Project Planning Control 4 E Part 3 ppt

Project Planning Control 4 E Part 3 ppt

Project Planning Control 4 E Part 3 ppt

... separate sheet records the date the revised document is sent to each recipient and the date of acknowledgement of receipt. Where changes have been made to one or more pages of a multi-page document, ... client Date of Meeting : Subject of Meeting : Minute Number : ٗ Client’s telex Date of Telex : Reference : Signed by : ٗ✕ Client’s letter Date of Letter : 10.12.1992 Reference : SGP 3 641 S...
Ngày tải lên : 11/08/2014, 23:23
  • 30
  • 255
  • 0
Project Planning Control 4 E Part 5 pptx

Project Planning Control 4 E Part 5 pptx

... TE E + TE B + D =TL E – TE E i .e. as the latest time of the end event minus the earliest time of the end event. It is, therefore, the same as the end slack. Independent float The difference between ... days) S 1 2 6 7 17 1 23 24 21 33 37 1 11 3 4 1 8 9 10 1 14 16 20 1 21 26 28 30 34 35 36 F 2 3 7 8 18 20 24 25 32 34 38 11 12 4 5 6 9 10 13 14 15 19 26...
Ngày tải lên : 11/08/2014, 23:23
  • 30
  • 151
  • 0
Project Planning Control 4 E Part 7 ppt

Project Planning Control 4 E Part 7 ppt

... produce and operate integrated project management systems. By using the various regular inputs generated by the different operating departments, these systems can, on demand, give the project manager ... report Perhaps the best evidence that networks are most effective when kept simple is given by the NEDO report referred to in the Preface to the first edition of this book. The relevant p...
Ngày tải lên : 11/08/2014, 23:23
  • 30
  • 288
  • 0
Project Planning Control 4 E Part 4 pot

Project Planning Control 4 E Part 4 pot

... organized into disciplines or work areas and eliminates the need to enter reference numbers into the nodes. Instead the grid reference numbers (or letters) can be fed into the computer. The grid ... title can be written and the node need be no larger than a few millimetres in diameter – if the coordinate method is used. The difference (or similarity) between an arrow diagram and a precedence...
Ngày tải lên : 11/08/2014, 23:23
  • 30
  • 154
  • 0
Project Planning Control 4 E Part 8 pps

Project Planning Control 4 E Part 8 pps

... histogram (e) = cumulative ‘S’ curve 33 333 3555555555 533 333 366 645 55 533 22 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 86 91215 18 23 28 33 38 43 48 53 ... the A B C D E 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 2 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 7 5 3 3...
Ngày tải lên : 11/08/2014, 23:23
  • 30
  • 162
  • 0
Project Planning Control 4 E Part 9 docx

Project Planning Control 4 E Part 9 docx

... 4 7 Erect duct A Erect duct B 3 6 Erect frame A Erect beams B 2 5 Erect frame 2 Erect frame 3 1 Erect frame 1 7 7 3 3 4 4 4 2 4 Erect duct A Erect duct B 1 3 Erect frames 1, 2 & beams A Erect ... cooler 37 Erect gallery From boiler 3 ½ 3 1 2½ 12 Erect gallery 22 Erect s.b. pipe 28 Erect seal air pipe 32 Erect w.b. piping 35 Erect s.v. supp 29 Erect feed pipe 15 I...
Ngày tải lên : 11/08/2014, 23:23
  • 30
  • 126
  • 0
Project Planning Control 4 E Part 10 ppsx

Project Planning Control 4 E Part 10 ppsx

... It can be seen in Table 28.6 that 1 Materials have to be ordered 4 weeks before use. 2 Materials have to be delivered 1 week before use. 3 Materials are paid for 4 weeks after delivery. 4 Labour ... weekly. Suppliers and plant hire are paid 4 weeks after delivery. Materials and plant must be ordered 2 weeks before site requirement. 9 The average labour rate is £5 per hour or £250 pe...
Ngày tải lên : 11/08/2014, 23:23
  • 30
  • 181
  • 0
Project Planning Control 4 E Part 11 doc

Project Planning Control 4 E Part 11 doc

... 50 75 3 3 4 4 5 Days 6 7 8 910 11 12 13 14 15 38 6 576 5 04 751 49 6 738 46 4 690 541 808 48 3 721 291 43 7 199 295 277 41 3 185 276 100 150 8 13 101 150 210 31 3 38 6 576 890 132 7 138 6 2065 1850 2755 239 1 35 63 28 74 42 84 31 65 47 16 33 64 5011 3 641 542 4 38 26 5700 39 26 5850 39 34 58 63 40 35 60 13 42 45 632 6 44 55 6 640 210 3...
Ngày tải lên : 12/08/2014, 00:20
  • 30
  • 180
  • 0
Từ khóa: