Project Planning Control 4 Episode 2 pdf

Project Planning Control 4 E Part 3 ppt

Project Planning Control 4 E Part 3 ppt

... separate sheet records the date the revised document is sent to each recipient and the date of acknowledgement of receipt. Where changes have been made to one or more pages of a multi-page document, ... client Date of Meeting : Subject of Meeting : Minute Number : ٗ Client’s telex Date of Telex : Reference : Signed by : ٗ✕ Client’s letter Date of Letter : 10.12.1992 Reference : SGP 3 641 S...
Ngày tải lên : 11/08/2014, 23:23
  • 30
  • 255
  • 0
Project Planning Control 4 E Part 4 pot

Project Planning Control 4 E Part 4 pot

... organized into disciplines or work areas and eliminates the need to enter reference numbers into the nodes. Instead the grid reference numbers (or letters) can be fed into the computer. The grid ... title can be written and the node need be no larger than a few millimetres in diameter – if the coordinate method is used. The difference (or similarity) between an arrow diagram and a precedence...
Ngày tải lên : 11/08/2014, 23:23
  • 30
  • 154
  • 0
Project Planning Control 4 E Part 5 pptx

Project Planning Control 4 E Part 5 pptx

... TE E + TE B + D =TL E – TE E i .e. as the latest time of the end event minus the earliest time of the end event. It is, therefore, the same as the end slack. Independent float The difference between ... 14 – 11 – 1=2 110 Figure 15. 5 Figure 15. 6 Beginning event Earliest time TE B Earliest time TE E Latest time TL B Latest time TL E End event Beginning slack End slack Interfereing...
Ngày tải lên : 11/08/2014, 23:23
  • 30
  • 151
  • 0
Project Planning Control 4 E Part 7 ppt

Project Planning Control 4 E Part 7 ppt

... produce and operate integrated project management systems. By using the various regular inputs generated by the different operating departments, these systems can, on demand, give the project manager ... report Perhaps the best evidence that networks are most effective when kept simple is given by the NEDO report referred to in the Preface to the first edition of this book. The relevant p...
Ngày tải lên : 11/08/2014, 23:23
  • 30
  • 288
  • 0
Project Planning Control 4 E Part 8 pps

Project Planning Control 4 E Part 8 pps

... basis in Week 0. The second pump was scheduled for delivery in week 4. In the event, both pumps were delivered together in week 4. The client argued that since there was a float of 4 days on ... histogram (e) = cumulative ‘S’ curve 333333555555555533333366 645 5553322 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 86...
Ngày tải lên : 11/08/2014, 23:23
  • 30
  • 162
  • 0
Project Planning Control 4 E Part 9 docx

Project Planning Control 4 E Part 9 docx

... 4 7 Erect duct A Erect duct B 3 6 Erect frame A Erect beams B 2 5 Erect frame 2 Erect frame 3 1 Erect frame 1 7 7 3 3 4 4 4 2 4 Erect duct A Erect duct B 1 3 Erect frames 1, 2 & beams A Erect ... hours curve dipping below the budget hour line. The percentage-time curves in Figure 27.10 enable the project manager to compare actual percentage complete with planned percentage compl...
Ngày tải lên : 11/08/2014, 23:23
  • 30
  • 126
  • 0
Project Planning Control 4 E Part 10 ppsx

Project Planning Control 4 E Part 10 ppsx

... – even retrospectively. It can be seen in Table 28.6 that 1 Materials have to be ordered 4 weeks before use. 2 Materials have to be delivered 1 week before use. 3 Materials are paid for 4 weeks ... after delivery. 4 Labour is paid in week of use. 5 Measurements are made 3 weeks after use. 6 Payment is made 1 week after measurement. The next step is to tabulate the labour costs and mater...
Ngày tải lên : 11/08/2014, 23:23
  • 30
  • 181
  • 0
Project Planning Control 4 E Part 11 doc

Project Planning Control 4 E Part 11 doc

... 40 49 – – + + 3563 5 Days 6 7 8 910 11 12 13 14 15 5 6 7 8 9 10 11 12 13 15 14 Substantive 28 74 42 84 3165 47 16 33 64 5 011 3 641 542 4 3826 930 930 1 511 Costs 5700 3926 5850 39 34 5863 40 35 6013 42 45 6326 44 55 1083 1083 25 94 4756 3 548 6 640 313 3 14 Week 10 Figure 28.16 Example of integration ... and techniques Once the decision has been made to proceed with...
Ngày tải lên : 12/08/2014, 00:20
  • 30
  • 180
  • 0
Project Planning Control 4 E Part 12 ppsx

Project Planning Control 4 E Part 12 ppsx

... resource requirements and availabilities for the project. Adding resources to the project Project resources can cover a wide range of different commodities and these are often applied quite differently ... in the past week (or whatever the project reporting period is) giving the actual manhours expended, and the manager’s assessment of % complete at the end of the period. As values are...
Ngày tải lên : 12/08/2014, 00:20
  • 30
  • 179
  • 0
Project Planning Control 4 E Part 13 pps

Project Planning Control 4 E Part 13 pps

... times, hours per day and hours per week to be entered and set as the default calender using the ‘Create New Base Calender’ dialog box (see Figure 31 .4) . Resource calendars, based on the ‘Base ... Total Quality Management General TOR Terms of Reference General VA Value Analysis General VE Value Engineering General VM Value Management General WBS Work Breakdown Structure PM See also list of ....
Ngày tải lên : 12/08/2014, 00:20
  • 30
  • 197
  • 0
Project Planning Control 4 E Part 14 pps

Project Planning Control 4 E Part 14 pps

... strategy. Schedule See Programme. Schedule Performance Index The ratio of earned value cost (or time) and the planned cost (or time). Schedule variance The arithmetical difference between the earned ... 12 Percent/time curve, 237 Percentage complete, 83, 220, 221, 2 24, 226, 237, 244 , 245 , 248 , 249 , 252, 2 54 Performance bound project, 3 Personal computer (PC), 129, 195 PERT, 159, 344...
Ngày tải lên : 12/08/2014, 00:20
  • 16
  • 176
  • 0
Project Planning Control 4 Episode 2 pdf

Project Planning Control 4 Episode 2 pdf

... 0.7938 4 000 3 175 .20 5 000 3 969.00 4 1/1.08 4 = 0.7350 4 000 2 940 .00 5 000 3 675.00 5 1/1.08 5 = 0.6806 2 000 1 361 .20 2 000 1 361 .20 6 1/1.08 6 = 0.63 02 2 000 1 26 0 .40 2 000 1 26 0 .40 Total 24 ... 1 & 2 = £ 12 000 2 £5000 for years 1, 2, 3 & 4 = 20 000 40 00 for years 2 & 3 = £8 000 20 00 for years 5 & 6 = 4 000 20 00 for years 5...
Ngày tải lên : 13/08/2014, 16:21
  • 30
  • 247
  • 0