INDUSTRIAL VENTILATION Episode 1 pps
... CHAPTER 1 INTRODUCTION 1- 1 SCOPE 1- 1 1- 2 PURPOSE OF CRITERIA 1- 1 1- 3 SPECIFIC PROCESSES 1- 1 CHAPTER 2 GENERAL REQUIREMENTS 2 -1 GENERAL CRITERIA 2 -1 2-2 COORDINATION 2 -1 2-3 DESIGN ... Handbook 10 03 /17 C, dated February 19 96. UFC 3- 410 -04N 25 October 2004 3 -1 FUNCTION 3 -1 3-2 OPERATIONAL CONSIDERATIONS 3 -1 3-2 .1 Airborne Contaminat...
Ngày tải lên: 12/08/2014, 16:20
INDUSTRIAL VENTILATION Episode 3 pdf
... (200) 38 (1.5) 38 (1.5) 38 (1.5) 51 (2.0) 51 (2.0) 38 (1.5) 38 (1.5) 38 (1.5) 38 (1.5) 38 (1.5) 38 (1.5) 51 (2.0) Adapted from: Hoffman Air and Filtration Systems, “Design of Industrial ... further details. 3- 5.8.1 Heating and Air Conditioning. If necessary, provide heating and cooling according to MIL-HDBK-10 03/ 3. 3- 7 UFC 3- 410-04N 25 October 2004 TABLE...
Ngày tải lên: 12/08/2014, 16:20
INDUSTRIAL VENTILATION Episode 4 potx
... 4- 2 UFC 3 -41 0-04N 25 October 20 04 Figure 4- 4. MK -46 workbench hood. Figure 4- 5. MK -46 parts washer hood. 4- 4 UFC 3 -41 0-04N 25 October 20 04 c. Install an automatic ... floor. 4- 9 UFC 3 -41 0-04N 25 October 20 04 Figure 4- 1. Layout for the MK -46 fuel/defuel and afterbody breakdown room. Figure 4- 2. Series of hood in the...
Ngày tải lên: 12/08/2014, 16:20
INDUSTRIAL VENTILATION Episode 5 pdf
... standard mesh, or 5- 7 UFC 3-410-04N 25 October 2004 Figure 5- 4. Spray up booth. Figure 5- 5. Ventilated sink. 5- 5 UFC 3-410-04N 25 October 2004 Table 5- 1. Recommended ... (vapors) Workbench (Figure 5- 2) 0 .51 m/s (100) 1 Lay up (Vapors) Workbench/Floor Exhaust (Figure 5- 3) 0 .51 m/s (100) 1 Spray up (Vapors) Spray up Booth (Figure 5- 4) 0...
Ngày tải lên: 12/08/2014, 16:20
INDUSTRIAL VENTILATION Episode 7 pot
... cell, at 77 degrees F (25 degrees C), will pass 0.24 amperes of charging current for every 100 ampere-hour cell capacity, measured at the 8-hour rate, when subject to an equalizing potential ... Chapter. 9-3.1 Walk-in Spray Paint Booths. The ventilation system for a walk-in booth is mainly to prevent fire and explosion. A well-designed ventilation system will also 9-1 UFC 3-410...
Ngày tải lên: 12/08/2014, 16:20
INDUSTRIAL VENTILATION Episode 8 pdf
... accordance with MIL-HDBK- 10 28/ 1, Aircraft Maintenance Facilities and the specific ventilation system design requirements in this Chapter. 10-3.1 Exhaust Air System. The ventilation system for ... Size each plenum take-off for no more than 2.44 m (8 ft) of plenum width (W). Size the exhaust plenum for a maximum plenum velocity of 5. 08 m/s (1,000 fpm). Size the replacement air...
