Máy xúc lất HuynDai HL760 - P5 3

Máy xúc lất HuynDai HL760 - P5.3

Máy xúc lất HuynDai HL760 - P5.3

... tachometer is accurate enough for test work. 2. TEST TOOLS2. TEST TOOLSCLAMP-ON ELECTRONIC TACHOMET-CLAMP-ON ELECTRONIC TACHOMET-ER INSTALLATIONER INSTALLATIONService equipment and toolsTachometer ... cloth and connect to a straight section of injec-tion line within 100 mm (4in) of pump. Finger tighten only-do not over tighten. B : Black clip (-) . Connect to main frame. C : Red clip (+). ....

Ngày tải lên: 25/10/2012, 11:19

7 371 7
Máy xúc lất HuynDai HL760 - P4.3

Máy xúc lất HuynDai HL760 - P4.3

... PARKING BRAKE SYSTEM on the page 4-2 1.Adjust nut75794BS1775794BS1875794BS22Item Standard valveParking brakeperformanceKeep machine on 20%(11˚20') gradient(1)(2) 4-3 7Air breatherABreather ventBreather ... 4-3 6 GROUP 3 TESTS AND ADJUSTMENTSGROUP 3 TESTS AND ADJUSTMENTS1. PARKING BRAKE PERFORMANCE1. PARKING

Ngày tải lên: 25/10/2012, 11:19

2 287 8
Máy xúc lất HuynDai HL760 - P5.1

Máy xúc lất HuynDai HL760 - P5.1

... Function -- -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- 5-1 Group 2 Operational Checks and Troubleshooting -- -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- ... 5-1 5Group 3 Tests and Adjustments -- -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -...

Ngày tải lên: 25/10/2012, 11:19

15 406 10
Máy xúc lất HuynDai HL760 - P5.2

Máy xúc lất HuynDai HL760 - P5.2

... or shop. 5-2 2Problem Cause RemedyHeavy kick-back in steer-Heavy kick-back in steer-ing wheel in both direc-ing wheel in both direc-tions.tions.Wrong setting of cardan shaft and gear-wheel set.Correct ... steering sys-Vibration in steering sys-tem or hoses jumptem or hoses jumpHigh priority valve setting. Do priority valve pressure test.Neutral position of steer-Neutral position of steer-i...

Ngày tải lên: 25/10/2012, 11:19

8 386 7
Máy xúc lất HuynDai HL760 - P5.4

Máy xúc lất HuynDai HL760 - P5.4

... (22.4) -3 /8 BSP.F 6.1 (44.1) 2.0 (14.5)5.1 (36.9) -1 /2 BSP.F 10.2 (73.8) 3.1 (22.4)8.2 (59.3) -7 /1 6-2 0 UNF - 2.0 (14.5 )-- 3/ 4-1 6 UNF - 6.1 (44.1 )-- M 12×1.5 4.1 (29.7) 2.0 (14.5)3.1 (22.4) 2.0 (14.5)M ... spacer if fitted) off the unit. Take out the two O-rings.(3)Remove cardan shaft.(4)(78 0-3 A) 5-7 2(1)(78 0-3 A) 5-7 2(2)(78 0-3 A) 5-7 2(3)(78...

Ngày tải lên: 25/10/2012, 11:19

30 295 6
Máy xúc lất HuynDai HL760 - Chapter 3

Máy xúc lất HuynDai HL760 - Chapter 3

... "complete" message is shown. Then angle sensor calibration is finished after selecting . -- -- - ①②③④⑤⑥display A 7-3 5Boom pressure calibrationBoom pressure calibrationIt is used when bucket weight is ... can be set maximum 2 days.Default password : 00000Default password : 00000· -- -- 7 5793CD26C75793CD26DInterval setting- If set interval setting to 5 minutes, ESL system is...

Ngày tải lên: 27/10/2012, 08:17

32 631 4
Máy xúc lất HuynDai HL760 - P1

Máy xúc lất HuynDai HL760 - P1

... -- -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - 6-1 Group 2 Operational Checks and Troubleshooting -- -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - ... -- -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - 6-4 2Group 3...

Ngày tải lên: 25/10/2012, 10:50

42 653 18
Máy xúc lất HuynDai HL760 - P2

Máy xúc lất HuynDai HL760 - P2

... adjustments 6-4 3※ Hydraulic oil must be at operating temperature for these checks (refer to page 6-5 7).Item Description Service actionHydraulic system warm-up Hydraulic system warm-up procedureprocedureRun ... steering valve) high pressure check at page 5-2 8.IF OKIF OKDo steering system leakage check at page 5-2 9.IF OKIF OKDo main hydraulic pump flow test at page 6-5 8.Control...

Ngày tải lên: 25/10/2012, 10:50

11 576 11
Máy xúc lất HuynDai HL760 - P3

Máy xúc lất HuynDai HL760 - P3

... bucket is below the leveler position.1)1)(1)(1)(2(2)(3(3)75794OP28 6-5 63. TEST TOOLS3. TEST TOOLSCLAMP-ON ELECTRONIC TACHOMETERCLAMP-ON ELECTRONIC TACHOMETER INSTALLATIONINSTALLATION·Service equipment ... valve.··1)2)3)※4)5)9. BOOM AND BUCKET CYLINDER LEAKAGE TEST9. BOOM AND BUCKET CYLINDER LEAKAGE TEST(77 0-3 ATM) 6-5 6 6-6 4SPECIFICATIONSPECIFICATIONOil temperature 45±5˚C (113±9˚...

Ngày tải lên: 25/10/2012, 10:50

15 508 9
Máy xúc lất HuynDai HL760 - P4

Máy xúc lất HuynDai HL760 - P4

... screw2327524106,31161233525181520252230177 1-1 1-2 254533776096WE11 6-6 9LOADER LOADER (2/2)2327526,311612332444281520252230177411128 1-2 1-1 4376096WE12 1 Rotary group 1-1 High speed rotary group 1-2 Control plate 2 Adjusting ... valve.(10)75796WE63(9) 6-8 22. MAIN CONTROL VALVE2. MAIN CONTROL VALVESTRUCTURE STRUCTURE (1/2) 1)1)6162603836383735797433313332797986717416579858...

Ngày tải lên: 25/10/2012, 10:50

24 411 6
w