BASIC HAZARDOUS WASTE MANAGEMENT - CHAPTER 4 pot
... subset of regulated hazardous waste. The EPA has now promul- gated regulations for the management of “mixed waste to deal with wastes meeting both hazardous and radioactive waste definitions and ... with Hazardous Waste Management. Haz- ardous wastes and hazardous waste facilities may subject workers to a variety of 10 There is inconsistency in the terminology used...
Ngày tải lên: 11/08/2014, 09:21
... Definition of Hazardous Waste Hazardous Waste Characteristics Listed Hazardous Wastes The “Mixture” and “Derived-From” Rules Hazardous Waste Identification Rule Development The “Contained-In Policy” Topics ... C. Basic hazardous waste management / William C. Blackman, Jr 3rd ed. p. cm. Includes bibliographical references and index. ISBN 1-5 667 0-5 3 3-9 (alk. paper) 1...
Ngày tải lên: 11/08/2014, 09:21
... systems. The 40 CFR 262 Subpart C, Pre-Transport Requirements for Hazardous Waste Generators, makes provision for generators to accumulate as much as 55 gal of hazardous waste, or 1 qt, of acutely hazardous ... alternatives for industrial wastes. (Adapted from Hazardous Waste Management, © 1989, McGraw-Hill, New York. With permission from Charles A. Wentz.) L1533_frame_C07 Page...
Ngày tải lên: 11/08/2014, 09:21
BASIC HAZARDOUS WASTE MANAGEMENT - CHAPTER 14 pot
... Protection Agency. 1994a. UST Program Facts Preventing Releases. Solid Waste and Emergency Response, Washington, D.C., EPA 510-F-9 4- 0 04. U.S. Environmental Protection Agency. 1994b. UST Program Facts ... Detecting Releases. Solid Waste and Emergency Response, Washington, D.C., EPA 510-F-9 4- 0 05. U.S. Environmental Protection Agency. 1994c. UST Program Facts Cleaning Up Releases. S...
Ngày tải lên: 11/08/2014, 09:21
BASIC HAZARDOUS WASTE MANAGEMENT - CHAPTER 2 docx
... 0.5 D 040 Trichloroethylene 0.5 D 041 2 ,4, 5-Trichlorophenol 40 0.0 D 042 2 ,4, 6-Trichlorophenol 2.0 D017 2 ,4, 5-TP (Silvex) 1.0 D 043 Vinyl chloride 0.2 a If o -, m -, and p -cresol ... Wash- ington, D.C., EPA 530-K-9 5-0 01. U.S. Environmental Protection Agency. 1998. Management of Remediation Waste under RCRA. Solid Waste and Emergency Response, Washingto...
Ngày tải lên: 11/08/2014, 09:21
BASIC HAZARDOUS WASTE MANAGEMENT - CHAPTER 5 docx
... Miscellaneous 9 ,42 3,585 818,8 74 10, 242 ,45 9 Multiple SIC in 2 0-3 9 112,177,397 25 ,44 4 ,49 3 137,621,890 No SIC in 2 0-3 9 12,738,725 45 7,907 13,196,632 Totals 2,116 ,45 4,255 46 1,098,829 2,577,553,0 84 Federal ... 17,935,728 4, 465,5 84 22 ,40 1,312 36 Electrical 21 ,47 0,770 12,6 74, 200 34, 144 ,970 37 Transport equipment 91,538,326 10,519,302 102,057,628 38 Measuring, p...
Ngày tải lên: 11/08/2014, 09:21
BASIC HAZARDOUS WASTE MANAGEMENT - CHAPTER 6 pps
... 10 1992 41 3 9,351 17 2 84 0 15 1993 575 12,815 7 2 64 0 15 19 94 547 16,087 NA 295 0 11 1995 676 14, 743 NA 2 94 0 7 1996 45 8 13,950 NA 332 1 120 1997 41 9 13,995 NA 310 0 12 1998 42 1 15, 343 NA 316 ... “Binational Management of Hazardous Waste: The Maquiladora Industry at the U.S Mexico Border,” Environmental Management, 14( 4), pp. 44 1 45 0. Roberts, Alan I. 1985. “Transp...
Ngày tải lên: 11/08/2014, 09:21
BASIC HAZARDOUS WASTE MANAGEMENT - CHAPTER 8 ppt
... Bureau 88 8-6 7 8-6 822 www.montana.edu/wwwated NE Department of Environmental Control, Hazardous Waste Section 40 2 -4 7 1 -4 217 NV Division of Environmental Protection, Bureau of Waste Management 70 2-6 6 7 -4 870 ... Agency. 1994a. The Waste Minimization National Plan, Office of Solid Waste and Emergency Response, Washington, D.C., EPA 530-R-9 4- 0 45 . U.S. Envir...
Ngày tải lên: 11/08/2014, 09:21
BASIC HAZARDOUS WASTE MANAGEMENT - CHAPTER 9 pdf
... D.C., EPA 530-R-9 7-0 48 . U.S. Environmental Protection Agency. 1997a. Introduction to RCRA Corrective Action, Office of Solid Waste and Emergency Response, Washington, D.C., EPA 530-R-9 7-0 65. U.S. ... to contact during the post-closure plan (40 CFR 2 64 and 265.11 7-1 18) Post-closure care consists primarily of groundwater monitoring and maintaining waste containment systems. T...
Ngày tải lên: 11/08/2014, 09:21
BASIC HAZARDOUS WASTE MANAGEMENT - CHAPTER 11 ppt
... Washington, D.C., EPA 54 0-2 -9 0-0 14. U.S. Environmental Protection Agency. 1992. Engineering Bulletin Slurry Walls. Office of Solid Waste and Emergency Response, Washington, D.C., EPA 540 -S-9 2-0 08. U.S. Environmental ... Cement-bentonite cut-off wall. (From Geo-Con Incorporated, 40 75 Monroe- ville Blvd., Suite 40 0, Monroeville, PA 15 146 . With permission.) L1533_frame_...
Ngày tải lên: 11/08/2014, 09:21