1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

Api publ 1645 2002 (american petroleum institute)

18 0 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 18
Dung lượng 249,67 KB

Nội dung

1645noAppendices text Stage II Vapor Recovery System Operations & System Installation Costs PUBLICATION 1645 FIRST EDITION, AUGUST 2002 Copyright American Petroleum Institute Provided by IHS under lic[.]

Stage II Vapor Recovery System Operations & System Installation Costs PUBLICATION 1645 FIRST EDITION, AUGUST 2002 `,,-`-`,,`,,`,`,,` - Copyright American Petroleum Institute Provided by IHS under license with API No reproduction or networking permitted without license from IHS Not for Resale `,,-`-`,,`,,`,`,,` - Copyright American Petroleum Institute Provided by IHS under license with API No reproduction or networking permitted without license from IHS Not for Resale Stage II Vapor Recovery System Operations & System Installation Costs Downstream Segment PUBLICATION 1645 FIRST EDITION, AUGUST 2002 `,,-`-`,,`,,`,`,,` - Copyright American Petroleum Institute Provided by IHS under license with API No reproduction or networking permitted without license from IHS Not for Resale API publications necessarily address problems of a general nature With respect to particular circumstances, local, state, and federal laws and regulations should be reviewed API is not undertaking to meet the duties of employers, manufacturers, or suppliers to warn and properly train and equip their employees, and others exposed, concerning health and safety risks and precautions, nor undertaking their obligations under local, state, or federal laws Information concerning safety and health risks and proper precautions with respect to particular materials and conditions should be obtained from the employer, the manufacturer or supplier of that material, or the material safety data sheet Nothing contained in any API publication is to be construed as granting any right, by implication or otherwise, for the manufacture, sale, or use of any method, apparatus, or product covered by letters patent Neither should anything contained in the publication be construed as insuring anyone against liability for infringement of letters patent Generally, API standards are reviewed and revised, reafÞrmed, or withdrawn at least every Þve years Sometimes a one-time extension of up to two years will be added to this review cycle This publication will no longer be in effect Þve years after its publication date as an operative API standard or, where an extension has been granted, upon republication Status of the publication can be ascertained from the API Downstream Segment [telephone (202) 682-8000] A catalog of API publications and materials is published annually and updated quarterly by API, 1220 L Street, N.W., Washington, D.C 20005 This document was produced under API standardization procedures that ensure appropriate notiÞcation and participation in the developmental process and is designated as an API standard Questions concerning the interpretation of the content of this standard or comments and questions concerning the procedures under which this standard was developed should be directed in writing to the standardization manager, American Petroleum Institute, 1220 L Street, N.W., Washington, D.C 20005 Requests for permission to reproduce or translate all or any part of the material published herein should also be addressed to the general manager API standards are published to facilitate the broad availability of proven, sound engineering and operating practices These standards are not intended to obviate the need for applying sound engineering judgment regarding when and where these standards should be utilized The formulation and publication of API standards is not intended in any way to inhibit anyone from using any other practices Any manufacturer marking equipment or materials in conformance with the marking requirements of an API standard is solely responsible for complying with all the applicable requirements of that standard API does not represent, warrant, or guarantee that such products in fact conform to the applicable API standard All rights reserved No part of this work may be reproduced, stored in a retrieval system, or transmitted by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission from the publisher Contact the Publisher, API Publishing Services, 1220 L Street, N.W., Washington, D.C 20005 Copyright © 2002 American Petroleum Institute Copyright American Petroleum Institute Provided by IHS under license with API No reproduction or networking permitted without license from IHS Not for Resale `,,-`-`,,`,,`,`,,` - SPECIAL NOTES FOREWORD The objective of this report is to provide general cost information that will be useful in determining the cost impact of proposed air quality regulations The selection of the appropriate vapor recovery system for a speciÞc site requires the careful evaluation of a variety of parameters The report is not intended to compare the feasibility of the various systems or to provide any guidance in the selection of a particular technology The cost data was compiled in 2000 by White Environmental