Mechanical Estimating Manual Episode 16 potx
... Deluxe 304 Mechanical Estimating Manual Implement STAR as a Standard Procedure STAR can be implemented over and over. You will continually fi nd more and more unnecessary costs built into mechanical ... information is available on the Wendes Systems, Inc. web site: www.wendes.com. 288 Mechanical Estimating Manual • Profi ts pay taxes to the government A business cannot survi...
Ngày tải lên: 13/08/2014, 09:21
Mechanical Estimating Manual Episode 1 potx
... WinPipe estimating systems. This manual gives an overall perspective and detailed understanding of the estimating systems and contractors can switch from manual estimating using this manual ... budget estimating, cost control, cost accounting, checking change orders, etc. The Mechanical Estimating Manual covers: • The principles of successful estimating and contract...
Ngày tải lên: 13/08/2014, 09:21
Mechanical Estimating Manual Episode 8 potx
... allowance included. 132 Mechanical Estimating Manual Example Per Piece Takeoff and Extension Listing Duct Sizes and Lengths Per Piece Duct Takeoff Sheet 136 Mechanical Estimating Manual USING MULTIPLIERS ... 8.37 ——————————————————————————————————————————— 138 Mechanical Estimating Manual Measuring Ductwork for Pounds Per Hour Pricing Equivalent Lengths Pounds Per Hour Fabri...
Ngày tải lên: 13/08/2014, 09:21
Mechanical Estimating Manual Episode 10 potx
... 184 Mechanical Estimating Manual Smyth Lighting Fixture Plant Sample Estimate Open Surface Tank Exhaust System Heavy Gauge Ductwork 185 Estimate Summary and Extension Sheet 168 Mechanical Estimating ... Labor productivity rate average 16 sq ft/hr. Budget Figures typical mix, average size $13.10/sq ft. 170 Mechanical Estimating Manual Round Black Iron Ductwork 16 Gauge, An...
Ngày tải lên: 13/08/2014, 09:21
Mechanical Estimating Manual Episode 2 pot
... Flue ❒ Breeching ❒ Factory Fabricated Stack 16 Mechanical Estimating Manual Scope of Complete Sheet Metal Estimate Check-off List 12 Mechanical Estimating Manual List everything on the summary sheet, ... left blank 8 Mechanical Estimating Manual HOW TO ESTIMATE LABOR ACCURATELY AND REALISTICALLY There are a number of sources and techniques for deriving sound labor fi gu...
Ngày tải lên: 13/08/2014, 09:21
Mechanical Estimating Manual Episode 3 docx
... 1.112 $146.28 $190 .16 ————————————————————————————— Direct labor costs are $39.00 per hour. 30 Mechanical Estimating Manual Bid Recap and Markup Sheet 40 Mechanical Estimating Manual Installed ... materials, hangers, scrap hardware. Labor rate $39.00 per hour. 32 Mechanical Estimating Manual Telephone Quotation Budget Estimating 45 Budget Estimating Copper Tubing Insta...
Ngày tải lên: 13/08/2014, 09:21
Mechanical Estimating Manual Episode 4 doc
... 1 10.0 251.60 Screw, hp 0.65 277 360 1 10.0 140.60 Screw 0.65 166 216 1-1/4 16. 0 287.12 Screw, hp 0.77 317 412 1-1/4 16. 0 173 .16 Screw 0.77 203 264 1-1/2 25.0 340.40 Screw, hp 0.83 373 485 ... 2,892 ———————————————————————— 2. Manual fractional horsepower starter with overload heaters $20.20 3. Manual starter I to 10 HP, overload, start-stop buttons, HOA $85.47 64 Mechanical...
Ngày tải lên: 13/08/2014, 09:21
Mechanical Estimating Manual Episode 5 pdf
... 15 64 11,458 516 30 12,628 16, 417 25 119 18,567 502 40 20,127 26 ,165 30 163 26,714 602 44 28,430 36,959 40 193 29,533 499 50 31,483 40,928 PACKAGE UNIT, AIR TO AIR 2 6.5 $1, 616 $546 5 $1,811 ... 17,675 20 8,000 87 17,268 863 2 .16 12 17,736 23,057 25 10,000 100 21,199 848 2.12 12 21,667 28 ,168 30 12,000 - 125 $24,980 $833 $2.08 16 $25,604 $33,285 40 16, 000 150 32,686...
Ngày tải lên: 13/08/2014, 09:21
Mechanical Estimating Manual Episode 6 pps
... 90 Mechanical Estimating Manual Estimating Registers Return Air Registers, Fixed 450 Vanes, Opposed Blade Dampers, ... 8,152 12 58 10,360 11.4 10,805 14,046 —————————————————————————————————————— 16 74 16, 280 17.5 16, 963 22,051 20 90 25 ,160 21.0 25,979 33,773 24 106 37,000 25.5 37,995 49,393 28 127 47,360 32.0 ... causing the particles to fall away by gravity. Four basic t...
Ngày tải lên: 13/08/2014, 09:21
Mechanical Estimating Manual Episode 7 pot
... .125 2x2x1/8 1.73 1.65 .58 2x2x3 /16 2.56 2.44 .85 2x2x1/4 3.35 3.19 1.11 2-1/2x2-1/2x3 /16 3.07 1.07 2-1/2x2-1/2x1/4 4.31 4.10 1.40 116 Mechanical Estimating Manual 44 lbs/hr divided into 1 ... estimators 126 Mechanical Estimating Manual Floors Bsmt, Ground, 1st 1.00 2nd & 3rd 1.04 4th, 5th, 6th 1.08 7th, 8th, 9th 1.12 10th, 11th, 12th 1 .16 13th, 14th, 15th 1.21 16...
Ngày tải lên: 13/08/2014, 09:21