Phase Parts Total Copyright 2006 by Carnegie Mellon University Postmortem System Test Build and Integration Unit Test Code Inspection Compile Code Review Code Inspection Detailed Design Test Development Detailed Design Review Name Team Part/Level Detailed Design HLD Inspection Integration Test Plan High-level Design Inspection Requirements System Test Plan Requirements Planning Strategy and TSPi Forms and Instructions TSPi Development Time Summary - Form SUMT Plan Assembly Actual Date Instructor Cycle TSPi Forms and Instructions TSPi Development Time Summary Instructions - Form SUMT Purpose General When Using the TSPi Tool When not Using the TSPi Tool Header Plan/Assembly/ Actual Phase Parts Columns Total - This form summarizes the data for the development time spent in each phase for the parts of an assembly - Note, the number of rows in this form is variable, depending on the number of parts in the assembly - If you are using the TSPi tool, these data are automatically obtained from the part time logs and SUMP forms and rolled up to the next level SUMP form If you are not using the TSPi tool, use a copy of this form to summarize the time data for the parts of each assembly - Obtain time data from the part time logs or SUMP forms - Enter the totals from the SUMT form in the SUMP form for the high-level assembly - Enter your name, date, team name, and instructor's name - Name the part or assembly and its level - Enter the cycle number Check whether this form is for plan, assembly, or actual data - Plan: In system-level planning, use SUMT to summarize the estimated times for each phase of each assembly's parts - Assembly: Use a separate SUMT form to summarize the estimated time data for the parts of each assembly - Actual: Use a separate SUMT form to summarize the actual time data for the parts of each assembly - The phases of the development process are listed across the top of the form - List the name or number of each module, component, product, or subsystem part in the left column - Under each phase heading, enter, for each part, the plan or actual time for that development phase - At the bottom of the form, enter the total development time for all parts in that phase Copyright 2006 by Carnegie Mellon University .. .TSPi Forms and Instructions TSPi Development Time Summary Instructions - Form SUMT Purpose General When Using the TSPi Tool When not Using the TSPi Tool Header Plan/Assembly/... this form to summarize the time data for the parts of each assembly - Obtain time data from the part time logs or SUMP forms - Enter the totals from the SUMT form in the SUMP form for the high-level... assembly - Actual: Use a separate SUMT form to summarize the actual time data for the parts of each assembly - The phases of the development process are listed across the top of the form - List