Associates for the American Petroleum Institute API publications may be used by anyone desiring to so Every effort has been made by the Institute to assure the accuracy and reliability of the data contained in them; however, the Institute makes no representation, warranty, or guarantee in connection with this publication and hereby expressly disclaims any liability or responsibility for loss or damage resulting from its use or for the violation of any federal, state, or municipal regulation with which this publication may conßict Suggested revisions are invited and should be submitted to the standardization manager, American Petroleum Institute, 1220 L Street, N.W., Washington, D.C 20005 `,,-`-`,,`,,`,`,,` - iii Copyright American Petroleum Institute Provided by IHS under license with API No reproduction or networking permitted without license from IHS Not for Resale `,,-`-`,,`,,`,`,,` - Copyright American Petroleum Institute Provided by IHS under license with API No reproduction or networking permitted without license from IHS Not for Resale CONTENTS Page EXECUTIVE SUMMARY STAGE II PROGRAM BACKGROUND STAGE II SURVEY ASSUMPTIONS & APPROACH 3.1 Survey Assumptions 3.2 Survey Approach STAGE II DATA COMPILATION AND ANALYSIS 5 CLOSING SUMMARY Table API Stage II Cost Study Survey Data Summary Figures Balance Vapor Recovery System ỊPassive Vacuum AssistĨ Vapor Recovery System Active Vacuum-Assist Vapor Recovery System v `,,-`-`,,`,,`,`,,` - Copyright American Petroleum Institute Provided by IHS under license with API No reproduction or networking permitted without license from IHS Not for Resale `,,-`-`,,`,,`,`,,` - Copyright American Petroleum Institute Provided by IHS under license with API No reproduction or networking permitted without license from IHS Not for Resale Stage II Vapor Recovery System Operations & System Installation Costs Executive Summary and active vacuum assist The Ịvapor balanc system, conÞgured with a corrugated bellows over the nozzle spout designed for capturing vapor, has been in use since vapor recovery was Þrst required The system has been reÞned and upgraded with improving technology A more recent technology initially pioneered in the Midwest is the Òpassive vacuum assistÓ system Initial versions of this system used reciprocal vacuum pumps for each active nozzle powered by the ßow of gasoline to the vehicle fuel tank Subsequent versions of this type of Ịdispenser-basedĨ approach use electrical pumps to return the collected vapor back to the gasoline storage tanks, using electronic signals from the dispenser meters to regulate the vapor pump speed Finally, the Ịactive vacuum assistĨ system has also undergone many improvements since it was Þrst used This system maintains a vacuum on the entire Stage II recovery system and processes the excess vapor collected through a central vapor processor or burner A survey of API members and several other sources of information produced average Stage II installation cost data representing company-speciÞc typical Stage II system conÞgurations for the three targeted vapor recovery system types The collected data was adjusted to conform to a consistent refueling system conÞguration that should not be considered typical for the industry The equipment conÞguration used in this paper were an equalized number of nozzles, hoses, dispensers and refueling positions for all three types of vapor recovery systems evaluated [See Table 1.] Stage II vapor recovery is a well-known air quality control measure that reduces ozone precursors from gasoline dispensing facilities (GDFs) As a result of its relative highvisual proÞle, Stage II vapor controls are sometimes proposed as a part of a regional air quality attainment strategy without adequately comparing its overall cost effectiveness to other available control measures Changes in equipment technology and system testing techniques continue to raise new issues associated with installing, operating and maintaining compliance of Stage II systems The purpose of this Stage II costs study partially comes from the U.S EPAÕs more stringent ozone standard that will bring additional metropolitan areas into non-attainment status These additional metropolitan non-attainment areas may consider Stage II controls as a priority air quality control measure As a further consideration, the U.S EPA has also implemented an on-board refueling vapor recovery (ORVR) requirement for new vehicles It is designed to capture gasoline vapors at the nozzle/vehicle gas tank interface during refueling Adding to the complexity of the matter, the California Air Resources Board (CARB), a nationally-recognized lead agency in the certiÞcation of Stage II equipment and systems, has recently promulgated major changes to the California Stage II vapor control program This is important because many states have linked their Stage II programs to the CARB equipment and system certiÞcation process However, this paper is focused on the current average cost of installing Stage II vapor controls to meet the requirements of pre-EVR CARB approved systems This study considered three different types of retail gasoline outlet (RGO) vapor recovery