... 126 P ART T HREE S ELECTED C ASE S TUDIES 1 29 10 Project Selection: Mining, Papua New Guinea 137 Background 137 Mine Waste Management Project 1 39 Initial Risk Assessment ( 199 6– 199 7) 141 First Review Risk Assessment ( 199 9) 147 Second ... a Risk Treatment Strategy 97 Approve Strategy for Implementation 99 Water Utility Example 99 8 Stage 5: Implement the Risk Treatment...
Ngày tải lên : 21/06/2014, 12:20
  • 26
  • 353
  • 0
Triple Bottom Line Risk Management Enhancing Profit Environmental Performance and Community Benefits_6 pptx

Triple Bottom Line Risk Management Enhancing Profit Environmental Performance and Community Benefits_6 pptx

... organization’s risk management ethos and that the risk manage- ment policy states the organization’s commitments to managing risks. The risk management system defines the risk management policy, ... the Risk Treatment Strategy Figure 8.1 Risk management system conceptual framework showing the continuously cyclic nature of risk management. Management commitment Audit T...
Ngày tải lên : 21/06/2014, 12:20
  • 26
  • 257
  • 0
Triple Bottom Line Risk Management Enhancing Profit Environmental Performance and Community Benefits_13 ppt

Triple Bottom Line Risk Management Enhancing Profit Environmental Performance and Community Benefits_13 ppt

... 199 , 275–282 quotient, 13, 23, 24, 29, 39, 46, 72–76, 78, 81, 95 , 97 98 , 153, 157, 165, 167, 1 69, 170, 198 , 202, 203, 206, 2 09, 2 39, 240, 250–254 quotient, definition, 23 reduction, 7, 14, 39, ... 6 technical, 4, 13, 192 threshold, 76–80, 95 , 99 unfamiliar, 6 values, 21, 22, 23 voluntary, 198 weighting, 19 Risk event, gradual, 2 39, 240, 2 49 252, 254, 255, 257, 2 59, 262 i...
Ngày tải lên : 21/06/2014, 12:20
  • 23
  • 292
  • 0
Triple Bottom Line Risk Management Enhancing Profit Environmental Performance and Community Benefits_4 pot

Triple Bottom Line Risk Management Enhancing Profit Environmental Performance and Community Benefits_4 pot

... drawn on risk maps and are very useful for comparing risk pre- sented by highly diverse risk events. In addition, risk maps clearly differentiate be- tween risk events that pose similar risk, but ... risk. The risk threshold, which is dependent on the shape and slope of the cumula- tive risk curve, usually includes events that together contribute between 80 and 95 percent o...
Ngày tải lên : 21/06/2014, 12:20
  • 26
  • 275
  • 0
Triple Bottom Line Risk Management Enhancing Profit Environmental Performance and Community Benefits_8 pot

Triple Bottom Line Risk Management Enhancing Profit Environmental Performance and Community Benefits_8 pot

... 3-1a Mine stud 0.07 0.14 0.17 0.21 99 .77% R1 3-4 Bond 0.05 4 .96 5.73 6 .93 99 .88% R1 3-3 Nursery 0.04 0.71 0.80 0 .96 99 .95 % R1 3-1b Mine rem 0.02 0. 39 0.44 0.53 99 .99 % R1 3-5 AMD 0.00 0.36 0.41 0.50 ... 30.53 40.32 39. 72% R1 1-4 Global 18.28 20.35 22.81 26.87 78. 29% R1 1-5 Mercury 7.72 38. 89 59. 85 110 .95 94 .57% R1 2-1 WTP 2.30 4.67 5.13 5 .90 99 .43% R1 3-6 Coal pile 0...
Ngày tải lên : 21/06/2014, 12:20
  • 26
  • 282
  • 0
Triple Bottom Line Risk Management_4 pptx

Triple Bottom Line Risk Management_4 pptx

... re- sponsible triple bottom line risk management, some of which are: • Provision of a clear understanding of corporate risk use of risk profiles to compare the relative risk between risk events ... organization’s risk management ethos and that the risk manage- ment policy states the organization’s commitments to managing risks. The risk management system defines the...
Ngày tải lên : 21/06/2014, 23:20
  • 26
  • 190
  • 0
Triple Bottom Line Risk Management_7 pptx

Triple Bottom Line Risk Management_7 pptx

... 1.27E- 09 786 9. 97E-07 13 1.26E-05 Road Accident 1.00E-02 - 0.001 1.00E-05 1.00E-05 25 2.53E-04 Loss of supervision 5.89E-04 - 0.001 5.89E-07 5.89E-07 1 5 .97 E-07 Wharf failure 0.001 9. 51E-06 0.1 9. 51E-10 ... 2:54 PM Page 196 Risk Analysis / 207 Figure 13 .9 Comparison of the societal risk quotient for tour risk events and the ANCOLD guideline criteria plotted as an F-N chart....
Ngày tải lên : 21/06/2014, 23:20
  • 26
  • 153
  • 0
Triple Bottom Line Risk Management_9 ppt

Triple Bottom Line Risk Management_9 ppt

... Quality Gradual risk 0.3 0.003 29. 799 44131 42 .98 176627 59. 73 693 642 0.01 99 .40% Pit Wall Pumphouse Gradual risk 0.155 097 04 0.00155 097 1528. 396 594 2165.304602 298 3.203382 0.0001 99 .91 % Waste Perimeter ... Gradual risk 0.78455 596 9 0.00784556 784.0646308 1 092 .55 197 3 1541.663213 0.001 96 . 39% Pit Lake Quality Gradual risk 0.62 098 4847 0.006468 592 648 .90 16475...
Ngày tải lên : 21/06/2014, 23:20
  • 26
  • 194
  • 0
Triple Bottom Line Risk Management_3 doc

Triple Bottom Line Risk Management_3 doc

... constructed during the risk assessment process (Figure 6.8). The Water Utility Example / 99 3672 P-07 5/3/01 2:26 PM Page 99 9. 00E-08 9. 00E-07 9. 90E-07 9. 00E-05 8.10E-07 9. 08E-05 9. 00E-06 9. 00E-06 SUNNY-DAY ... Breach Total Dam Financial Risk Quotient Risk Quotient ($M per year) 3672 P-07 5/3/01 2:26 PM Page 103 9. 00E-11 9. 00E-10 9. 90E-10 9. 00E-08 8.10E-08 1.71E...
Ngày tải lên : 21/06/2014, 23:20
  • 26
  • 200
  • 0
Triple Bottom Line Risk Management_10 potx

Triple Bottom Line Risk Management_10 potx

... 100 897 Install an audible alarm 2 3 Equipment and power fail 20 899 Install link to T01, auto shutoff, dedicated landline 20 30 Equipment fail 20 91 9 290 3672 P-17 5/3/01 3:02 PM Page 290 S UMMARY The ... (Cumulative Risk Strategy Cost at CL 80%) RISK REDUCED (Cumulative Percent Risk) 3672 P-17 5/3/01 3:02 PM Page 291 Risk Acceptance Criteria Corporate Risk Acceptance. The a...