... now seeing a decline in number but an increase in scale for each member Joint- Venture Bank, foreign bank branches: Joint- Venture Banks and 27 foreign bank branches are in operation in Vietnam ... However, VPBank is opposing increasing competition of Joint Stock competitors in order to exist and development Moreover, I have been working in VPBank, one of the first...
Ngày tải lên: 26/11/2013, 20:57
... CAPABILITY OF MARKET RISK MANAGEMENT AT VIETNAM JOINT STOCK COMMERCIAL BANK FOR INDUSTRY AND TRADE 3.1 Development orientation of Vietnam Joint Stock Commercial Bank For Industry And Trade 3.1.1 ... AND TRADE 2.1 Overview of Vietnam Joint Stock Commercial Bank for Industry and Trade (Vietinbank) 2.1.1 Establishment and...
Ngày tải lên: 18/07/2014, 15:41
Efficient Identity-Based Key Management for Configurable Hierarchical Cloud Computing Environment
... an efficient identity-based key management for configurable hierarchical cloud computing environment The proposed scheme has better performance and fewer communication cost compared to other hierarchical ... Hongwei Li et al [5] proposed an identity-based hierarchical model for cloud computing (IBHMCC) In their scheme, the cloud computing environment is c...
Ngày tải lên: 31/07/2013, 09:44
Privacy preserving digital identity management for cloud computing
... trail of personal information that, if not properly protected, may be misused Therefore, the development of digital identity management (IdM for short) systems suitable for cloud computing is crucial ... address the problem of privacy- preserving management of digital identity attributes in domains with heterogeneous name spaces, we propose a privacy- preserving mult...
Ngày tải lên: 31/07/2013, 09:45
Platform Capability Based Identity Management for Scalable and Secure Cloud Service Access
... the right platform Such a model may become increasingly useful for other cloud services and usages such as geo location services supported by platform based information regarding the platform location, ... platform capability based information denoted by platform identity has a low user touch and a well controlled methodology for issuance, usage, update and revoc...
Ngày tải lên: 31/07/2013, 09:45
Methane cracking over commercial carbons for hydrogen production
... among all the five carbons tested The initial methane conversion (50% for AC1, 45% for AC2 and 51% for AC3) and initial methane cracking rates (0.6mmol/min.g for AC1, 0.55mmol/min.g for AC2 and 0.623mmol/min.g ... methane cracking rate (R0) ……………………… (7) It may be noticed from Figures and that the initial methane conversions (14.5% for CB; 5% for SAF) and initial...
Ngày tải lên: 05/09/2013, 15:28
Workflow Management for the Grid
... multi-sited Grid resources 7.5 WORKFLOW MANAGEMENT FOR THE GRID 327 The user portal in GridFlow provides a GUI to facilitate the composition of workflow elements and the access to additional services Grid ... information related to the workflow • The information pull paradigm originated with the network and information management fields, where the requirement for...
Ngày tải lên: 19/10/2013, 03:20
Project Management for Construction Chapter 1
... York, 19 79 Back to top 25 1. 11 Footnotes The Business Roundtable, More Construction for the Money, Summary Report of the Construction Industry Cost Effectiveness Project, January 19 83, p 11 Back ... of new construction Figure 1- 6: Value of New Construction in the United States, 19 75 -19 95 19 Figure 1- 7: Construction as Percentage of Gross Domestic Product in the U...
Ngày tải lên: 24/10/2013, 08:15
Project Management for Construction Chapter 2
... Standard," Project Management Journal, Vol 17, No 3, August l986, pp l5 -24 Back See L C Stuckenbruck, "Project Management Framework," Project Management Journal, Vol 17, No 3, August 1986, pp 25 -30 ... met Project human resource management to development and effectively employ project personnel Project communications management to ensure effective internal and external...
Ngày tải lên: 24/10/2013, 08:15
Project Management for Construction Chapter 3
... motivation 3. 13 Pre -Project Planning Even before design and construction processes begin, there is a stage of "pre -project planning" that can be critical for project success In this process, the project ... the project life cycle That is why professional construction management or integrated design /construction are often preferred by private owners 3. 10 Construction...
Ngày tải lên: 28/10/2013, 15:15
Project Management for Construction Chapter 4
... • • A = 41 7 for holidays and strikes B = 1 ,41 5 for absentees (i.e vacation, sick time, etc.) C = 1, 141 for temporary stoppage (i.e weather, waiting, union activities, etc.) D = 1 ,43 1 for indirect ... problems of freight delivery for very large projects Example 4- 5: Freight delivery for the Alaska Pipeline Project [7] 92 The freight delivery system for the Alaska pipel...
Ngày tải lên: 28/10/2013, 15:15
Project Management for Construction Chapter 5
... $50 ,400 4,400 33 ,50 0 $88,300 $7 ,56 0 $57 ,960 660 5, 060 5, 0 25 38 ,52 5 $13,2 45 $101 ,54 5 Allocated overhead cost Total cost Gi Li $2,319 202 1 ,54 1 $4,062 $60,279 5, 262 40,066 $1 05, 607 Example 5- 10: A standard ... V For example, for V = 50 0,300 ESAL and A = years, the annual cost of routine maintenance per lanemile is estimated to be: C = 59 6 + (0.0019) (50 0,300)...
Ngày tải lên: 07/11/2013, 09:15
Tài liệu Water quality management for irrigation in the mekong river delta, Vietnam doc
... epidemics, increase in the early rain season and the end of flooding periods due to stagnant water in the sunken places WATER QUALITY MONITORING The water quality monitoring data and information ... the along the river and canal banks, resulting a high concentration of human pollutants along the water bodies in the Delta Fig.1: The Mekong River Basin...
Ngày tải lên: 09/12/2013, 22:15