong when enabled" No No SEND TWICE TO DEVICE TYPE BROADCAST DISABLE CURRENT PROTECTOR Interrupt mains supply for seconds wait seconds Test done Test disable command Test persistent memory Wait for restart and failure detection wait seconds Wait for failure detection SEND BROADCAST QUERY LAMP POWER ON any reply ? Current protector active? Yes Error 7265 "CURRENT PROTECTOR not enabled" No Disconnect additional load Test done IEC Figure 16 – 'ENABLE / DISABLE CURRENT PROTECTOR' 654/09 BS EN 62386-204:2009 62386-204  IEC:2009 – 30 – 12.7.3 Test sequences 'ENABLE DEVICE TYPE' 12.7.3.1 Test sequence 'ENABLE DEVICE TYPE: Application extended commands' An application extended command shall be executed if command 272 'ENABLE DEVICE TYPE 3' precedes If there is a command in-between command 272 and the application extended command, the application extended command has to be ignored except if the command in-between is addressed to another control gear The test sequence uses command 'RECALL MIN LEVEL' as command in-between and command 240 'QUERY FEATURES' as application extended command The test sequence 'ENABLE DEVICE TYPE: Application extended commands' is shown in Figure 17 Test E N A B L E D E V IC E T Y P E : A p p lic a tio n e x te n d e d c o m m a n d s S E N D T W IC E BROADCAST RESET A d d C o n v e rte r to GROUP SEND S P E C IA L C O M M A N D T E R M IN A T E SEND < a d d re s s > R E C A L L M IN L E V E L S e n d o th e r c o m m a n d SEND BROADCAST Q UERY FEATURES S e n d a p p lic a tio n e x te n d e d c o m m a n d answer = < a n s w e r> ? SEND S P E C IA L C O M M A N D D T R (3 ) S E N D T W IC E BROADCAST STORE DTR AS SHO RT A DDR E n a b le d e v ic e ty p e R eset D U T w a it (3 0 m s + R e s p o n s e tim e ) S E N D T W IC E BROADCAST A DD TO G RO UP SEND S P E C IA L C O M M A N D E N A B L E D E V IC E T Y P E E rro r 1 ,i " C o m m a n d 'Q U E R Y FEA TURES' < e rro r te x t > " No Y es P ro g m SHORT ADDRESS w a it R e s p o n s e tim e T e rm in a te a ll s p e c ia l p ro c e s s e s o f D U T SEND BROADCAST Q U ER Y AC TU AL LEVEL SEND BROADCAST QUERY PHM answer = < le v e l> ? i := ; i M A X := O th e r c o m m a n d e x e c u te d ? E rro r ,i " O th e r c o m m a n d < e rro r te x t > " No Y es SEND BROADCAST R EC ALL M AX LEV EL w a it R e s p o n s e tim e No i := i + N e x t te s t i > iM A X ? L a s t te s t d o n e ? Y es S E N D T W IC E BROADCAST REM O VE FRO M G RO UP R e m o v e D U T fro m g ro u p SEND S P E C IA L C O M M A N D D T R (2 5 ) S E N D T W IC E BROADCAST STO RE DTR AS SHO RT ADDR D e le te s h o rt a d d re s s Test done IEC 655/09 i BROADCAST 'No' PHM executed not executed Short Address 'No' PHM executed not executed Short Address XXXXXXXXb 254 not executed executed GROUP 'No' PHM executed not executed GROUP XXXXXXXXb 254 not executed executed Figure 17 – 'ENABLE DEVICE TYPE: Application extended commands' BS EN 62386-204:2009 62386-204  IEC:2009 12.7.3.2 – 31 – Test sequence 'ENABLE DEVICE TYPE: Application extended configuration commands 1' An application extended configuration command shall be executed if command 272 'ENABLE DEVICE TYPE 3' precedes and the application extended configuration command is received twice within 100 ms If there is a command in-between command 272 and the application extended configuration command, the application extended configuration command has to be ignored except if the command in-between is addressed to another control gear and a short address is used The test sequence uses command 'RECALL MIN LEVEL' as command inbetween and command 224 'REFERENCE SYSTEM POWER' as application extended configuration command The test sequence 'ENABLE DEVICE TYPE: Application extended configuration commands 1' is shown in Figure 18 Test ENABLE DEVICE TYPE: Application extended configuration commands SEND TW ICE BRO ADCAST RESET Add Converter to GRO UP SEND SPECIAL COMM AND DTR (3) SEND TW ICE BRO ADCA ST STORE DTR AS S HORT ADDR SEND SPECIAL COMM AND TERMINATE No SEND OFF Send other comm and SEND TW ICE BRO ADCAST REFERENCE SYSTEM POW ER