... criteria for design and construction and air conditioning equipment; and other process but do not address the physical routing of piping. equipment not associated with the liquid process of a. Computer ... Materials 10-4 10-3 Wear and Galling Resistance Chart of Material Combinations 10-5 EM 1110-1-4008 5 May 1999 US Army Corps of Engineers ENGINEERING AND DESI...
Ngày tải lên: 27/06/2014, 08:20
... finalize the system operational pressures design temperature of the pipe and components shall be and temperatures. Up to this point, the system operating taken as the fluid temperature. system, it is ... the piping material and the operating fluid. The sustained maximum system operating pressure is the basis for the design pressure. The design temperature is the liquid tempera...
Ngày tải lên: 27/06/2014, 17:20
Errata Sheet No. 1 Engineering and Design Liquid Process Piping EM potx
... 1- 2 1- 1 References 1- 3 1- 1 Distribution 1- 4 1- 1 Scope 1- 5 1- 1 Metrics 1- 6 1- 1 Brand Names 1- 7 1- 1 Accompanying Guidance Stainless Steel 4-9 4 -18 Specification 1- 8 1- 1 Manual Organization 1- 9 1- 3 Chapter ... 15 0 (5.906) 16 0 (6.299) 8 8.625 200 (7.874) 225 (8.858) 10 10 .75 250 (9.843) 280 (11 .024) 12 12 .75 300 (11 . 81) 315 (12 .402) 14 14 .00 350...
Ngày tải lên: 27/06/2014, 17:20
Teaching About Evolution and the Nature of Science - NAP (2004) Episode 1 ppsx
... Teachers 7 ã 11 ã CHAPTER 2 Major Themes in Evolution Dialogue: Teaching About the Nature of Science 22 ã 27 ã CHAPTER 3 Evolution and the Nature of Science Dialogue: Teaching Evolution Through ... other pow- erful theories besides evolution. Cell theory says that all living things are composed of Teaching About Evolution and the Nature of Sci...
Ngày tải lên: 12/08/2014, 08:21
Liquid Process Piping Episode 1 ppsx
... Prevention 11 -6 11 -7 Static Mixers 11 -7 11 -8 Expansion Joints 11 -8 11 -9 Piping Insulation 11 -9 11 -10 Heat Tracing 11 -10 11 -12 Corrosion Protection 12 -1 12 -1 Cathodic Protection 12 -2 12 -1 Isolation ... Schedule 10 -4 10 -20 Chapter 11 Ancillary Equipment Flexible Couplings 11 -1 11- 1 Air and Vacuum Relief 11 -2 11 -1 Drains 11 -3 11 -5 Sample Ports...
Ngày tải lên: 12/08/2014, 16:20
Liquid Process Piping Episode 3 ppsx
... 119EF) 35 through 38 , 59, sliding 41, 43 through 46, rollers 39 , 40 insulation protection C-1. Cold Systems 3, 4, 26, clamps 1 to 15EC 1, 5, 7, 9, 10, hangers (33 to 59EF) 36 through 38 , 59, ... bolt stress at ambient temperature, a 23) AWWA C110, p. 44. 12 ASME Section VIII, pp. 32 7 -33 3. 13 t NOM ' 13 . 4 mm 1.0 & 0.125 ' 15 .3 mm (0.6 03 in) t m ' P...
Ngày tải lên: 12/08/2014, 16:20
Liquid Process Piping Episode 5 pdf
... (5. 5) 1 .52 (5. 0) 200 (8) 3. 35 (11.0) 3.20 (10 .5) 3. 05 (10.0) 2.74 (9.0) 1.83 (6.0) 1.68 (5. 5) 250 (10) 3 .51 (11 .5) 3. 35 (11.0) 3.20 (10 .5) 2.90 (9 .5) 1.98 (6 .5) 1.83 (6.0) 300 (12) 3.81 (12 .5) ... 1.07 (3 .5) 80 (3) 2.44 (8.0) 2.44 (8.0) 2.29 (7 .5) 2.13 (7.0) 1.37 (4 .5) 1.22 (4.0) 100 (4) 2 59 (8 .5) 2 59 (8 .5) 2 59 (8 .5) 2.29 (7 .5) 1 .52 (5. 0) 1.37 (4 .5) 150 (6...
Ngày tải lên: 12/08/2014, 16:20
Liquid Process Piping Episode 6 ppsx
... (60 ) 75 (55) 50 (2) 4 16 (5/8) 61 (45) 149 (110) 169 (125) 102 (75) 65 (2ẵ) 4 16 (5/8) 75 (55) 169 (125) N.A. N.A. 80 (3) 4 16 (5/8) 95 (70) 169 (125) 169 (125) 149 (110) 100 (4) 8 16 (5/8) 68 ... 3. 96 m (13 ft) 4.88 m ( 16 ft) 6. 10 m (20 ft) 7.32 m (24 ft) 8.23 m (27 ft) 114.3 (4.500) 3 .66 m (12 ft) 4.88 m ( 16 ft) 6. 10 m (20 ft) 7 .62 m (25 ft) 9.14 m (30 ft) 10.4 m (34 ft)...
