... Figure 14 -2. Hazard free for production facility. (Source: API RP14 .) Figure 14*4, Continued. 410 Design of GAS-HANDLING Systems and Facilities (text continued from page 40 6) nal ... prior to a shut-in, and provide informa- 398 Design of GAS-HANDLING Systems and Facilities evaluated for the third failure mode of this check valve. Ch...

Ngày tải lên: 06/08/2014, 02:20

25 299 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 1 docx

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 1 docx

... Typically, high-speed compressors run at a speed of 900 to J 20 0 rpm and slow-speed units at speeds of 20 0 to 600 rpm. 24 0 Design of GAS-HANDLING Systems and Facilities The regeneration ... 140°F Reid Vapor Pressure 34 30 26 22 18 14 10 25 ! Grade 34 -25 Grade 30 -25 Grade 26 -25 Grade 22 -25 Grade 18 -25 Grade 14 -25 40 i Grade 34-40 Grad...

Ngày tải lên: 06/08/2014, 02:20

25 459 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 6 docx

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 6 docx

... 322 1.36 353 1.66 377 1.96 398 1. 07 323 1. 37 353 1. 67 378 1. 97 398 1.08 325 1.38 354 1.68 379 1.98 399 1.09 326 1.39 355 1.69 379 1.99 400 1.10 3 27 1.40 356 1 .70 ... 1 .70 380 2. 00 400 1.11 328 1.41 3 57 1 .71 381 — 1. 12 329 1. 42 358 1. 72 3 82 — 1.13 330 1.43 359 1 .73 3 82 — 1.14 331 1.44 360 1 .74 383 1.15...

Ngày tải lên: 06/08/2014, 02:20

25 289 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 8 docx

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 8 docx

... (Courtesy of Jenkins Bros .) 430 Design of GAS-HANDLING Systems and Facilities Table 15 -2 (Continued) Example Specifications of Pipe, Valves, and Fittings Couplings 1 -in. and smaller ... High Temperature Safety Low None (table continued on next page) 422 Design of GAS-HANDLING Systems and Facilities form their work safely and to be...

Ngày tải lên: 06/08/2014, 02:20

25 252 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 13 docx

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 13 docx

... determining, 27 2 - 27 6 packing lubrication system, 316 ratio, overall, 25 3 packing, 29 8-300 specifying, 27 0 - 27 2 pipe sizing, 3 17- 319 stages, determining, 27 2 - 27 6 pipeline booster use, 26 2 use, ... aspirated, 475 blocked, 356 compression, 470 ,4 72 check valves, 28 4 cylinder, 470 , 475 coolers, 28 0, 28 5 diesel, 477 shut-down valves, d...

Ngày tải lên: 06/08/2014, 02:20

25 372 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 1 Part 7 ppsx

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 1 Part 7 ppsx

... I, and computing: 1 42 Design of GAS-HANDLING Systems and Facilities is controlled by ( 1) perforations in the tray deck (sieve trays), ( 2) bubble caps (bubble cap trays), or ( 3) ... rescued promptly and given artificial resuscitation. *Based on 1% hydrogen sulfide = 629 .77 gr/100 scfat 14.696 psia and 59°F, or 101, 325 kPa and 75 °...

Ngày tải lên: 06/08/2014, 02:20

25 391 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 2 pps

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 2 pps

... Gas Vapor Recovery Flow Rate MMscfd 100 10 5 20 100 2 2 4 0.1 1.0 2. 0 R 2. 0 2. 0 2. 7 2, 7 2. 7 2. 0 2. 0 2. 0 4.0 3.0 3.0 n 1 ! 3 3 .3 1 2 2 1 2 2 Approx. bhp 4,400 440 980 3, 920 19,6 02 88 190 380 9 143 28 6 Most Likely Centrifugal High Speed High ... is reached at the exit of a compressor wheel. When this point is reached, flow through the compresso...

Ngày tải lên: 06/08/2014, 02:20

25 351 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 3 potx

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 3 potx

... Design of GAS-HANDLING Systems and Facilities tlon and discharge valves so that the valves can be removed and rein- stalled. These clearances are called fixed clearances and ... contains the rotating parts and on which the cylinders and crossheads are mounted. (Courtesy of Dresser-Rand Company .) 310 Design of GAS-HANDLING Systems...

Ngày tải lên: 06/08/2014, 02:20

25 332 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 4 pdf

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 4 pdf

... 7, 500 16,300 18,800 17, 700 17, 700 17, 400 16,300 17, 500 16,300 17, 500 11 ,20 0 — 12, 300 10 ,20 0 18,300 20 ,000 21 70 0 23 ,300 15,000 16 ,70 0 18,100 1 6,900 18,300 18,300 20 ,000 20 ,000 20 ,000 20 ,000 23 ,300 21 ,70 0 25 ,000 25 ,000 25 ,000 25 .000 21 .70 0 23 ,300 21 ,70 0 23 ,300 20 ,000 16 ,70 0 20 ,000 16 ,70 0 Wall ... 1.1 Class 150 300 400 600 9...

Ngày tải lên: 06/08/2014, 02:20

25 417 0
ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 5 pps

ARNOLD, K. (1999). Design of Gas-Handling Systems and Facilities (2nd ed.) Episode 2 Part 5 pps

... in ( 2) ( 17, 50 0) (0.8 5) - (0. 2) ( 12 5) Required thickness = 0.505 + 0 .25 0 = 0 .75 5 in. Use—-in. head (0.8 12 5) W = (0.3 4)( 0.8 12 5)( 12 0) 2 + (1. 9)( 0.8 12 5)( 12 0) = 4,1631b (c) Cone: _ ... head (a) Skirt: I-°^d + 2 j_j — " r jL 12 _ (0 .2 5) ( 12 0) | 12 = 4.50 ft W = (1 1) ( 12 0) (0...