ARNOLD, K (1999) Design of Gas-Handling Systems and Facilities (2nd ed ) Episode 2 Part 9 ppt

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 9 ppt

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 9 ppt

... in. H 1 1 VA VA VA 2 2 3 /4 1 1 VA VA 2 2 2 1 1 1 VA VA 2 2 2 VA 1 VA VA VA 2 2 2 ] A 2 1 VA VA 2 2 2 2 } A TA I VA VA 2 2 2 1 A 2 1 A 3 1 VA VA 2 2 2 1 A 2 1 A 4 1 VA VA 2 2 } A 2 1 A 2 1 A 6 1 VA 2 2 2 1 A 2 1 A 3 8 VA VA 2 2 2 1 A 3 3 10 VA VA 2 2 1 A 2 1 A 3 3 12 VA VA 2 2 1 A 2 1 A 3 3 14 VA VA 2 2 1 A 2 { A 3 3 16 VA VA 2 2...

Ngày tải lên: 06/08/2014, 02:20

25 245 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 10 pptx

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 10 pptx

... heat can be recovered and used to heat process fluids. 4 62 Design of GAS-HANDLING Systems and Facilities Often on high-pressure wells two chokes are installed in the flow- line—one ... fuel/air mixture and the pressure rises rapidly through the remainder of the com- pression stroke and the beginning of the "power" stroke, 474 Desig...

Ngày tải lên: 06/08/2014, 02:20

25 422 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 1 Part 9 pdf

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 1 Part 9 pdf

... rate Figure 8 -9. Equilibrium water dew points at different temperatures for gases. 1 92 Design of GAS-HANDLING Systems and Facilities ci H in. _ft_ 18 1 .9 .2 20 15,5 22 12. 8 24 10.8 30 ... at the reboiler conditions of atmospheric pres- 190 Design of GAS-HANDLING Systems and Facilities When MEA is used in the presence of COS...

Ngày tải lên: 06/08/2014, 02:20

25 438 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 1 docx

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 1 docx

... the range of 5 to 20 . * Reviewed for the 199 9 edition by John H. Galey of Paragon Engineering Services, Inc, 25 3 25 2 Design of GAS-HANDLING Systems and Facilities Table 9- 4 Typical ... Typically, high-speed compressors run at a speed of 90 0 to J 20 0 rpm and slow-speed units at speeds of 20 0 to 600 rpm. 24 0 Design of GAS-HAN...

Ngày tải lên: 06/08/2014, 02:20

25 459 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 2 pps

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 2 pps

... Gas Vapor Recovery Flow Rate MMscfd 100 10 5 20 100 2 2 4 0.1 1.0 2. 0 R 2. 0 2. 0 2. 7 2, 7 2. 7 2. 0 2. 0 2. 0 4.0 3.0 3.0 n 1 ! 3 3 .3 1 2 2 1 2 2 Approx. bhp 4,400 440 98 0 3, 92 0 19, 6 02 88 190 380 9 143 28 6 Most Likely Centrifugal High Speed High ... the increased efficiency of compression. 28 2 Design of GAS-HANDLING Systems and Facilities...

Ngày tải lên: 06/08/2014, 02:20

25 351 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 3 potx

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 3 potx

... rod, and piston. Reciprocating Compressors 29 5 Figure 11 -9. API type distance pieces. (Reprinted with permission from API, Std. 618, 3rd Ed. , Feb. 198 6 .) 29 6 Design of GAS-HANDLING ... Design of GAS-HANDLING Systems and Facilities tlon and discharge valves so that the valves can be removed and rein- stalled. These clearances are c...

Ngày tải lên: 06/08/2014, 02:20

25 332 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 4 pdf

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 4 pdf

... 7,500 16,300 18,800 17,700 17,700 17,400 16,300 17,500 16,300 17,500 11 ,20 0 — 12, 300 10 ,20 0 18,300 20 ,000 21 700 23 ,300 15,000 16,700 18,100 1 6 ,90 0 18,300 18,300 20 ,000 20 ,000 20 ,000 20 ,000 23 ,300 21 ,700 25 ,000 25 ,000 25 ,000 25 .000 21 .700 23 ,300 21 ,700 23 ,300 20 ,000 16,700 20 ,000 16,700 Wall ... 1.1 Class 150 300 400 600 90 0 1500 25 00 ~20...

Ngày tải lên: 06/08/2014, 02:20

25 417 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 5 pps

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 5 pps

... (17,50 0) (0.8 5) - (0. 2) ( 12 5) Required thickness = 0.505 + 0 .25 0 = 0.755 in. Use—-in. head (0.8 12 5) W = (0.3 4)( 0.8 12 5)( 12 0) 2 + (1. 9) ( 0.8 12 5)( 12 0) = 4,1631b (c) Cone: _ Pd ~ 2 ... Examined Examined 3 1.00 0.85 0.70 0 .90 0.80 0.65 — 0.60 — — 0.55 on page) 3 52 Design of GAS-HANDLING Systems and Fac...

Ngày tải lên: 06/08/2014, 02:20

25 452 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 6 docx

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 6 docx

... 1 .91 395 1. 02 318 1. 32 3 49 1. 62 374 1. 92 395 1.03 3 19 1.33 350 1.63 375 1 .93 396 1.04 320 1.34 351 J.64 376 1 .94 397 1.05 321 1.35 3 52 1.65 376 1 .95 397 1.06 322 ... 1 .96 398 1.07 323 1.37 353 1.67 378 1 .97 398 1.08 325 1.38 354 1.68 3 79 1 .98 399 1. 09 326 1. 39 355 1. 69 3 79 1 .99 400 1.10 327 1.40...

Ngày tải lên: 06/08/2014, 02:20

25 289 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 7 docx

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 7 docx

... prior to a shut-in, and provide informa- 398 Design of GAS-HANDLING Systems and Facilities evaluated for the third failure mode of this check valve. Check valves are easy. A ... RP J4C, 6th Edition, March 199 8. 3 92 Design of GAS-HANDLING Systems and Facilities charges out a vent or flare system. If the relief scrubber is not adequately...

Ngày tải lên: 06/08/2014, 02:20

25 299 0
w