GasTurbine Engineering HandbookSecond Edition phần 3 pptx
... Auxiliary Equipment B 133 .3 Published: 1981 (Reaffirmed year: 1994). ISO 10 436 :19 93 Petroleum and Natural Gas IndustriesÐGeneral purpose Steam Turbine for Refinery Service, 1st Edition. Performance ... (26-10-01)/CHAPTER 4.3D ± 177 ± [141±177 /37 ] 29.10.2001 3: 57PM API Std 619, Rotary-Type Positive Displacement Compressors for Petroleum, Chemical, and Gas Industry Services, 3rd Ed...
Ngày tải lên: 08/08/2014, 17:20
... or multiple spring wave spring Figure 13- 33. Mechanical seal classifications. Bearings and Seals 5 13 G:/GTE/FINAL (26-10-01)/CHAPTER 13. 3D ± 520 ± [467±520/54] 1.11.2001 3: 56PM Herbage, B.S., ``High Speed ... failures of the thrust bearing or Gears 5 23 G:/GTE/FINAL (26-10-01)/CHAPTER 13. 3D ± 482 ± [467±520/54] 1.11.2001 3: 56PM Figure 13- 10. Classic ZN/P curve. Figure 13- 11. Journ...
Ngày tải lên: 08/08/2014, 17:20
... pp. 745 Â ±7 53, 1 934 . 604 Gas Turbine Engineering Handbook //INTEGRA/B&H/GTE/FINAL (26-10-01)/CHAPTER 16.3D ± 559 ± [558±5 83/ 26] 29.10.2001 4:05PM For example: 6db 2 10 db 3: 16 20 db ... installing a mass or masses equal to Figure 17 -3. Balanced rotor. Balancing 587 //INTEGRA/B&H/GTE/FINAL (26-10-01)/CHAPTER 16.3D ± 5 83 ± [558±5 83/ 26] 29.10.2001 4:06PM Bibliography...
Ngày tải lên: 08/08/2014, 17:20
GasTurbine Engineering HandbookSecond Edition phần 1 pot
... 10662±11250 32 13. 5 0.25 75±80% 90±95% 12±16 Regenerative gas turbine natural gas fired 37 5±575 6824±7200 50 6.0 0.25 86± 93% 96±98% 12±16 Combined cycle gas turbine 600±900 62 03 6545 55 4.0 0 .35 86± 93% ... plant 800±1000 5249±5 538 65 4.5 0.4 84±90% 94±96% 28 30 Combined cycle coal gasification 1200±1400 6950± 733 2 49 7.0 1.45 75±85% 90±95% 30 36 Combined cycle fluidized bed 1200±...
Ngày tải lên: 08/08/2014, 17:20
GasTurbine Engineering HandbookSecond Edition phần 2 doc
... 2.5 1 43. 56 3, 7 43, 308 2,291 ,36 5 6, 034 ,672 Heated and humidified compressed air injection 23. 44 21.12 21. 23 9,020 3. 7 157.84 5,597 ,38 8 3, 368 ,35 5 8,965,744 Steam injection 10.11 9.11 22. 13 8954 ... US$ Total Earnings US$ Evaporative cooling 3. 69 3. 32 0 .39 10,891 0.5 135 .67 515,264 39 6,755 912,019 Refrigeration inlet cooling 12.77 11.51 2.5 10,672 2.5 195.74 605,07...
Ngày tải lên: 08/08/2014, 17:20
GasTurbine Engineering HandbookSecond Edition phần 4 doc
... given radius. Figure 6 -30 . Flow patterns in volute. 248 Gas Turbine Engineering Handbook //INTEGRA/B&H/GTE/FINAL (26-10-01)/CHAPTER 6.3D ± 233 ± [219±274/56] 29.10.2001 3: 59PM Examples of the ... (double-suction) 15 (1. 03) 650,000 (18,406) 10,000 (7,457) Multistage 1000 (69) 200,000 (5,6 63) 35 ,000 (26,100) 3. Vertically split Single stage (single-suction) Overhung 30 (2.07) 25...
Ngày tải lên: 08/08/2014, 17:20
GasTurbine Engineering HandbookSecond Edition phần 5 potx
... Velocity triangles for a radial-inflow turbine. 33 0 Gas Turbine Engineering Handbook //INTEGRA/B&H/GTE/FINAL (26-10-01)/CHAPTER 9.3D ± 34 4 ± [33 7 36 9 /33 ] 29.10.2001 4:02PM greater. This type of ... Flow,'' IMechE, Paper No. 0405/015. 33 6 Gas Turbine Engineering Handbook //SYS21///INTEGRA/B&H/GTE/FINAL (26-10-01)/CHAPTER 8.3D ± 33 3 ± [31 9 33 6/18] 29.10.2001...
Ngày tải lên: 08/08/2014, 17:20
GasTurbine Engineering HandbookSecond Edition phần 6 doc
... 18.5 Â ± Â ± 433 Â ± Â ± 0.07 0.006 Â ± RENE 77 (U700) 15 BAL 17 Â ± Â ± 5 .3 3 .35 4.25 Â ± Â ± 0.07 0.02 Â ± IN 738 16 BAL 8 .3 0.2 2.6 1.75 3. 4 3. 4 0.9 Â ± 0.10 0.001 1.75 GTD111 14 BAL 9.5 Â ± 3. 8 1.5 ... corrosion on blade life. 430 Gas Turbine Engineering Handbook G:/GTE/FINAL (26-10-01)/CHAPTER 12.3D ± 442 ± [ 436 ±466 /31 ] 1.11.2001 3: 52PM below 100 Btu/ft 3 (37 28 KJ...
Ngày tải lên: 08/08/2014, 17:20
GasTurbine Engineering HandbookSecond Edition phần 9 pot
... Testing,'' Presented at the SAE Inter- national Ameritech ' 93, Costa Mesa, California, September 27 Â 30 , 19 93, SAE Paper No. 932 633 . Boyce, M.P., Gabriles, G.A., and Meher-Homji, C.B., ``Enhancing ... and Power, Athens, Greece, November 3 Â ±5, 19 93. 690 Gas Turbine Engineering Handbook G:/GTE/FINAL (26-10-01)/CHAPTER 19.3D ± 664 ± [ 634 ±691/58] 1.11.2001 2 :38 PM...
Ngày tải lên: 08/08/2014, 17:20
GasTurbine Engineering HandbookSecond Edition phần 10 docx
... or Maintenance Techniques 7 43 G:/GTE/FINAL (26-10-01)/CHAPTER 21.3D ± 7 63 ± [722±777/56] 1.11.2001 4:00PM Figure 21- 13. Comparison of stress rupture life at 50 ksi/ 135 0 F (34 5 MPa/ 735 C) in service ... vertical Maintenance Techniques 757 G:/GTE/FINAL (26-10-01)/CHAPTER 21.3D ± 738 ± [722±777/56] 1.11.2001 4:00PM nearly 30 0 MW and reaching gas turbine efficiencies in the mid fo...
Ngày tải lên: 08/08/2014, 17:20