Send application extended configuration command SEND TO DEVICE TYPE BRO ADCAST QUERY REFERENCE RUNNING Com mand executed? answer = ? Program SHORT ADDRESS No Error 7321,i "A pplication extended configuration com m and " Yes Terminate all special processes of DUT wait Response tim e SEND TO DEVICE TYPE BRO ADCA ST QUE RY FEATURE S SEND BROADCAST QUERY ACTUAL LEVEL bit 2, or of answer set ? answer = ? Yes i := 0; iM AX := Enable device type Reset DUT wait (300 m s + Response tim e) SEND TW ICE BRO ADCAST ADD TO GRO UP SEND SPECIAL CO MMAND ENABLE DEVICE TYPE O ther command executed? Error 7322,i "O ther com m and " No Yes Feature supported by DUT? SEND SPECIAL CO MMAND TERM INATE Terminate all special processes of DUT SEND BROADCAST RECALL M AX LEVE L wait (Switch-On Tim e + Response tim e) No i := i + Next test i > iM AX ? Last test done? Yes SE ND TW ICE BRO ADCAST REM OVE FROM GROUP Rem ove DUT from group SEND SPECIAL CO MMAND DTR (255) Report: "REFE RE NCE SYSTEM PO W ER not supported by DUT " SEND TW ICE BRO ADCAST STORE DTR A S SHORT ADDR Delete short address Test done IEC 656/09 BS EN 62386-204:2009 62386-204  IEC:2009 – 32 – i BROADCAST 'No' executed not executed Short Address 'No' executed not executed Short Address 'Yes' ≠ not executed executed GROUP 'No' executed not executed GROUP 'Yes' ≠ not executed executed Figure 18 – 'ENABLE DEVICE TYPE: Application extended configuration commands 1' 12.7.3.3 Test sequence 'ENABLE DEVICE TYPE: Application extended configuration commands 2' An application extended configuration command shall be executed if command 272 'ENABLE DEVICE TYPE 3' precedes and the application extended configuration command is received twice within 100 ms The application extended configuration command has to be ignored if a second command 272' ENABLE DEVICE TYPE' is received in-between the two application extended configuration commands The two application extended configuration commands are to be sent within 100 ms The test sequence 'ENABLE DEVICE TYPE: Application extended configuration commands 2' is shown in Figure 19 Test ENABLE DEVICE TYPE: Application extended configuration commands SEND TWICE BROADCAST RESET SEND SPECIAL COMMAND ENABLE DEVICETYPE Reset DUT wait (300 ms + Response time) SEND SPECIAL COMMAND TERMINATE Enable device type Terminate all special processes of DUT i := 0; iMAX := 254 SEND BROADCAST REFERENCE SYSTEM POWER Send application extended configuration command first time SEND SPECIAL COMMAND ENABLE DEVICETYPE (i) 'Enable' device type again SEND BROADCAST REFERENCE SYSTEM POWER Send application extended configuration command second time SEND TO DEVICE TYPE BROADCAST QUERY REFERENCE RUNNING any reply ? Command executed? Yes Error 7331,i "Application extended configuration command executed" No SEND SPECIAL COMMAND TERMINATE No Terminate all special processes of DUT i := i + Next device type i > iMAX ? Last test done? Yes Test done IEC 657/09 Figure 19 – 'ENABLE DEVICE TYPE: Application extended configuration commands 2' BS EN 62386-204:2009 62386-204  IEC:2009 12.7.6 – 33 – Test sequences for standard application extended commands 12.7.6.1 Test sequences 'QUERY EXTENDED VERSION NUMBER' The command 255 'QUERY EXTENDED VERSION NUMBER' is tested for all possible values of X in command 272 'ENABLE DEVICE TYPE X' The test sequence 'QUERY EXTENDED VERSION NUMBER' is shown in Figure 20 NOTE A control gear belonging to more than one device type will also answer to the query for X not equal to Test QUERY EXTENDED V E R S IO N N U M B E R S E N D T W IC E BROADCAST RESET Reset D U T w a it (3 0 m s + R e s p o n s e tim e ) In itia lis e c o u n te r fo r d e v ic e ty p e i := i M A X := i S E N D T O D E V IC E T Y P E BROADCAST Q U E R Y E X T E N D E D V E R S IO N N U M B E R a n y re p ly ? T e s t c o m m a n d u s in g b ro a d c a s t a d d re s s Yes M essage: "E X T E N D E D V E R S IO N N U M B E R is < a n s w e r> fo r d e v ic e ty p e < i> " Yes E rro r 1 "N o a n s w e r to Q UE RY EXTENDED V E R S IO N N U M B E R " No i = ? No No i := i + N e x t d e v ic e ty p e i > iM A X ? L a s t d e v ic e ty p e Yes Test done IEC Figure 20 – 'QUERY EXTENDED VERSION NUMBER' 658/09 BS EN 62386-204:2009 62386-204  IEC:2009 – 34 – 12.7.6.2 Test sequence 'RESERVED APPLICATION EXTENDED COMMANDS' The following test sequence checks the reaction to reserved application extended commands The control gear shall not react in any way The test sequence 'RESERVED APPLICATION EXTENDED COMMANDS' is shown in Figure 21 Test UNUSEDAPPLICATION EXTENDED COMMANDS SEND TWICE BROADCAST RESET := (227 + k) Set the DUT in reset state SEND TWICE TO DEVICE TYPE BROADCAST wait (300 ms + Response time) SEND BROADCAST QUERY DEVICE TYPE any reply ? Calculate Command Byte Send twice the application extended command preceded by "enable device type 3" ; DUT must not react to this command! Yes Error 7621,k "Answer after receiving APPLICATION EXTENDED COMMAND " No answer = ? k := kmax := 27 Yes No No SEND BROADCAST QUERY RESET STATE Initialise counter for commands answer = 255 ? answer = 'Yes' ? DUT still in reset state? No Yes Error 7622,k "DUT not in reset state after receiving APPLICATION EXTENDED COMMAND " Yes SEND TO DEVICE TYPE BROADCAST QUERY EXTENDED VERSIONNUMBER SEND TWICE BROADCAST RESET Yes wait (300 ms + Response time + Preheat time) any reply ? No k := (k + 1) Increase command counter Continue with command 252? k = 13 ? Yes k := 25 No No Message: "DEVICE TYPE is not 3! Test of APPLICATION EXTENDED COMMANDS not possible with this test sequence!" k > kmax ? Last command ? Yes Test done IEC Figure 21 – 'RESERVED APPLICATION EXTENDED COMMANDS' 659/09 BS EN 62386-204:2009 62386-204  IEC:2009 – 35 – Annex A (informative) Examples of algorithms The requirements of Annex A of IEC 62386-102:2009 apply except as follows: A.3 Address allocation by physical selection Addition: Address allocation by physical selection should only be used if all control gears in the system support this feature Additional clause: A Reference system power measurement a) The control device sends command 224 'REFERENCE SYSTEM POWER’ to start the measurement b) The control gear now measures and stores system power levels using its internal algorithms (The measurement procedure does not take more than 15 min.) c) Meanwhile the control device periodically sends command 249 ‘QUERY REFERENCE RUNNING’ d) When all the control gears shall have finished their measurements and are back in normal operation, the control device no longer receives any replies e) The control device can then use command 250 'QUERY REFERENCE MEASUREMENT FAILED' to check whether the measurement was successful – 36 – BS EN 62386-204:2009 62386-204  IEC:2009 Bibliography [1] IEC 60598-1, Luminaires – Part 1: General requirements and tests [2] IEC 60669-2-1, Switches for household and similar fixed electrical installations – Part 2-1, Particular requirements – Electronic switches [3] IEC 60921, Ballasts for tubular fluorescent lamps – Performance requirements [4] IEC 60923, Auxiliaries for lamps – Ballasts for discharge lamps (excluding tubular fluorescent lamps – Performance requirements [5] IEC 60925, DC-supplied electronic ballasts for tubular fluorescent lamps – Performance requirements [6] IEC 60929, AC-supplied electronic ballasts for tubular fluorescent lamps – Performance requirements [7] IEC 61347-1, Lamp controlgear – Part 1: General and safety requirements [8] IEC 61347-2-3, Lamp controlgear – Part 2-3: Particular requirements for a.c supplied electronic ballasts for fluorescent lamps [9] IEC 61547, Equipment for general lighting purposes – EMC immunity requirements [10] IEC 62034: Automatic test systems for battery powered emergency escape lighting [11] CISPR 15, Limits and methods of measurement of radio disturbance characteristics of electrical lighting and similar equipment [12] GS1, General Specification: Global Trade Item Number, Version 7.0, published by the GS1, Avenue Louise 326; BE-1050 Brussels, Belgium; and GS1, 1009 Lenox Drive, Suite 202, Lawrenceville, New Jersey, 08648 USA _ This page deliberately left blank NO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAW