... separate sheet records the date the revised document is sent to each
recipient and the date of acknowledgement of receipt.
Where changes have been made to one or more pages of a multi-page
document, ... client Date of Meeting :
Subject of Meeting :
Minute Number :
ٗ Client’s telex Date of Telex :
Reference :
Signed by :
ٗ✕ Client’s letter Date of Letter :
10.12.1992
Reference :
SGP 3 641
S...
... TE
E
+ TE
B
+ D
=TL
E
– TE
E
i .e. as the latest time of the end event minus the earliest time of the end event.
It is, therefore, the same as the end slack.
Independent float
The difference between ... days)
S
1
2
6
7
17
1
23
24
21
33
37
1
11
3
4
1
8
9
10
1
14
16
20
1
21
26
28
30
34
35
36
F
2
3
7
8
18
20
24
25
32
34
38
11
12
4
5
6
9
10
13
14
15
19
26...
... produce and operate integrated project management systems.
By using the various regular inputs generated by the different operating
departments, these systems can, on demand, give the project manager ... report
Perhaps the best evidence that networks are most effective when kept simple
is given by the NEDO report referred to in the Preface to the first edition of
this book. The relevant p...
... organized into disciplines or
work areas and eliminates the need to enter
reference numbers into the nodes. Instead the grid
reference numbers (or letters) can be fed into the
computer. The grid ... title can be written and the node need be
no larger than a few millimetres in diameter – if the coordinate method is
used.
The difference (or similarity) between an arrow diagram and a precedence...
... It can be seen in Table
28.6 that
1 Materials have to be ordered 4 weeks before use.
2 Materials have to be delivered 1 week before use.
3 Materials are paid for 4 weeks after delivery.
4 Labour ... weekly. Suppliers and plant hire are paid 4 weeks after
delivery. Materials and plant must be ordered 2 weeks before site
requirement.
9 The average labour rate is £5 per hour or £250 pe...