Practical Design Calculations for Groundwater and Soil Remediation - Chapter 7 potx
... Benzene 77 0.5 97 0. 176 0.0001–0.05 Toluene 77 0.551 0.110 0.0001–0.05 m -Xylene 77 0 .70 8 0.113 0.0001–0.001 77 0.5 27 0. 070 3 0.001–0.05 Phenol 104 0.855 0.153 0.0001–0.03 Chlorobenzene 77 1.05 ... 3.0 Propane 2.1 9.5 n-Butane 1.8 8.4 n-Pentane 1.4 7. 8 n-Hexane 1.2 7. 4 n-Heptane 1.05 6 .7 n-Octane 0.95 3.2 Ethylene 2 .7 36 Propylene 2.4 11 1,3-Butadiene 2.0 12 Benzene 1...
Ngày tải lên: 10/08/2014, 20:20
... (0 .75 )/(6 .74 ) = 0.111 m/d = 40.6 m/yr (for benzene) v p = (0 .75 )/(2.44) = 0.3 07 m/d = 112 m/yr (for 1,2-DCA) v p = (0 .75 )/(6508) = 0.000115 m/d = 0.04 m/yr (for pyrene) d. The time for 1,2-DCA ... m/day R K b p =+ =+ =11 18 1 275 04 674 ρ φ (.)(. ) . . for benzene R K b p =+ =+ =11 18 032 04 244 ρ φ (.)(. ) . . for 1, 2-DCA R K b p =+ =+ =11 1 8 71 7 04 32 27 ρ φ ( ....
Ngày tải lên: 10/08/2014, 20:20
... Cataloging-in-Publication Data Kuo, Jeff. Practical design calculations for groundwater and soil remediation / Jeff Kuo. p. cm. Includes bibliographical references and index. ISBN 1-5 6 67 0-2 3 8-0 (alk. ... incinerators, and biological systems for groundwater and soil remediation; site assessment and fate analysis of toxics in the environment; RI/FS w...
Ngày tải lên: 10/08/2014, 20:20
Practical Design Calculations for Groundwater and Soil Remediation - Chapter 2 ppt
... LLC II.2 Soil borings and groundwater monitoring wells This section deals with calculations related to installation of soil borings and groundwater monitoring wells and purging before groundwater ... LLC 1,1,1,2-Tetrachloroethane 1 67. 8 0.381 5 0. 077 3.04 200 20 1,1,2,2-Tetrachloroethane 1 67. 8 0.38 2.39 2900 20 Tetrachloroethylene 165.8 25.9 0. 077 2.6 150 20 Tetrachloro...
Ngày tải lên: 10/08/2014, 20:20
Practical Design Calculations for Groundwater and Soil Remediation - Chapter 4 ppsx
... reactor for the following reasons: C C e out in == − 50 1200 005(. )τ Kuo, Jeff "Mass balance concept and reactor design& quot; Practical Design Calculations for Groundwater and Soil Remediation Boca ... summarizes the design equations for batch reactors in which zeroth-, first-, and second-order reactions take place. Table IV.3.A Design Equations for Batch...
Ngày tải lên: 10/08/2014, 20:20
Practical Design Calculations for Groundwater and Soil Remediation - Chapter 5 doc
... void )(G oxygen ) = (280 L)( 279 mg/L) = 78 ,120 mg = 78 .1 g. e. The total available oxygen in the soil moisture and the air void = 1.08 + 78 .1 = 79 .2 g/m 3 soil << 27, 720 g/m 3 soil. Discussion 1. ... nutrient requirement for soil bioremediation The results of a feasibility study indicate that the excavated soil in a stockpile (Example V.2.2) is suitable for...
Ngày tải lên: 10/08/2014, 20:20
Practical Design Calculations for Groundwater and Soil Remediation - Chapter 6 docx
... LLC chapter six Groundwater remediation This chapter starts with design calculations for capture zone and optimal well spacing. The rest of the chapter focuses on design calculations for commonly ... in the groundwater for bioremedi- ation and the optimal molar C:N:P ratio has been determined as 100:10:1, Kuo, Jeff " ;Groundwater remediation& quot; Prac...
Ngày tải lên: 10/08/2014, 20:20
Industrial Safety and Health for Goods and Materials Services - Chapter 4 potx
... (Safety and health for office workers is covered in Industrial Safety and Health for Administrative Services.) Laborers and hand freight, stock, and material movers help load and unload freight and ... employment for warehousing is 555,800 workers. This is approximately 0.4% of the U.S. workforce and 0 .7% of the service industry workforce. FIGURE 4.1 Warehousing provides...
Ngày tải lên: 18/06/2014, 22:20
Industrial Safety and Health for Goods and Materials Services - Chapter 7 ppt
... and death. Thus, the emphasis seen in this book and Industrial Safety and Health for Infrastructure Services, Industrial Safety and Health for Administrative Services, and Industrial Safety and ... groups : poli cies and decisions, person al facto rs, and envir onmen tal factors depicted in Tab les 7. 7, 7. 8, and 7 .9, respec tive ly. While we often think of hazardo...
Ngày tải lên: 18/06/2014, 22:20
Industrial Safety and Health for Goods and Materials Services - Chapter 17 potx
... principles of e rgo- nomics, recognition of hazards and injuries, procedures for reporting haz- ardous conditions, and methods and procedures for early reporting of FIGURE 17. 3 Use a handtruck to avoid ... handled. Additional variables include floor and shoe traction, space constraints, two-handed lifts, size, and stability of the load. 17. 7 PREVENTION AND CONTROL 17. 7.1 E...
Ngày tải lên: 18/06/2014, 22:20