systems: vapor balance, passive vacuum assist, Stage II Program Background In many major U.S metropolitan areas, Stage II vapor controls are required at gasoline dispensing facilities (GDFs) as a part of an air quality attainment strategy or as part of an air quality maintenance program Table 1—API Stage II Cost Study Survey Data Summarya RetroÞt RetroÞt RetroÞt New New New Active Initial Capital and Expense Costs Passive Vac Balance Active Vac Passive Vac Balance Vac Nozzles/Hoses .Dispensers 12 .6 12 .6 12 .6 12 .6 12 .6 12 .6 Refueling Positions 12 12 12 12 12 12 Design, Engineering and Permitting $2,750 $1,500 $2,750 $4,000 $2,500 $4,000 $16,340 $7,385 $14,640 $19,700 $7,625 $15,000 Equipment (Nozzles/Hoses, Dispensers, Other Ancillary Equipment) $16,750 $12,100 $16,750 $7,400 $4,600 $8,250 Installationb System Test $1,200 $750 $1,200 $1,500 $1,000 $1,500 Totals $37,040 $21,735 $35,340 $32,600 $15,725 $28,750 Note: aCosts not include operational costs such as equipment replacement due to failure, periodic testing, or station shutdown for periodic testing bNot including lost revenues, accelerated depreciation for retroÞt locations `,,-`-`,,`,,`,`,,` - Copyright American Petroleum Institute Provided by IHS under license with API No reproduction or networking permitted without license from IHS Not for Resale API PUBLICATION 1645 `,,-`-`,,`,,`,`,,` - Given the role that gasoline vapors (in the form of volatile organic compounds [VOCs]) play in the formation of ozone, retail gasoline outlets (RGOs) become a high-proÞle target in efforts to attain the ozone standard As an obvious source of VOC emissions, RGOs generally receive high priority for further controls in metropolitan areas that have not met ozone attainment standards The total emissions controlled and the costs associated with the installation and maintenance of Stage II vapor controls are not always adequately compared to other air pollution control strategies, especially those associated with mobile tailpipe emissions (on-road and off-road) that may be less obvious but more cost effective In December 1988, API published the API Survey of Actual Stage II Implementation Costs in the St Louis Metropolitan Area At the time, the average cost of installing Stage II on a per-nozzle basis was $1,660 In the 14 years since the publication was issued, new generations of Stage II equipment with improvements and variations have been introduced and put into service For example, the "vapor balance" system nozzle is now lighter, easier to use and more durable A new type of passive vacuum assist Stage II system has also been developed and has become prevalent Up-to-date average costs associated with installing Stage II vapor recovery systems at typical RGOs are provided in this research Equipment and installation costs for the more commonly used Stage II vapor recovery systems are also identiÞed SigniÞcant effort was made to ensure that the Stage II cost analyses in this research reßect credible, current averages Cost data was derived from a survey of API member companies and interviews with selected Stage II installation and maintenance experts Although information was solicited on all types of vapor recovery systems, information on active vacuum assist systems was not received Other alternative sources were consulted for this information An explanation of how the data was collected, analyzed, and reduced to a presentation of Þndings, is also included in the study Although costs from several different geographical areas were requested for the survey, cost differences between geographical locations did not appear signiÞcant relative to Stage II equipment and installation costs However, at least one respondent noted that the cost of certiÞed/qualiÞed labor is proportional to the distance between a job site and a metropolitan center This report does not address equipment performance or emission reduction rates related to the various equipment capabilities Although collected data was API member-company speciÞc, all data was de-identiÞed before it was compiled and summarized for use in the report The information collected was from RGOs with throughputs ranging from 100,000 gallons per month to 225,000 gallons per month The paper does not intentionally reßect favorably on one Stage II system or equipment manufacturer over another Copyright American Petroleum Institute Provided by IHS under license with API No reproduction or networking permitted without license from IHS Stage II Survey Assumptions & Approach This study was conceived and scoped to address the Ịvapor balanc system and two categories of vacuum-assist systems, Ịactiv and Ịpassive.Ĩ The vapor balance system operates based on the principal of vapor displacement by providing a vapor recovery return line to collect vapors from the vehicle fuel tank pushed out by the incoming liquid gasoline It uses the seal between the vehicle being refueled and the faceplate of the fueling nozzle The vapors then move through a bellows, which surrounds the nozzle, to piping back to the gasoline storage tank Passive vacuum assist systems may be distinguished from active vacuum assist systems by their dispenser-based approach to vapor recovery Passive vac-assist stations use ßow controls at the dispenser to return vapor to the gasoline storage tank, whereas active vac-assist systems use a central vacuum unit to recover vapor from the entire system to the tank, processing excess vapor by incineration or by other means The earliest version of passive vac-assist systems relied on reciprocal pumps within each dispenser housing that inherently varies the speed of vapor recovery based on product ßow through the dispenser The greater the product ßow, the more gasoline vapor is recovered Newer versions use electrical pumps to return recovered vapor to the gasoline tank, where the amount of vacuum generated to recover vapors is based on the gasoline ßow rate detected electronically through the dispenser meter As the basic principal behind the passive vac-assist system is to recover vapors equivalent to those generated during the refueling process, passive vac-assist systems not employ vapor processors For this reason, the ratio of product dispensed to the vapor recovered is important to the effectiveness of the system Consequently, some regulators have placed increased emphasis on A/L testing to ensure that passive vac-assist systems remain within certiÞed 95% effectiveness levels A few agencies demand compliance testing at greater than the annual frequency outlined in the California Air Resources Board (CARB) Executive Orders certifying the passive vacassist systems This more frequent testing increases the annual maintenance costs borne by those operating passive vac-assist equipment A signiÞcant number of Ịactive vacuumĨ processor-type systems are in use These systems differ from the Ịpassive vacuumĨ assist systems chießy in the deployment of a singleunit vacuum generator applying a vacuum to the whole vapor recovery system This application actively removes vapors during gasoline dispensing Because these systems generate excess vapors with the centrally applied vacuum, they either use incinerators or other types of treatment technologies to process the recovered excess vapors Not for Resale STAGE II VAPOR RECOVERY SYSTEM OPERATIONS & SYSTEM INSTALLATION COSTS 3.1 SURVEY ASSUMPTIONS The assumptions used in the development of the survey and the compilation of survey data and other information used to formulate this paper were based on the following descriptions of Stage II vapor control systems 3.1.1 Stage II Vapor Balance System `,,-`-`,,`,,`,`,,` - The vapor balance system is one of the original Stage II control technologies (See Figure 1.) This system uses the natural balance of pressures between the product drawn from the retail gasoline outlet (RGO) storage tank developing a negative pressure, to the positive pressure developed as fuel is dispensed into the vehicle fuel tank without the use of additional motors or pumps The net effect is the ßow of vapor from the vehicle fuel tank back to the RGO storage tank as the fuel is dispensed into the vehicle tank The bellows nozzle is a key and most recognizable element of the balance system The system works when the nozzleÑ with its bellows over the spout with a faceplateÑis snugly placed over the vehicle fuel tank opening, thereby creating a seal The fueling hose is typically coaxial The gasoline ßows through the inner hose while vapors are returned to the underground storage tank (UST) through the outer hose Liquid from condensation or splash back may pool in the lowest part of the outer hose and block the vapor path, thereby defeating the system For this reason, liquid collection tubes or devices are often installed in the hose for continuous removal of this liquid The installation of a pressure/vacuum (P/V) valve on the end of the tank vent pipe has been shown to improve the Òvapor balanceÓ systemÕs ability to contain vapors in the total system 3.1.2 Stage II Passive Vacuum Assist System Of the two types of vacuum-assist vapor recovery, the newest systemÑand one gaining in popularity primarily due to consumer preferenceÑis referred to as a passive vacuum assist system (See Figure 2.) Passive vac-assist systems use a dispenser-based technology to recover vapor from the refueling process In previous versions of the passive vac-assist system, the amount of vapor recovered may be regulated by the use of a reciprocal pump in the dispenser, where the dispensing fuel passes through one section of the pump and generates a vacuum in another section This vacuum pulls gasoline vapor from the vehicle gasoline tank Þll area to the gasoline storage tank on a roughly 1:1 ratio Over the past decade, modiÞcations to the initial concept of the passive vac-assist system have emerged and have proved to be very popular among RGOs nationwide These newer versions typically use electric pumps to return vapor to the gaso- Copyright American Petroleum Institute Provided by IHS under license with API No reproduction or networking permitted without license from IHS line tanks The 1:1 ratio of the vapor recovery process of these newer versions is maintained by regulating the speed of the dispenser-based electric vapor pumps by monitoring the dispensing rate electronically