... to the principles of risk management 1 1.1 Introduction 1 1.2 The principles of risk assessment 2 1.3 The risk assessment matrix 3 1.4 Risk evaluation and control 4 1 .5 Dependability 5 1.6 The ... managing risk 19 2.1 Introduction: management failures 19 2.2 An overview of the law in the UK 21 2.3 The Health and Safety at Work etc. Act 1974 24 2.4...
Ngày tải lên: 21/06/2014, 12:20
... ensure the health and safety of the workforce, including the subcontractors. In general the regulations reinforce the requirements of the Health and Safety at Work Act, The Management of Health and ... to: 26 The risk management of safety and dependability © Woodhead Publishing Limited, 2010 There are many other regulations that...
Ngày tải lên: 21/06/2014, 12:20
The Risk Management of Safety and Dependability_5 pot
... elements fails then the whole control system fails. If the control system fails, then the system depends on the reliability of the pressure safety relief valve on the vessel. The safety of the manual ... examined by the use of FMECA (Table 5. 7). It will be seen that the risk of an explosion is unac- ceptably due to the high risk ranking of 4. The...
Ngày tải lên: 21/06/2014, 12:20
The Risk Management of Safety and Dependability_6 pot
... G A Of ce, laboratory buildings, etc. 3 B Process units 50 25 C Stores with fl ammable materials 25 25 15 D Air intake and other sources of ignition 3 252 51 E Liquefi ed gas storage 50 25 25 25 F ... 140 The risk management of safety and dependability © Woodhead Publishing Limited, 2010 The probability of failure of the shutdown system would then be 0.001...
Ngày tải lên: 21/06/2014, 12:20
The Risk Management of Safety and Dependability_7 pot
... order Sample size 123 456 78910 1 95. 00 77.64 63.16 52 .71 45. 07 39.30 34.82 31.23 28.31 25. 89 2 86.46 86.46 75. 14 65. 74 58 .18 52 .07 47.07 42.91 39.42 3 98.30 90.24 81.07 72.87 65. 87 59 .97 54 .96 50 .69 4 98.73 ... between the shaft and the casing. These instruments are used to measure the relative motion of the machine shaft and the machine casing. They respo...
Ngày tải lên: 21/06/2014, 12:20
The Risk Management of Safety and Dependability_8 pdf
... depend on the relative areas, the distance apart, the resistivity of the electrolyte and the chemical composition of the fl uid. 206 The risk management of safety and dependability ... crane working on the construction of a block of fl ats collapsed. The driver was killed as was a member of the public who 198 The ris...
Ngày tải lên: 21/06/2014, 12:20
The Risk Management of Safety and Dependability_10 pdf
... principles, 1–17 dependability, 5 general precepts, 16–17 principles of risk assessment, 2– 3 process, 5, 6 risk evaluation and control, 4 5 legislation and the corporate role, 19– 45 Control of Major ... Security of isolation, therefore, just relied on warning tags, with no other deterrent. 266 The risk management of safety and dependabilit...
Ngày tải lên: 21/06/2014, 12:20
The risk management of safety and dependability_1 pot
... 11.8 0. 954 1000 3281 8 .5 0.898 150 0 4921 5. 3 0.8 45 3000 9843 −4 .5 0.701 6000 196 85 −24 0.471 10000 32808 50 0.264 52 The risk management of safety and dependability © Woodhead Publishing ... view of pontoon and walkway. 56 The risk management of safety and dependability © Woodhead Publishing Limited, 2010 4, 3 an...
Ngày tải lên: 21/06/2014, 23:20
The risk management of safety and dependability_3 pot
... elements fails then the whole control system fails. If the control system fails, then the system depends on the reliability of the pressure safety relief valve on the vessel. The safety of the manual ... examined by the use of FMECA (Table 5. 7). It will be seen that the risk of an explosion is unac- ceptably due to the high risk ranking of 4. The...
Ngày tải lên: 21/06/2014, 23:20
The risk management of safety and dependability_5 doc
... C F F 5 Hours 150 4 3200 54 00 2 250 960 4200 650 Failure hours t 150 5 3200 54 00 0 0 4200 650 14 955 Rearranged in rank order Ranked 1 23 456 7 Status Failure C F C F F F Hours 670 960 150 4 2 250 3200 ... sets Hours 670 150 4 3200 4200 54 00 Failures 1 1 1 1 1 Rank j 1234 5 Cumulative 20 40 60 80 100 Median Rank 12.9 31 .5 50 68 .5 87 190 The risk management...
Ngày tải lên: 21/06/2014, 23:20