British Standards Institution (BSI) BSI is the national body responsible for preparing British Standards and other standards-related publications, information and services BSI is incorporated by Royal Charter British Standards and other standardization products are published by BSI Standards Limited About us Revisions We bring together business, industry, government, consumers, innovators and others to shape their combined experience and expertise into standards -based solutions Our British Standards and other publications are updated by amendment or revision The knowledge embodied in our standards has been carefully assembled in a dependable format and refined through our open consultation process Organizations of all sizes and across all sectors choose standards to help them achieve their goals Information on standards We can provide you with the knowledge that your organization needs to succeed Find out more about British Standards by visiting our website at bsigroup.com/standards or contacting our Customer Services team or Knowledge Centre Buying standards You can buy and download PDF versions of BSI publications, including British and adopted European and international standards, through our website at bsigroup.com/shop, where hard copies can also be purchased If you need international and foreign standards from other Standards Development Organizations, hard copies can be ordered from our Customer Services team Subscriptions Our range of subscription services are designed to make using standards easier for you For further information on our subscription products go to bsigroup.com/subscriptions With British Standards Online (BSOL) you’ll have instant access to over 55,000 British and adopted European and international standards from your desktop It’s available 24/7 and is refreshed daily so you’ll always be up to date You can keep in touch with standards developments and receive substantial discounts on the purchase price of standards, both in single copy and subscription format, by becoming a BSI Subscribing Member PLUS is an updating service exclusive to BSI Subscribing Members You will automatically receive the latest hard copy of your standards when they’re revised or replaced To find out more about becoming a BSI Subscribing Member and the benefits of membership, please visit bsigroup.com/shop With a Multi-User Network Licence (MUNL) you are able to host standards publications on your intranet Licences can cover as few or as many users as you wish With updates supplied as soon as they’re available, you can be sure your documentation is current For further information, email bsmusales@bsigroup.com BSI Group Headquarters 389 Chiswick High Road London W4 4AL UK We continually improve the quality of our products and services to benefit your business If you find an inaccuracy or ambiguity within a British Standard or other BSI publication please inform the Knowledge Centre Copyright All the data, software and documentation set out in all British Standards and other BSI publications are the property of and copyrighted by BSI, or some person or entity that owns copyright in the information used (such as the international standardization bodies) and has formally licensed such information to BSI for commercial publication and use Except as permitted under the Copyright, Designs and Patents Act 1988 no extract may be reproduced, stored in a retrieval system or transmitted in any form or by any means – electronic, photocopying, recording or otherwise – without prior written permission from BSI Details and advice can be obtained from the Copyright & Licensing Department Useful Contacts: Customer Services Tel: +44 845 086 9001 Email (orders): orders@bsigroup.com Email (enquiries): cservices@bsigroup.com Subscriptions Tel: +44 845 086 9001 Email: subscriptions@bsigroup.com Knowledge Centre Tel: +44 20 8996 7004 Email: knowledgecentre@bsigroup.com Copyright & Licensing Tel: +44 20 8996 7070 Email: copyright@bsigroup.com

Ngày đăng: 15/04/2023, 10:24

TÀI LIỆU CÙNG NGƯỜI DÙNG

TÀI LIỆU LIÊN QUAN