Ngày tải lên: 12/08/2014, 16:20
INDUSTRIAL VENTILATION Episode 9 ppsx
... Operation 29 CFR 191 0.107, Spray Finishing Using Flammable and Combustible Materials 29 CFR 191 0.134, Respiratory Protection 29 CFR 191 0.1000, Air Contaminants 29 CFR 191 0.1001, Asbestos, ... Hueneme, CA 93 043-4370 Commercial:(805) 98 2- 498 4, DSN: 551- 498 4, FAX:(805) 98 2-14 09 Internet: paulsonkm@nfesc.navy.mil Web Page: http://www.nfesc.navy.mil/enviro/...
Ngày tải lên: 12/08/2014, 16:20
INDUSTRIAL VENTILATION Episode 10 ppsx
... Command (NAVFAC) assigned the NAVOSH Air Branch of NFESC to revise Military Handbook 100 3/17, Industrial Ventilation Systems. The handbook defines engineering design criteria for use by all ... of the aircraft farthest from the exhaust filter bank. Paint spray criteria in the ACGIH Industrial Ventilation Manual permits airflow in large spaces as low as 50 cubic feet per minute p...
Ngày tải lên: 12/08/2014, 16:20
... ASTM D 82 2 describes a standard procedure for operating light- and water-expo- sure apparatus (carbon-arc type) for testing coatings. ASTM G 53 and DIN 53 384 describe similar standard ... onshore and at sea). These coatings have excellent resistance to oil, solvents, and mechanical impact, and are therefore used on drilling stations, oil rigs, and ships. Since zinc...
Ngày tải lên: 12/08/2014, 16:21
Passive Sampling Techniques Episode 8 pdf
... L 1 ) HCB 1 13 79 2 0. 085 0.14 g-HCH 1 .8 1695 27 0.130 182 p,p 0 -DDE o1 132 8 0.069 0.03 PCB 28 1 16 62 7 0.077 0.05 PCB 52 o1 43 6 0.072 0.02 PCB 101 o1 27 12 0.065 0.004 PCB 1 38 o1 33 5 0.062 0.003 PCB ... 0.002 PCB 180 o1 8 10 0.064 0.001 Acenaphthylene 4 45 124 11 0.107 2.16 Acenaphthene 10 10 1172 3 0.102 12.2 Fluorene 18 9 11 28 4 0.100 9.76 Anthracene 8 30 1494 9 0.094...
Ngày tải lên: 12/08/2014, 16:21
Remote_Sensing Episode 8 pdf
... 6-7 EM 1110-2-2907 1 October 2003 (2) The average precipitation was calculated to be 8. 28 cm/year. These data, coupled with the image data, established the inundation frequency to be ... values equaled 0.69 in this study, well within the 0.6 to 0 .8 range that describes the class designation to be “very good” (≥ 0 .8 is “excel- lent”). For this study, KHAT indicated good vege...
Ngày tải lên: 12/08/2014, 16:21
NOISE AND VIBRATION CONTROL Episode 8 pdf
... feet. 8- 12 TM 5 -80 5-4/AFJMAN 32-1090 Table 8- 7. Vibration Isolation Mounting for Boilers. 8- 15 TM 5 -80 5-4/AFJMAN 32-1090 Table 8- 12. Vibration Isolation Mounting for Transformers. 8- 20 TM 5 -80 5-4/AFJMAN ... building and will give very satisfac- tory results acoustically. 8- 11 TM 5 -80 5-4/AFJMAN 32-1090 Table 8- 8. Vibration Isolation Mounting for Propeller-Type...
Ngày tải lên: 13/08/2014, 05:22
Improving Machinery Reliability 3 Episode 8 pdf
... ussm S 7.111 s 1 .81 8 5 2.m t 2.545 s 5 ,33 3 S 2.667 t 1.600 E 7,967 S 2.175 S 2.4 78 s 2.9 98 s 5.975 t 3. 025 S 1.715 5600 s364 t 520 It 1 28 I 23, 076 IS 16,600 ... 02222 8 100 5 1 78 Shaft 22 00455 10 100 t 45 Impeller 16 00625 8 100 5 50 Housing 22 00455 14 100 s 64 PumpBeanngs 6 01667 8 100 t 133 Motom 12...
Ngày tải lên: 13/08/2014, 09:20