... organized into disciplines or work areas and eliminates the need to enter reference numbers into the nodes. Instead the grid reference numbers (or letters) can be fed into the computer. The grid ... title can be written and the node need be no larger than a few millimetres in diameter – if the coordinate method is used. The difference (or similarity) between an arrow diagram and a precedence...
Ngày tải lên: 11/08/2014, 23:23
... separate sheet records the date the revised document is sent to each recipient and the date of acknowledgement of receipt. Where changes have been made to one or more pages of a multi-page document, ... client Date of Meeting : Subject of Meeting : Minute Number : ٗ Client’s telex Date of Telex : Reference : Signed by : ٗ✕ Client’s letter Date of Letter : 10.12.1992 Reference : SGP 3 641 Sig...
Ngày tải lên: 11/08/2014, 23:23
... TE E + TE B + D =TL E – TE E i .e. as the latest time of the end event minus the earliest time of the end event. It is, therefore, the same as the end slack. Independent float The difference between ... where several meet at one event, i .e. if x activities meet at a node, it is possible that x–1 of these have free float. This free float may be defined as earliest time of end event minu...
Ngày tải lên: 11/08/2014, 23:23
Project Planning Control 4 E Part 7 ppt
... produce and operate integrated project management systems. By using the various regular inputs generated by the different operating departments, these systems can, on demand, give the project manager ... report Perhaps the best evidence that networks are most effective when kept simple is given by the NEDO report referred to in the Preface to the first edition of this book. The relevant p...
Ngày tải lên: 11/08/2014, 23:23
Project Planning Control 4 E Part 8 pps
... basis in Week 0. The second pump was scheduled for delivery in week 4. In the event, both pumps were delivered together in week 4. The client argued that since there was a float of 4 days on ... have been justified. Example 2 The network in Figure 24. 2 shows a sequence for erecting and connecting a set of pumps. The first pump was promised to be delivered by the client on a ‘free issue’...
Ngày tải lên: 11/08/2014, 23:23
Project Planning Control 4 E Part 9 docx
... 4 7 Erect duct A Erect duct B 3 6 Erect frame A Erect beams B 2 5 Erect frame 2 Erect frame 3 1 Erect frame 1 7 7 3 3 4 4 4 2 4 Erect duct A Erect duct B 1 3 Erect frames 1, 2 & beams A Erect ... hours curve dipping below the budget hour line. The percentage-time curves in Figure 27.10 enable the project manager to compare actual percentage complete with planned percentage compl...
Ngày tải lên: 11/08/2014, 23:23
Project Planning Control 4 E Part 10 ppsx
... It can be seen in Table 28.6 that 1 Materials have to be ordered 4 weeks before use. 2 Materials have to be delivered 1 week before use. 3 Materials are paid for 4 weeks after delivery. 4 Labour ... Alternatively, it may be possible to extend Q (Plumbing) to 4 weeks using 2 men per week for the first two weeks and 1 man per week for the next two weeks. At the same time, R (Electrics)...
Ngày tải lên: 11/08/2014, 23:23
Project Planning Control 4 E Part 11 doc
... 40 49 – – + + 3563 5 Days 6 7 8 910 11 12 13 14 15 5 6 7 8 9 10 11 12 13 15 14 Substantive 28 74 42 84 3165 47 16 33 64 5011 3 641 542 4 3826 930 930 1511 Costs 5700 3926 5850 39 34 5863 40 35 6013 42 45 6326 44 55 1083 1083 25 94 4756 3 548 6 640 313 3 14 Week 10 Figure 28.16 Example of integration of tools and techniques Once the decision has been made to proceed with the...
Ngày tải lên: 12/08/2014, 00:20