through the dispenser meter To the customer, the passive vacuum assist appears similar in conÞguration to a refueling system without vapor recovery due to its Ịbellow-lessĨ nozzle The nozzle appears conventional but in fact is a spout within a spout (a coaxial spout) The outer spout has a series of small holes located near and around the end through which the vacuum developed by the reciprocating/electric pump in the dispenser draws the dispensed fuel vapors The fueling hose is coaxial, but unlike the Ịvapor balanc system, product ßows through the outer hose while vapors are returned to the UST through the inner hose, making the need for a liquid removal device unnecessary Because this system places a slight pressure on the UST system at all times, a pressure vacuum valve (P/V) is required on the UST vent and vapor check valves must be installed typically at the nozzle, hose or dispenser to prevent the escape of vapor emissions from the system 3.1.3 Stage II Active Vacuum-Assist System Active vacuum assist vapor recovery systems have been an option since Stage II vapor control implementation These vacuum systems are conÞgured with a central vacuum generating unit that pulls a vacuum on all of the vapor lines leading from each nozzle to the tank system with excess vapors going to a central vapor processing unit (See Figure 3.) The central processing unit either uses a burner or other processor to dispense of the excess vapors gathered from the refueling process The Þrst generation Ịactive vacuumĨ nozzles had a short, open-ended bellow conÞguration over the spout through which the centrally generated vacuum draws vapors Current nozzles more closely resemble the coaxial nozzle spouts used by the passive vacuum systems with a coaxial nozzle spout and perforations near the end where fuel is dispensed Because this system places pressure on the UST system at all times, a pressure vacuum valve (P/V) is required on the UST vent and vapor check valves must be installed typically at the nozzle, hose or dispenser to prevent the escape of vapor emissions from the system 3.2 SURVEY APPROACH Under the direction of the API Project Oversight Task Force, a survey form was developed and distributed to designated API members The survey was carefully constructed and instructions drafted to assure simplicity for ease of response and to maximize consistency and accuracy of col- Not for Resale API PUBLICATION 1645 Pressure/ vacuum valve Canopy Liquid removal device inside vapor hose to prevent blockage "Bellows" nozzle Vapor Product Vapor return line Product line Vent line Turbine Underground storage tank Figure 1—Balance Vapor Recovery System Pressure/ vacuum valve Canopy Bootless nozzlecollection holes collect vapors from vehicle Vapor check valve fuel tank location Product Electronic pump controller Vacuum pump Vapor Coaxial hose detail Vapor return line Product line Turbine Underground storage tank Figure 2—“Passive Vacuum Assist” Vapor Recovery System `,,-`-`,,`,,`,`,,` - Copyright American Petroleum Institute Provided by IHS under license with API No reproduction or networking permitted without license from IHS Not for Resale Vent line STAGE II VAPOR RECOVERY SYSTEM OPERATIONS & SYSTEM INSTALLATION COSTS Vapor processor Canopy Bootless nozzlecollection holes collect vapors from vehicle fuel tank Vapor check valve location Pressure/ vacuum valve Excess vapors Flow control valve Collection unit Product Vapor Coaxial hose detail Vapor return line Product line Turbine `,,-`-`,,`,,`,`,,` - Vent line Underground storage tank Figure 3—Active Vacuum-Assist Vapor Recovery System lected data The following Stage II-related information was requested: a b c d e f Design/engineering costs Permit acquisition and fees Equipment prices and shipping costs Installation times and costs Annual operating/maintenance costs Performance and compliance testing times and costs The survey form requested information about each type of Stage II system organized into one of three survey categories Ð balanced, active vacuum or passive vacuum systems There were no survey responses for active vacuum assist systems Installation times and downtimes associated with periodic maintenance related to retroÞtting, concurrent installations, and compliance and performance testing was also incorporated into the survey Some general information was requested regarding the individual survey submittals, including geographic location, average throughput, and number of fueling positions Each survey form also requested whether the installation information was applicable to new, retroÞt or concurrent installations All responses came in as either new or retroÞt In the survey, Copyright American Petroleum Institute Provided by IHS under license with API No reproduction or networking permitted without license from IHS responders could indicate owner/operator responsibilities relative to the installation, repair and maintenance of Stage II equipment and other related matters In addition to collecting the survey forms for compilation and analysis, an interview was conducted with a major Stage II equipment distributor/installer/maintainer and a few individual survey responders The interview with this equipment distributor of Stage II systems obtained historic information from another industry perspective to supplement and further develop a balanced evaluation of Stage II installation and maintenance costs The interviews were also used to assemble information about active vacuum assist systems Stage II Data Compilation and Analysis Survey responses were received by the consultant from API member companies representing eight individual oil companies that were in the process or had just completed the process of merging or establishing alliances with each other Although the survey did not produce any data on active vacuum assist systems, it included interviews and data collection from other sources to address these systems All survey responses were screened for completeness with resolution of Not for Resale API PUBLICATION 1645 noted anomalies The few survey forms that needed follow up, were either incomplete or had contained data that fell outside Ịnormal parametersĨ based on other collected information After the completed survey forms were screened, the compiled data was used to piece together a Stage II system cost table The following separate construction scenarios for balance systems and vacuum-passive systems were considered: a The incremental costs for Stage II installations at new locations, and b The costs of retroÞtting Stage II at facilities without other tangential improvements Equipment and installation related costs were broken down into the following: a Design, engineering & permitting costs b Equipment costs [Average costs that include equipment shipping/freight costs.] c Installation costs d Performance testing costs Closing Summary The initial introduction of Stage II vapor recovery came with fairly straightforward engineering Over 25 years since its Þrst use in California, innovations and reÞnements in system designs and the equipment have become more sophisticated, user friendly, and high-tech with regard to materials and engineering While the magnitude of costs for equipment, installation and maintenance have remained fairly stable over the years, the annual costs associated with equipment inspections, system testing, and compliance continue to escalate For the nozzle/hose and refueling position conÞguration used in this cost study, the costs of retroÞtting Stage II vapor controls range from more than $22,000 for the vapor balance system to $37,000 for vac-assist systems For the same conÞguration, the costs of installing Stage II vapor controls at a new RGO range from $16,000 for the vapor balance system to $33,000 for vac-assist systems In addition to the exercise of evaluating Stage II control cost effectiveness to other alternatives, it is fair to ask the following questions: Is Stage II vapor control a viable and cost-effective air quality control measure for areas newly designated as non-attainment for the ozone standard? Should Stage II vapor controls be implemented in additional metropolitan areas with the increasing population of vehicles that have on-board refueling vapor recovery (ORVR)? `,,-`-`,,`,,`,`,,` - All data from the received survey forms was de-identiÞed and compiled by the consultant onto spreadsheets All expense and time details were included on these initial compilation sheets Each survey entry from each survey was compared to other like entries for ambiguities and/or signiÞcant inconsistencies Suspect data was identiÞed and corrections were qualiÞed The adjusted data on these detailed sheets were then further compiled and summarized into more general categories of more meaningful signiÞcance relative to installation expenses Following the data collection, the compiled results were summarized and sent to API members for additional review and comment API members did not receive any raw data Following the receipt and incorporation of comments, the costs were calculated for a standard conÞguration of 12 nozzles/hoses, dispensers and 12 refueling positions Of a more general nature was the data regarding owner/ operator responsibilities relative to the installation and subsequent maintenance of Stage II facilities The survey also sought data to determine signiÞcant differences in the cost of equipment, installation or maintenance on a geographic basis No signiÞcant differences were found The range of throughputs for the Stage II facilities was from 100,000 to 225,000 gallons per month Copyright American Petroleum Institute Provided by IHS under license with API No reproduction or networking permitted without license from IHS Not for Resale API 2002 Publications Order Form Available through Global Engineering Documents Effective January 1, 2002 American Petroleum Institute Phone Orders: 1-800-854-7179 (Toll-free in the U.S and Canada) 303-397-7956 (Local and International) Fax Orders: 303-397-2740 Online Orders: www.global.ihs.com Date: ❏ API Member (Check if Yes) Invoice To (❏ Check here if same as “Ship To”) Ship To (UPS will not deliver to a P.O Box) Name: Name: Title: Title: Company: Company: Department: Department: Address: Address: City: State/Province: City: State/Province: Zip/Postal Code: Country: