A comparable project is defined as having a construction cost at the bid date of at least $ 1,000,000 or a total of $4,000,000 for the projects submitted, and the following example pipeline installations:
Trenched and horizontal directional drilled pressurized water pipeline and valve installation and testing; piping connections to existing water lines; deep boring pits; deep vault construction/installation;
Such projects should have possessed the following construction challenges:
Urban site work with limited construction and staging areas
Site conditions requiring proactive and innovative solutions to mitigate construction impacts such as noise, dust, vehicular and pedestrian traffic while campus is occupied and research is ongoing
Project complexity requiring tracking of multiple locations
Complex phasing plan development and execution
Such projects should include these specific components:
Horizontal directional drilled pressure piping
Construction of underground utilities adjacent to existing in-service underground utilities