Ngày tải lên: 12/08/2014, 16:20
Liquid Process Piping Episode 7 doc
... 0.85 0 .7 8,3 87 (13) Wing guided Either 0.9 0 .7 9,032 (14) - Rotary Eccentric Spherical plug Open 0.85 1.0 7, 742 (12) Close 0.68 1.0 8 ,71 0 (13.5) Angle Contoured plug Open 0.9 1.0 10,968 ( 17) Close ... (Bar) PureGum 3000 (2 07) 400 (28) 600 (41) 3500 (241) 3000 (2 07) 300 (21) 200-450 (14-31) 4000 ( 276 ) Reinforced 4500 (310) 3000 (2 07) 4000 ( 276 ) 3500 (241) 3000 (2 07) 1...
Ngày tải lên: 12/08/2014, 16:20
Liquid Process Piping Episode 8 potx
... Stainless Steel - 185 EC to 81 5EC (-300EF to 1,500EF) 321 Stainless Steel - 185 EC to 81 5EC (-300EF to 1,500EF) 347 Stainless Steel - 185 EC to 81 5EC (-300EF to 1,500EF) Aluminum -198EC to 204EC (-325EF ... 7/16 2 7 /8 3 1-5/16 4 1-3/4 5 2-3/16 6 2-5 /8 7 3-1/16 8 3-1/2 9 3-15/16 10 4-3 /8 Source: ADSCO Manufacturing LLC, Expansion Joints Cat. 1196 EM 1110-1-40 08 5 May 99 A-3 AS...
Ngày tải lên: 12/08/2014, 16:20
Liquid Process Piping Episode 9 pps
... C 98 (210) 298 (570) 98 (210) 398 (570) 398 (570) 32 (90 ) 98 (210) Inconel U 298 (570) 32 (90 ) 26 (80) 32 (90 ) 32 (90 ) 98 (210) Monel 98 (210) 298 (570) U U U U 98 (210) Nickel 98 (210) 32 (90 ) ... 98 (210) 98 (210) Monel 204 (400) 98 (210) 98 (210) 98 (210) 98 (210) 98 (210) 98 (210) Nickel U 98 (210) 98 (210) 98 (210) 98 (210) 98 (210) 98 (210) 304 SS 49 (120) 1 4...
Ngày tải lên: 12/08/2014, 16:20
Liquid Process Piping Episode 10 pot
... 98 ( 210) 98 ( 210) 98 ( 210) 65 (150) 65 (150) Inconel 93 (200) 98 ( 210) 98 ( 210) 98 ( 210) 98 ( 210) Monel 98 ( 210) 98 ( 210) 98 ( 210) 98 ( 210) 98 ( 210) Nickel 98 ( 210) 98 ( 210) 98 ( 210) 98 ( 210) ... ( 210) Inconel 98 ( 210) 98 ( 210) 98 ( 210) 98 ( 210) 149 (300) 98 ( 210) Monel 65 (150) 98 ( 210) 98 ( 210) 98 ( 210) 98 ( 210) 176 (350) 176 (350) Nickel 98 ( 210) 98 ( 210) 98...
Ngày tải lên: 12/08/2014, 16:20
Liquid Process Piping Episode 11 ppsx
... 1.33 (110 MPa) ' 146 MPa S E # S A ; and S A ' f [1.25 (S c % S h ) & S L ] S A ' 1.0[(1.25) (110 MPa %110 MPa)&7 MPa] ' 268 MPa; therefore, S E # 268 MPa EM 111 0-1-4008 5 ... through the piping. The worst case pressure drop will be run A-H due to the additional pipe length. Ref. p. 3-8. Ref. p. 3-8. EM 111 0-1-4008 5 May 99 C-25 Sketch C-7 Sketch C-8 EM 111...
Ngày tải lên: 12/08/2014, 16:20
Liquid Process Piping Episode 13 pptx
... 8:3 thermoset piping and fittings, 7:1-7; 8:3 vents and drains, 3:29 wall thickness, 2:6-7; 3:5, 14-17; 7:4 P&IDs see Piping and instrumentation diagrams Piping components, 2:1-2, 6; 3:2-3,19 Piping ... devices, 11:5-7 for double containment piping, 8:7 for pneumatic testing, 3:30 Pressure wave, 3:5-7 Probe leak detection system, 8:8 Process control, 2:1-2, 4 Process flow dia...
Ngày tải lên: 12/08/2014, 16:20