0
  1. Trang chủ >
  2. Kỹ Thuật - Công Nghệ >
  3. Kĩ thuật Viễn thông >

Seamanship Techniques 2011 E Part 11 pdf

Seamanship Techniques 2011 E Part 11 pdf

Seamanship Techniques 2011 E Part 11 pdf

... Seamanship Techniques RedGreenVessel less than 50 m in lengthrestricted in her ability to manoeuvre.GreenRed, white, red,all-round lightsshown where theycan best be seen.RedRange 2 milesHead ... canGreenGreenConicalSparPillarRedGreenRedRedGreenPreferred channel to starboard, red with green stripe, andred light flashing 2 + 1 (group flashing).GreenRedGreenGreenRedPreferred ... system over the keel area, together withincreased scantlings where considered necessary for the trade. However,no company or shipbuilder can foresee the future and guard against theunexpected...
  • 40
  • 307
  • 0
Seamanship Techniques 2011 E Part 4 pdf

Seamanship Techniques 2011 E Part 4 pdf

... be secured at the head of the sheer legs andthe weight taken. Care should be taken to ensure that men brace themselvesagainst any movement of the shoes in the process of raising the legswhen ... tubularsteel. Wooden derricks, which generally lifted only up to 3 tonnes, havelargely been superseded.At the heel of the derrick (Figure 5.1) either a single flange or adouble flange will be welded ... Derrick arrangement. 111 Lifting Gearpassed over the derrick heads once the derricks have been floated fromtheir crutches.Preventer GuysPreventer guys are to be fitted in addition to slewing guys,...
  • 40
  • 373
  • 0
Seamanship Techniques 2011 E Part 16 pdf

Seamanship Techniques 2011 E Part 16 pdf

... Officer resign?Ans. No. Unlike a safety representative who is elected by thecrew. Safety representatives can be replaced by the crewelecting another person to replace him.27. Qu. Can the Safety ... for a vesselforward of the beam, other than for a vessel being overtaken’.If the situation is considered, it will be seen that the targetvessel is overtaking, and therefore will have the option ... navigatingin heavy ice concentrations are the propellers, especiallywhen the vessel is moving astern, and great care shouldthen be observed. At no time should the vessel attempt tobreak through...
  • 20
  • 351
  • 0
Seamanship Techniques 2011 E Part 2 pps

Seamanship Techniques 2011 E Part 2 pps

... used to sleep in thefo’c’sle head area, and the banging cables tended to keep them awake.Hence they were lashed secure.The more up-to-date thinking is that if the cable is lashed the chanceof ... secured whenthe anchor is deployed.Deck plateDoublerUnderdeck framesHawse pipe (tubularsteel)Bolster (steel)‘D’‘D’ represents the diameter of thehawse pipe and is at least ninetimes the chain ... HOLDERSCable holders (Figure 2.16) are often fitted to large merchant vessels asan alternative to the windlass, and, with recent developments, may beseen on passenger vessels. They have also been popular...
  • 40
  • 361
  • 0
Seamanship Techniques 2011 E Part 3 docx

Seamanship Techniques 2011 E Part 3 docx

... use as a greasecavity.Double and treble sheave purchase blocks are of a similar construction tothe single sheave, except that a partition plate separates the sheaves. Theyare used extensively ... RIGGINGSTEEL WIRE ROPEA steel wire rope is composed of three parts – wires, strands and theheart. The heart is made of natural fibre, though recently synthetic fibrehas been used when resistance ... The stopper should be examined for wear and tearbefore use, and if there is any sign of deterioration, the stopper should berenewed. The mariner should ensure that the stopper is secured, thenpass...
  • 40
  • 380
  • 0
Seamanship Techniques 2011 E Part 6 ppt

Seamanship Techniques 2011 E Part 6 ppt

... Once the slip and bottle screware released, the gripe can be passed back over the boat and the endcleared. However, some gripes are interconnected to the trigger system,and the men in the boat ... weak link securing whichwill part after the painter becomes fully extended and the pressureincreases, causing the safe working load/breaking strain to be exceeded.‘D’ringServicereleaseDeck ... The tiller shall be permanently installed on orlinked to the rudder stock; however, if the lifeboat has a remotesteering mechanism, the tiller may be removable and securelystowed near the...
  • 40
  • 331
  • 0
Seamanship Techniques 2011 E Part 8 potx

Seamanship Techniques 2011 E Part 8 potx

... Checks thatrudder indicatorshows maximum porthelmEase the wheel to Ease the wheel to Allows the wheel to Wheel eased toport ten degrees port ten degrees, return towards the port ten degrees,sir ... you expect wire lifeboat fallsto be. How often would you expect them to be renewed?Ans. Extra flexible steel wire rope (6 × 36 or 17 × 7) wps. To berenewed whenever required, and at no greater ... line being geared down so that nautical miles are registered.There are three dials on the face, one to record tenths of a mile, one torecord miles, and one to record hundreds of miles. The clock...
  • 27
  • 247
  • 0
Seamanship Techniques 2011 E Part 9 docx

Seamanship Techniques 2011 E Part 9 docx

... and DepthMultiple echoesThese are caused by the transmitted pulse being reflected several timesbetween the sea bed and the water surface before its energy is dispersed.Such multiple reflection ... type of echo is a double reflection of the transmitted pulse. Itoccurs when the energy is reflected from the sea bed and then reflectedback from the surface of the water before being received by ... samebarometric pressure.IsothermsThese are lines drawn on a weather map to connect areas of the sametemperature, and they may also be used to express the sea or airtemperatures.29Speed...
  • 40
  • 267
  • 0
Seamanship Techniques 2011 E Part 10 ppsx

Seamanship Techniques 2011 E Part 10 ppsx

... the vessel may be expectedto roll somewhat slowly and independently of the waves. The vessel willprobably experience only moderate angles of roll, and the waves may beexpected to break near ... between the two vessels shall notmake the overtaking vessel a crossing vessel within the meaning of theseRules or relieve her of the duty of keeping clear of the overtaken vesseluntil she is ... the operation.85MeteorologySevere wear of the outer shell plating will be experienced at thewaterline level, and for some height and depth above this level, accordingto the thickness of the...
  • 40
  • 240
  • 0
Seamanship Techniques 2011 E Part 12 pps

Seamanship Techniques 2011 E Part 12 pps

... derricks been lowered or removed?(d) Where applicable, have portable pipes been removedand have the remaining open ends been blanked off? (e) Are rope messengers to hand for securing the helicopterif ... considerable time to secure. In an emergency it may even proveimpossible to secure against water pressure on one side.Regular and extensive maintenance is required on the clips to ensurethey are free ... the second lifebuoy is released when the vesselis on a reciprocal course, a reference line of search can beestablished between the first and second lifebuoys. This wouldbe of considerable help...
  • 40
  • 325
  • 0

Xem thêm

Từ khóa: data mining concepts and techniques 2011 pdftoefl ibt listening e part 21toefl cbt book part 11writing template book part 11teaching academic esl writing part 11963 bài essays mẫu part 11đề thi thử THPTQG 2019 toán THPT chuyên thái bình lần 2 có lời giảiBiện pháp quản lý hoạt động dạy hát xoan trong trường trung học cơ sở huyện lâm thao, phú thọGiáo án Sinh học 11 bài 13: Thực hành phát hiện diệp lục và carôtenôitGiáo án Sinh học 11 bài 13: Thực hành phát hiện diệp lục và carôtenôitGiáo án Sinh học 11 bài 13: Thực hành phát hiện diệp lục và carôtenôitGiáo án Sinh học 11 bài 13: Thực hành phát hiện diệp lục và carôtenôitĐỒ ÁN NGHIÊN CỨU CÔNG NGHỆ KẾT NỐI VÔ TUYẾN CỰ LY XA, CÔNG SUẤT THẤP LPWANNGHIÊN CỨU CÔNG NGHỆ KẾT NỐI VÔ TUYẾN CỰ LY XA, CÔNG SUẤT THẤP LPWAN SLIDEPhát triển du lịch bền vững trên cơ sở bảo vệ môi trường tự nhiên vịnh hạ longNghiên cứu tổng hợp các oxit hỗn hợp kích thƣớc nanomet ce 0 75 zr0 25o2 , ce 0 5 zr0 5o2 và khảo sát hoạt tính quang xúc tác của chúngĐịnh tội danh từ thực tiễn huyện Cần Giuộc, tỉnh Long An (Luận văn thạc sĩ)Thơ nôm tứ tuyệt trào phúng hồ xuân hươngTổ chức và hoạt động của Phòng Tư pháp từ thực tiễn tỉnh Phú Thọ (Luận văn thạc sĩ)Kiểm sát việc giải quyết tố giác, tin báo về tội phạm và kiến nghị khởi tố theo pháp luật tố tụng hình sự Việt Nam từ thực tiễn tỉnh Bình Định (Luận văn thạc sĩ)Tranh tụng tại phiên tòa hình sự sơ thẩm theo pháp luật tố tụng hình sự Việt Nam từ thực tiễn xét xử của các Tòa án quân sự Quân khu (Luận văn thạc sĩ)Giáo án Sinh học 11 bài 14: Thực hành phát hiện hô hấp ở thực vậtGiáo án Sinh học 11 bài 14: Thực hành phát hiện hô hấp ở thực vậtTrách nhiệm của người sử dụng lao động đối với lao động nữ theo pháp luật lao động Việt Nam từ thực tiễn các khu công nghiệp tại thành phố Hồ Chí Minh (Luận văn thạc sĩ)BÀI HOÀN CHỈNH TỔNG QUAN VỀ MẠNG XÃ HỘIMÔN TRUYỀN THÔNG MARKETING TÍCH HỢP