Zip/Postal Code: Country: Telephone: Telephone: Fax: Fax: E-Mail: E-Mail: Quantity Product Number Title SO★ Unit Price A16155 RP 1615, Installation of Underground Petroleum Storage Systems $ 86.00 A16135 RP 1631, Interior Lining and Periodic Inspection of Underground Storage Tanks $ 60.00 A16323 RP 1632, Cathodic Protection of Underground Petroleum Storage Tanks and Piping Systems $ 46.00 A16120 RP 1621, Bulk Liquid Stock Control at Retail Pipes $ 57.00 ❏ Payment Enclosed Total Subtotal ❏ P.O No (Enclose Copy) Applicable Sales Tax (see below) ❏ Charge My Global Account No Rush Shipping Fee (see below) ❏ MasterCard ❏ American Express ❏ Diners Club ❏ Discover Shipping and Handling (see below) Credit Card No.: Total (in U.S Dollars) Print Name (As It Appears on Card): ★ Expiration Date: Signature: To be placed on Standing Order for future editions of this publication, place a check mark in the SO column and sign here: Pricing and availability subject to change without notice Mail Orders – Payment by check or money order in U.S dollars is required except for established accounts State and local taxes, $10 processing fee*, and 5% shipping must be added Send mail orders to: API Publications, Global Engineering Documents, 15 Inverness Way East, M/S C303B, Englewood, CO 80112-5776, USA Purchase Orders – Purchase orders are accepted from established accounts Invoice will include actual freight cost, a $10 processing fee*, plus state and local taxes Telephone Orders – If ordering by telephone, a $10 processing fee* and actual freight costs will be added to the order Sales Tax – All U.S purchases must include applicable state and local sales tax Customers claiming tax-exempt status must provide Global with a copy of their exemption certificate Shipping (U.S Orders) – Orders shipped within the U.S are sent via traceable means Most orders are shipped the same day Subscription updates are sent by First-Class Mail Other options, including next-day service, air service, and fax transmission are available at additional cost Call 1-800-854-7179 for more information Shipping (International Orders) – Standard international shipping is by air express courier service Subscription updates are sent by World Mail Normal delivery is 3-4 days from shipping date Rush Shipping Fee – Next Day Delivery orders charge is $20 in addition to the carrier charges Next Day Delivery orders must be placed by 2:00 p.m MST to ensure overnight delivery Returns – All returns must be pre-approved by calling Global’s Customer Service Department at 1-800-624-3974 for information and assistance There may be a 15% restocking fee Special order items, electronic documents, and age-dated materials are non-returnable *Minimum Order – There is a $50 minimum for all orders containing hardcopy documents The $50 minimum applies to the order subtotal including the $10 processing fee, excluding any applicable taxes and freight charges If the total cost of the documents on the order plus the $10 processing fee is less than $50, the processing fee will be increased to bring the order amount up to the $50 minimum This processing fee will be applied before any applicable deposit account, quantity or member discounts have been applied There is no minimum for orders containing only electronically delivered documents Copyright American Petroleum Institute Provided by IHS under license with API No reproduction or networking permitted without license from IHS Not for Resale `,,-`-`,,`,,`,`,,` - ❏ VISA There’s more where this came from • Monogram Licensing Program Phone: 202-962-4791 Fax: 202-682-8070 • American Petroleum Institute Quality Registrar (APIQR) Phone: 202-962-4791 Fax: 202-682-8070 • API Spec Q1 Registration Phone: 202-962-4791 Fax: 202-682-8070 • Perforator System Registration Phone: 202-962-4791 Fax: 202-682-8070 • Inspector Certification Programs Phone: 202-682-8161 Fax: 202-962-4739 • Engine Oil Licensing and Certification System (EOLCS) Phone: 202-682-8233 Fax: 202-962-4739 • Training/Workshops Phone: 202-682-8490 Fax: 202-962-4797 Check out the API Publications, Programs, and Services Catalog online at www.api.org API American Petroleum Institute Copyright American Petroleum Institute Provided by IHS under license with API No reproduction or networking permitted without license from IHS Helping You Get The Job Done Right SM Not for Resale 01.01.02 `,,-`-`,,`,,`,`,,` - The American Petroleum Institute provides additional resources and programs to the oil and natural gas industry which are based on API Standards For more information, contact: `,,-`-`,,`,,`,`,,` - 08/02 Copyright American Petroleum Institute Provided by IHS under license with API No reproduction or networking permitted without license from IHS Not for Resale `,,-`-`,,`,,`,`,,` - Additional copies available from API Publications and Distribution: (202) 682-8375 Information about API Publications, Programs and Services is available on the World Wide Web at: http://www.api.org Order No A16451 Copyright American Petroleum Institute Provided by IHS under license with API No reproduction or networking permitted without license from IHS Not for Resale

Ngày đăng: 13/04/2023, 17:34