1. Trang chủ
  2. » Tất cả

Dem det

7 1 0

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 7
Dung lượng 688,85 KB

Nội dung

PowerPoint Presentation Detention / Demurrage 3 EXPORT DETENTION Starting from the date when empty container(s) has been picked up by shipper from CY (gate out date) to the date when laden container(s[.]

Detention / Demurrage Detention / Demurrage DETENTION Starting from the date when empty container(s) has been picked up by shipper from CY (gate-out date) to the date when laden container(s) has been delivered to CY (gate-in date) DEMURRAGE From the date that is day after the date laden container(s) has been delivered by shipper to the Terminal (gate-in date) until the CY cut-off (Closing time) of the booked vessel DEMURRAGE From the date when laden container(s) has been discharged from vessel to the Terminal until when it’s been picked by consignee (gate-out date) DETENTION From the date when laden container(s) has been picked by consignee (gate-out date) to the date when empty container(s) has been delivered to nominated Depot (gate-in date) EXPORT IMPORT  Whenever Detention / Demurrage period of a shipment exceeds the given free3 time, Detention / Demurrage charge will arise for the exceeded days Detention / Demurrage OUTBOUND Thereafter (USD/ day) (not included VAT 10%) Free Time Dry container Detention Demurrage 05 days 05 days Reefer container Detention Demurrage 05 days 05 days 20’ 40’ – 45’ 10.0 days: 5.0 afterwards: 10.0 20.0 10.0 20.0 10.0 6th -12th days: 5.0 afterwards: 10.0 20.0 10.0 20.0 6th -12th Detention / Demurrage VD: + Ngày 17/10/2013, khách hàng A có lơ hàng book qua “K”Line với thơng tin sau:  VESSEL: COSCO QINGDAO V 094E – ETD: Nov 04, 2013  CY CUT-OFF CÁT LÁI: 22h00 Nov 02, 2013  POD: LONG BEACH, CA,US  PDL: CITY OF INDUSTRY, CA, US (DOOR)  Volume: 03 x 40’DC  “K”Line gửi booking cho khách hàng với số book: KKLUSGN117581 + Khách hàng A đổi lệnh, lấy cont đóng hàng với số cont sau: KKFU1594760 (29/10) / KKFU1231872 (29/10) / KKFU1275361 (31/10) + Ngày 1/11/2013, khách hàng yêu cầu chuyển cont: #2 & #3 sang tàu kế tiếp:  VESSEL: HANJIN BERLIN V 0124E – ETD: Nov 11, 2013  CY CUT-OFF CÁT LÁI: 22h00 Nov 09, 2013 KKFU1275361 KKFU1231872 KKLUSGN118505 + Ngày 6/11/2013, khách hàng hạ (gate-in full) cont Cát Lái, chờ xuất tàu Detention / Demurrage VD: + Ngày 7/11/2013, “K”Line thuyết phục khách hàng chuyển cont sang tàu in-direct ngày 13/11/2013 tàu direct ngày 11/11/2013 tải:  1ST VESSEL: AYUTTHAYA BRIDGE V A293N– ETD: Nov 13, 2013  2ND VESSEL: MOL EXPERIENCE V 039E  CY CUT-OFF CÁT LÁI: 23h59 Nov 12, 2013 => Khách hàng A đồng ý Detention / Demurrage VD: Sau tàu chạy, tổng chi phí DET + DEM khách hàng A phải trả sau: AMOUNT (USD) CONT No DATE OUT EMPTY DATE IN FULL BKNo SIZE DEST KKFU1231872 29-10-13 06-11-13 118505 40’DC TYO 80 + 10 = 90 KKFU1275361 31-10-13 06-11-13 118505 40’DC TYO 40 + 10 = 50 DET DEM Tổng cộng: 140 USD Nếu bạn khách hàng A, bạn giải ??? ... EXPORT IMPORT  Whenever Detention / Demurrage period of a shipment exceeds the given free3 time, Detention / Demurrage charge will arise for the exceeded days Detention / Demurrage OUTBOUND Thereafter...Detention / Demurrage Detention / Demurrage DETENTION Starting from the date when empty container(s) has been picked up... Thereafter (USD/ day) (not included VAT 10%) Free Time Dry container Detention Demurrage 05 days 05 days Reefer container Detention Demurrage 05 days 05 days 20’ 40’ – 45’ 10.0 days: 5.0 afterwards:

Ngày đăng: 27/02/2023, 10:42