Tài liệu Case Study - Cisco Metro - HongKong Broadband Network ppt

Tài liệu Case Study - Cisco Metro - HongKong Broadband Network ppt

Tài liệu Case Study - Cisco Metro - HongKong Broadband Network ppt

... all of HKBN’s requirements, Cisco proposed a Metro Ethernet Switching Solution. Comprising over 10,000 Cisco Catalyst Switches and over 800 Cisco Routers, the Cisco Metro Ethernet Solution enabled ... content provision and e-commerce are de-emphasised. Instead, the Group embarked on building a telecommunications infrastructure based on a state-of-the-art Internet Protocol network...
Ngày tải lên : 16/01/2014, 21:20
  • 4
  • 173
  • 0
Tài liệu Case Study - Cisco Metro - HongKong Broadband Network doc

Tài liệu Case Study - Cisco Metro - HongKong Broadband Network doc

... Catalyst CCDA, CCDP, CCIE, CCNA, CCNP, Cisco Certified Internetwork Expert logo, Cisco IOS, the Cisco IOS logo, Cisco Press, Cisco Systems, Cisco Systems Capital, the Cisco Systems logo, Empowering the ... on the Cisco. com Web site at www .cisco. com/go/offices. Corporate Headquarters Cisco Systems, Inc. 170 West Tasman Drive San Jose, CA 9513 4-1 706 USA www .cisco. com T...
Ngày tải lên : 16/01/2014, 21:20
  • 4
  • 212
  • 0
Tài liệu Case Study - WFX WiFi - Florida State University pptx

Tài liệu Case Study - WFX WiFi - Florida State University pptx

... telecommunications-related services and systems on campus, including 2,500 CATV outlets, 13,000 local phone lines, and a CISCO/ FOUNDRY-powered gigabit and 10-gigabit core network. “We don’t ... Wi-Fi Array for high-capacity wireless coverage. RESULTS Sustainable and better performing cabling infrastructure, simplified Wi-Fi deployment, and continued support for reliability, cost-sa...
Ngày tải lên : 20/12/2013, 22:15
  • 4
  • 311
  • 0
Tài liệu Case study - CopperTen - Syncroness chose ADC KRONE pptx

Tài liệu Case study - CopperTen - Syncroness chose ADC KRONE pptx

... Toll Free: 1-8 0 0-3 6 6-3 891 • Outside of North America: + 1-9 5 2-9 3 8-8 080 Fax: + 1-9 5 2-9 1 7-3 237 • For a listing of ADC’s global sales office locations, please refer to our web site. CASE STUDY SYNCHRONICITY Like ... TODAY – AND TOMORROW CopperTen re-establishes copper as the better- priced solution for “future-proofing” Local Area Networks for the next proto...
Ngày tải lên : 16/01/2014, 21:20
  • 4
  • 207
  • 0
Tài liệu Case Study - Loy yang B Power Station pptx

Tài liệu Case Study - Loy yang B Power Station pptx

... - 0.9 0.33 - 0.64 22 - 20 150V • Terminator 1.5 Modules 0.65 - 1.4 0.34 - 1.5 22 - 16 500V • Terminator 2.5 Modules 1.2 - 1.8 1.0 - 2.5 16 - 14 500V • Terminator Interface Modules (in) 0.65 - ... Modules 0.4 - 0.8 0.12 - 0.5 26 - 21 150V • Profil Series 2 Modules 0.65 - 0.9 0.33 - 0.64 22 - 20 150V (Instrumentation Modules) • Pro...
Ngày tải lên : 24/01/2014, 03:20
  • 6
  • 266
  • 0
Tài liệu Case Study - Loy yang B Power Station ppt

Tài liệu Case Study - Loy yang B Power Station ppt

... 00 8-0 0 6864 2664 Side Mounting Label Holders 6462 3 11 8-0 0 6992 2704 Pair Commoning Module 6462 2 01 4-0 0 128 40 Backmount Stand-Offs 6460 3 00 4-0 1 512 160 27 Way Backmount Frames 6455 2 03 4-0 1 ... Using KRONE Achieved by Using KRONE Equipment: Equipment: Short-term: Short-term: AUD $370,000 AUD $370,000 Long-term: $$$ Long-term: $$$ Wire wrap Time Savings 7% 41% Screw ty...
Ngày tải lên : 24/01/2014, 03:20
  • 6
  • 219
  • 0
Tài liệu Case study - PBE - Utah University pptx

Tài liệu Case study - PBE - Utah University pptx

... Toll Free: 1-8 0 0-3 6 6-3 891 • Outside of North America: + 1-9 5 2-9 3 8-8 080 Fax: + 1-9 5 2-9 1 7-3 237 • For a listing of ADC’s global sales office locations, please refer to our web site. CASE STUDY MEETING ... we finished the evaluation it was the best end-to-end cabling solution for all of our criteria. The new Engineering Building was our very first all-TrueNet...
Ngày tải lên : 09/12/2013, 16:15
  • 4
  • 391
  • 0
Tài liệu Case Study - PBE - Utah State University pdf

Tài liệu Case Study - PBE - Utah State University pdf

... be re-wired at any time. To return it to its original status, the patch cord is simply removed — instantly returning the circuit to its original setting. This system is ideal for end-of-semester ... with lecture hall facilities wired for instant network access by all students and faculty. To complicate the issue, the university has a large distance-learning program that makes up 28% of enro...
Ngày tải lên : 09/12/2013, 16:15
  • 4
  • 327
  • 0