... constructing the Brabazon aircraft, the largest aircraft in the world at the time The building's clear height (23m) was determined by the height of the Brabazon tailfin and its clear internal span, ... The client embarked on a significant construction contract, comprising the removal of the existing heating system, including the steam pipework installation, asbestos insulation and heaters In ... MANAGEMENT The indoor climate control system was divided according to the minimum module size A single air-handling unit serves each module and is located at high level within the structural depth of the...